This medical device record is a pma supplement. A supplement may have changed the device description/function or indication from that approved in the original pma. Be sure to look at the original pma record for more information.
Approval for additional features added to the philos family of pacemakers. The device, as modified, will be marketed under the trade name philos ii and is indicated as follows: rate-adaptive pacing with the philos ii pulse generators is indicated for patients exhibiting chronotropic incompetence and who would benefit from increased pacing rates concurrent with physical activity. Generally accepted indications for long-term cardiac pacing include, but are not limited to: sick sinus syndrome (i. E. Bradycardia-tachycardia syndrome, sinus arrest, sinus bradycardia), sino-atrial (sa) block, second- and third- degree av block, and carotid sinus syndrome. Patients who demonstrate hemodynamic benefit through maintenance of av synchrony should be considered for one of the dual chamber or atrial pacing modes. Dual chamber modes are specifically indicated for treatment of conduction disorders that require both restoration of rate and av synchrony such as av nodal disease, diminished cardiac output or congestive heart failure associated with conduction disturbances, and tachyarrhythmias that are suppressed by chronic pacing. Philos ii slr pulse generators are primarily intended to provide vdd or vddr pacing for patients with a healthy sinus node and av conduction abnormalities. These modes are indicated for patients who need ventricular pacing when adequate atrial rates and adequate intracavitary atrial complexes are present. This includes the presence of complete av block when: 1) atrial contribution is needed for hemodynamic benefit and 2) pacemaker syndrome had existed or is anticipated. Additional indications include normal sinus rhythm and normal av conduction in patients who intermittently need ventricular pacing support.
Device | PHILOS II DR, PHILOS II D, PHILOS II DR-T, PHILOS II SLR, PHILOS II SR, PHILOS II S, AND PROGRAMMER SOFTWARE VERSION A-U |
Classification Name | Implantable Pacemaker Pulse-generator |
Generic Name | Implantable Pacemaker Pulse-generator |
Applicant | BIOTRONIK, INC. |
Date Received | 2003-11-03 |
Decision Date | 2004-03-31 |
PMA | P950037 |
Supplement | S036 |
Product Code | DXY |
Advisory Committee | Cardiovascular |
Supplement Type | Normal 180 Day Track |
Supplement Reason | Change Design/components/specifications/material |
Expedited Review | No |
Combination Product | No |
Applicant Address | BIOTRONIK, INC. 6024 Jean Road lake Oswego, OR 97035 |
Supplement Number | Date | Supplement Type |
---|---|---|
P950037 | Original Filing | |
S243 | 2022-11-23 | 30-day Notice |
S242 | ||
S241 | 2022-11-10 | 30-day Notice |
S240 | 2022-09-26 | Real-time Process |
S239 | 2022-09-22 | 30-day Notice |
S238 | 2022-08-29 | 30-day Notice |
S237 | 2022-08-03 | 30-day Notice |
S236 | 2022-06-17 | 30-day Notice |
S235 | 2022-02-17 | 30-day Notice |
S234 | ||
S233 | 2022-01-05 | Normal 180 Day Track No User Fee |
S232 | ||
S231 | 2021-11-24 | 30-day Notice |
S230 | 2021-09-30 | 30-day Notice |
S229 | ||
S228 | ||
S227 | 2021-07-21 | 30-day Notice |
S226 | 2021-06-21 | 30-day Notice |
S225 | ||
S224 | 2021-06-01 | 30-day Notice |
S223 | 2021-05-05 | 30-day Notice |
S222 | 2021-05-04 | 30-day Notice |
S221 | 2021-03-18 | 30-day Notice |
S220 | ||
S219 | 2021-03-11 | 30-day Notice |
S218 | 2020-11-23 | 30-day Notice |
S217 | 2020-11-02 | 30-day Notice |
S216 | 2020-10-28 | 30-day Notice |
S215 | ||
S214 | 2020-08-10 | Real-time Process |
S213 | ||
S212 | 2020-03-26 | 30-day Notice |
S211 | ||
S210 | ||
S209 | 2019-12-31 | 30-day Notice |
S208 | 2019-11-26 | 30-day Notice |
S207 | ||
S206 | ||
S205 | 2019-09-17 | 30-day Notice |
S204 | 2019-08-15 | Real-time Process |
S203 | 2019-06-20 | 30-day Notice |
