PMA P840001S635

Device
Master Restore™, Itrel™, Synergy Intellis™, Vanta™ and Inceptiv™ Spinal Cord Stimulation Systems and Pisces™, Specify™,
Applicant
Medtronic Neuromodulation
PMA number
P840001
Supplement
S635
Product code
LGW
Decision date
2026-10-29
Classification
Neurology
Generic name
Stimulator, spinal-cord, totally implanted for pain relief
Approval order statement
1. Enhanced operator verification of the applicable FactoryWorks processing step and recorded battery pre-weight.2. Addition of pre-weight and post-weight out-of-control action plans to the applicable Process Operation Descriptions.3. Software and Human Machine Interface updates that will automatically reject batteries with fill weights above the established final-fill reasonable limit.4. Introduction of dedicated white work-in-progress trays to distinguish electrolyte-filled batteries and improve line clearance, handling, and traceability.5. Use of an isopropyl alcohol wipe to remove residual electrolyte from battery surfaces before subsequent processing.6. Removal of the Ball Press and Button Press certification prerequisites from the Ball and Button Press Ram Change procedure, allowing Medium Rate Line 2 operators to qualify for press ram changes by completing only the ram-change procedure while supervisors and engineers retain responsibility for operator certification

Current openFDA PMA Record#

Device
Master Restore™, Itrel™, Synergy Intellis™, Vanta™ and Inceptiv™ Spinal Cord Stimulation Systems and Pisces™, Specify™,
Applicant
Medtronic Neuromodulation
PMA number
P840001
Supplement
S635
Product code
LGW
Generic name
Stimulator, spinal-cord, totally implanted for pain relief
Decision date
2026-10-29
Decision code
OK30
Date received
2026-09-30
Supplement type
30-Day Notice
Supplement reason
Process Change - Manufacturer/Sterilizer/Packager/Supplier
Approval order statement
1. Enhanced operator verification of the applicable FactoryWorks processing step and recorded battery pre-weight.2. Addition of pre-weight and post-weight out-of-control action plans to the applicable Process Operation Descriptions.3. Software and Human Machine Interface updates that will automatically reject batteries with fill weights above the established final-fill reasonable limit.4. Introduction of dedicated white work-in-progress trays to distinguish electrolyte-filled batteries and improve line clearance, handling, and traceability.5. Use of an isopropyl alcohol wipe to remove residual electrolyte from battery surfaces before subsequent processing.6. Removal of the Ball Press and Button Press certification prerequisites from the Ball and Button Press Ram Change procedure, allowing Medium Rate Line 2 operators to qualify for press ram changes by completing only the ram-change procedure while supervisors and engineers retain responsibility for operator certification