S202 | ||
S201 | 2019-04-23 | 30-day Notice |
S200 | ||
S199 | 2018-12-10 | Normal 180 Day Track No User Fee |
S198 | 2018-11-01 | Normal 180 Day Track |
S197 | 2018-09-12 | Normal 180 Day Track |
S196 | 2018-09-04 | 30-day Notice |
S195 | 2018-08-22 | Real-time Process |
S194 | 2018-07-13 | Normal 180 Day Track |
S193 | 2018-07-10 | 30-day Notice |
S192 | 2018-06-14 | 135 Review Track For 30-day Notice |
S191 | 2018-05-18 | 30-day Notice |
S190 | 2018-05-17 | Real-time Process |
S189 | 2018-05-14 | 30-day Notice |
S188 | ||
S187 | 2018-02-23 | 135 Review Track For 30-day Notice |
S186 | 2018-02-09 | Normal 180 Day Track |
S185 | 2018-01-22 | 30-day Notice |
S184 | 2017-11-20 | 30-day Notice |
S183 | 2017-11-20 | Real-time Process |
S182 | 2017-10-18 | Real-time Process |
S181 | 2017-08-23 | Real-time Process |
S180 | 2017-08-14 | 30-day Notice |
S179 | 2017-06-06 | Real-time Process |
S178 | 2017-06-02 | 30-day Notice |
S177 | 2017-05-24 | Real-time Process |
S176 | 2017-05-05 | Real-time Process |
S175 | 2017-04-20 | Real-time Process |
S174 | 2017-04-12 | Real-time Process |
S173 | 2017-02-16 | Normal 180 Day Track |
S172 | 2017-01-03 | 30-day Notice |
S171 | 2016-12-07 | Normal 180 Day Track |
S170 | 2016-11-21 | 30-day Notice |
S169 | 2016-11-21 | Real-time Process |
S168 | 2016-09-23 | 30-day Notice |
S167 | 2016-08-08 | Normal 180 Day Track |
S166 | 2016-07-28 | Normal 180 Day Track |
S165 | 2016-06-09 | Real-time Process |
S164 | 2016-06-06 | Normal 180 Day Track |
S163 | 2016-05-31 | 30-day Notice |
S162 | 2016-03-24 | Real-time Process |
S161 | 2015-12-23 | Normal 180 Day Track |
S160 | 2015-12-16 | Real-time Process |
S159 | ||
S158 | 2015-08-03 | 30-day Notice |
S157 | 2015-06-09 | 30-day Notice |
S156 | 2015-06-01 | Normal 180 Day Track |
S155 | 2015-05-27 | 30-day Notice |
S154 | 2015-05-19 | 30-day Notice |
S153 | 2015-04-29 | 135 Review Track For 30-day Notice |
S152 | 2015-04-16 | 30-day Notice |
S151 | 2015-04-16 | Normal 180 Day Track |
S150 | 2015-03-23 | Normal 180 Day Track |
S149 | 2015-03-06 | 135 Review Track For 30-day Notice |
S148 | 2015-02-13 | Real-time Process |
S147 | 2015-02-04 | 30-day Notice |
S146 | 2015-01-08 | 30-day Notice |
S145 | 2014-11-03 | 30-day Notice |
S144 | 2014-10-31 | 30-day Notice |
S143 | 2014-10-14 | 30-day Notice |
S142 | 2014-09-25 | Normal 180 Day Track |
S141 | 2014-09-24 | 30-day Notice |
S140 | 2014-09-19 | 30-day Notice |
S139 | 2014-08-04 | Normal 180 Day Track |
S138 | 2014-07-28 | Normal 180 Day Track |
S137 | 2014-06-23 | Normal 180 Day Track |
S136 | 2014-06-23 | 30-day Notice |
S135 | 2014-06-13 | Real-time Process |
S134 | 2014-05-30 | 30-day Notice |
S133 | 2013-12-09 | 30-day Notice |
S132 | 2013-11-25 | Normal 180 Day Track |
S131 | 2013-11-07 | Real-time Process |
S130 | 2013-11-05 | 30-day Notice |
S129 | 2013-11-05 | 30-day Notice |
S128 | 2013-08-15 | Real-time Process |
S127 | 2013-07-29 | Real-time Process |
S126 | 2013-07-16 | 30-day Notice |
S125 | 2013-06-03 | Real-time Process |
S124 | 2013-05-20 | Real-time Process |
S123 | 2013-04-29 | 30-day Notice |
S122 | 2013-04-22 | 30-day Notice |
S121 | 2013-04-03 | Real-time Process |
S120 | ||
S119 | 2013-02-05 | Real-time Process |
S118 | 2013-01-14 | 30-day Notice |
S117 | 2012-12-21 | Real-time Process |
S116 | 2012-12-18 | Normal 180 Day Track |
S115 | ||
S114 | 2012-12-03 | 30-day Notice |
S113 | 2012-11-19 | Real-time Process |
S112 | 2012-09-07 | 30-day Notice |
S111 | 2012-08-10 | Real-time Process |
S110 | 2012-07-02 | Real-time Process |
S109 | 2012-06-18 | Real-time Process |
S108 | 2012-04-05 | Real-time Process |
S107 | 2012-04-02 | 135 Review Track For 30-day Notice |
S106 | ||
S105 | 2012-03-01 | Normal 180 Day Track |
S104 | 2012-02-17 | Real-time Process |
S103 | 2012-02-06 | 30-day Notice |
S102 | 2012-01-30 | Real-time Process |
S101 | 2012-01-27 | Real-time Process |
S100 | 2011-11-02 | Normal 180 Day Track |
S099 | 2011-10-03 | Real-time Process |
S098 | 2011-08-19 | Normal 180 Day Track |
S097 | 2011-06-16 | 135 Review Track For 30-day Notice |
S096 | 2011-04-11 | Real-time Process |
S095 | 2011-03-23 | 30-day Notice |
S094 | 2011-03-10 | 30-day Notice |
S093 | ||
S092 | 2010-12-13 | Real-time Process |
S091 | 2010-12-10 | Normal 180 Day Track |
S090 | 2010-11-09 | 30-day Notice |
S089 | 2010-10-28 | Normal 180 Day Track |
S088 | 2010-10-06 | Normal 180 Day Track |
S087 | ||
S086 | 2010-08-20 | 30-day Notice |
S085 | 2010-08-12 | 30-day Notice |
S084 | 2010-07-14 | Normal 180 Day Track |
S083 | 2010-06-08 | Normal 180 Day Track |
S082 | 2010-05-28 | Normal 180 Day Track No User Fee |
S081 | 2010-05-11 | Real-time Process |
S080 | 2010-04-13 | 30-day Notice |
S079 | 2010-03-23 | Normal 180 Day Track |
S078 | 2010-03-02 | Real-time Process |
S077 | 2010-02-12 | 30-day Notice |
S076 | 2009-11-25 | Real-time Process |
S075 | ||
S074 | 2009-11-24 | Real-time Process |
S073 | 2009-09-10 | Real-time Process |
S072 | 2009-07-08 | Normal 180 Day Track |
S071 | 2009-03-23 | Real-time Process |
S070 | 2009-03-06 | 30-day Notice |
S069 | 2009-02-13 | Real-time Process |
S068 | 2009-01-26 | Normal 180 Day Track |
S067 | 2008-11-17 | Normal 180 Day Track |
S066 | 2008-10-31 | Real-time Process |
S065 | 2008-10-17 | Real-time Process |
S064 | 2008-10-17 | Real-time Process |
S063 | 2008-09-05 | 30-day Notice |
S062 | 2008-06-04 | 135 Review Track For 30-day Notice |
S061 | 2008-05-21 | Real-time Process |
S060 | 2008-05-14 | Real-time Process |
S059 | 2008-05-14 | Normal 180 Day Track |
S058 | 2008-03-18 | Real-time Process |
S057 | 2008-02-04 | Normal 180 Day Track |
S056 | 2008-01-07 | Real-time Process |
S055 | 2007-10-23 | Real-time Process |
S054 | 2007-08-13 | Normal 180 Day Track |
S053 | 2007-07-13 | Normal 180 Day Track |
S052 | 2007-06-25 | 30-day Notice |
S051 | 2007-04-10 | Real-time Process |
S050 | 2007-01-22 | Real-time Process |
S049 | 2007-01-11 | Real-time Process |
S048 | 2006-12-13 | Real-time Process |
S047 | 2006-10-12 | Real-time Process |
S046 | 2006-09-11 | Normal 180 Day Track |
S045 | 2006-06-29 | Real-time Process |
S044 | 2006-04-10 | 135 Review Track For 30-day Notice |
S043 | 2006-02-24 | Real-time Process |
S042 | 2005-11-09 | Normal 180 Day Track |
S041 | 2005-09-26 | Real-time Process |
S040 | ||
S039 | 2004-08-09 | Normal 180 Day Track |
S038 | 2004-05-27 | Normal 180 Day Track |
S037 | 2004-02-12 | Real-time Process |
S036 | 2003-11-03 | Normal 180 Day Track |
S035 | 2003-07-28 | Normal 180 Day Track |
S034 | 2003-07-14 | Normal 180 Day Track |
S033 | 2003-06-24 | Normal 180 Day Track |
S032 | 2003-02-28 | Normal 180 Day Track |
S031 | 2003-02-06 | Real-time Process |
S030 | 2003-01-09 | Normal 180 Day Track |
S029 | 2002-11-20 | 30-day Notice |
S028 | 2002-11-15 | Real-time Process |
S027 | ||
S026 | ||
S025 | ||
S024 | 2001-12-31 | Normal 180 Day Track |
S023 | 2002-02-11 | Normal 180 Day Track |
S022 | 2001-09-28 | Real-time Process |
S021 | 2001-07-27 | Normal 180 Day Track |
S020 | 2001-06-11 | Normal 180 Day Track |
S019 | 2001-02-23 | Normal 180 Day Track |
S018 | 2001-01-12 | Real-time Process |
S017 | 2000-09-27 | Normal 180 Day Track |
S016 | 2000-10-06 | Real-time Process |
S015 | 2000-08-07 | Real-time Process |
S014 | 2000-05-30 | 30-day Notice |
S013 | 2000-05-08 | Normal 180 Day Track |
S012 | 2000-05-15 | Real-time Process |
S011 | 2000-04-13 | Real-time Process |
S010 | ||
S009 | 1999-05-14 | Real-time Process |
S008 | 1999-03-01 | Normal 180 Day Track |
S007 | 1999-01-20 | Normal 180 Day Track |
S006 | 1998-12-10 | Normal 180 Day Track |
S005 | 1998-10-26 | Real-time Process |
S004 | 1998-08-31 | Real-time Process |
S003 | 1998-06-09 | Real-time Process |
S002 | 1998-07-06 | Real-time Process |
S001 | 1997-03-31 | Normal 180 Day Track |