This medical device record is a pma supplement. A supplement may have changed the device description/function or indication from that approved in the original pma. Be sure to look at the original pma record for more information.
Approval for the medtronic virtuoso dr/vr models d154a wg/d154vwc implantable cardioverter defibrillators and the concerto - virtuoso v 1. 0 software application model sw002. The medtronic virtuoso dr model d154awg device is indicated as follows: the device is indicated to provide ventricular antitachycardia pacing and ventricular defibrillation for automated treatment of life-threatening ventricular arrhythmias in patients with nyha functional class ii/iii heart failure. In addition, the device is indicated for use in the above patients with atrial tachyarrhythmias, or those patients who are at significant risk of developing atrial tachyarrhythmias. Atrial rhythm management features such as atrial rate stabilization (ars), atrial preference pacing (app), and post mode switch overdrive pacing (pmop) are indicated for the suppression of atrial tachyarrhythmias in icd-indicated patients with atrial septal lead placement and an icd indication. Notes: 1) the icd features of the virtuoso device function the same as other approved medtronic market-released icds. 2) due to the addition of the optivol diagnostic feature, the virtuoso indication is limited to nyha functional class ii/iii heart failure patients who are indicated for an icd. 3) the clinical value of the optivol fluid monitoring diagnostic feature has not been assessed in those patients who do not have fluid retention related symptoms due to heart failure. 4) the use of the device has not been demonstrated to decrease the morbidity related to atrial tachyarrhythmias. 5) the effectiveness of high-frequency burst pacing (atrial 50 hz burst therapy) in terminating device classified atrial tachycardia (at) was found to be 17%, and in terminating device classified atrial fibrillation (af) was found to be 16. 8%, in the vt/at patient population studied. (cont... )
Device | MEDTRONIC VIRTUOSO DR/VR MODELS D154A WG/D154VWC ICDS, CONCERTO - VERTUOSO V1.0 SOFTWARE -SW002, CONEXUS ACTIVATOR 27901 |
Classification Name | Implantable Cardioverter Defibrillator (non-crt) |
Generic Name | Implantable Cardioverter Defibrillator (non-crt) |
Applicant | MEDTRONIC CARDIAC RHYTHM DISEASE MANAGEMENT |
Date Received | 2005-11-23 |
Decision Date | 2006-05-12 |
PMA | P980016 |
Supplement | S062 |
Product Code | LWS |
Advisory Committee | Cardiovascular |
Supplement Type | Normal 180 Day Track |
Supplement Reason | Change Design/components/specifications/material |
Expedited Review | No |
Combination Product | No |
Applicant Address | MEDTRONIC CARDIAC RHYTHM DISEASE MANAGEMENT 8200 Coral Sea Street N.e. ms Mvs11 mounds View, MN 55112 |
Supplement Number | Date | Supplement Type |
---|---|---|
P980016 | Original Filing | |
S847 | 2023-01-23 | 30-day Notice |
S846 | 2023-01-19 | 30-day Notice |
S845 | 2023-01-06 | 30-day Notice |
S844 | ||
S843 | ||
S842 | ||
S841 | 2022-11-16 | 30-day Notice |
S840 | 2022-10-24 | 30-day Notice |
S839 | ||
S838 | 2022-10-18 | 30-day Notice |
S837 | 2022-10-11 | 30-day Notice |
S836 | ||
S835 | 2022-09-13 | 30-day Notice |
S834 | 2022-08-23 | 30-day Notice |
S833 | ||
S832 | 2022-08-09 | 30-day Notice |
S831 | 2022-08-04 | 30-day Notice |
S830 | ||
S829 | 2022-07-21 | 30-day Notice |
S828 | ||
S827 | 2022-07-13 | 30-day Notice |
S826 | 2022-06-27 | 30-day Notice |
S825 | ||
S824 | ||
S823 | 2022-05-20 | 30-day Notice |
S822 | 2022-05-19 | 30-day Notice |
S821 | ||
S820 | ||
S819 | 2022-05-11 | 30-day Notice |
S818 | 2022-05-10 | 30-day Notice |
S817 | ||
S816 | ||
S815 | 2022-04-27 | 30-day Notice |
S814 | 2022-04-22 | 30-day Notice |
S813 | ||
S812 | 2022-04-14 | 30-day Notice |
S811 | 2022-03-30 | 30-day Notice |
S810 | 2022-03-22 | 30-day Notice |
S809 | 2022-03-18 | 30-day Notice |
S808 | 2022-03-10 | 30-day Notice |
S807 | 2022-02-24 | 30-day Notice |
S806 | 2022-01-28 | 30-day Notice |
S805 | ||
S804 | 2022-01-18 | 30-day Notice |
S803 | 2022-01-13 | 30-day Notice |
S802 | ||
S801 | 2021-12-20 | 30-day Notice |
S800 | 2021-11-30 | 30-day Notice |
S799 | 2021-11-19 | 30-day Notice |
S798 | 2021-11-18 | 30-day Notice |
S797 | 2021-11-17 | 30-day Notice |
S796 | 2021-10-22 | 30-day Notice |
S795 | 2021-10-21 | 30-day Notice |
S794 | 2021-10-01 | 30-day Notice |
S793 | 2021-09-22 | 30-day Notice |
S792 | 2021-09-13 | 30-day Notice |
S791 | 2021-09-02 | 30-day Notice |
S790 | 2021-08-23 | 30-day Notice |
S789 | 2021-08-09 | 30-day Notice |
S788 | 2021-07-30 | 30-day Notice |
S787 | 2021-07-09 | 30-day Notice |
S786 | 2021-06-23 | 30-day Notice |
S785 | 2021-05-27 | 30-day Notice |
S784 | ||
S783 | 2021-04-20 | 30-day Notice |
S782 | 2021-04-08 | 30-day Notice |
S781 | 2021-04-06 | 30-day Notice |
S780 | ||
S779 | 2021-03-16 | 30-day Notice |
S778 | 2021-03-11 | 30-day Notice |
S777 | 2021-03-09 | 30-day Notice |
S776 | 2021-03-08 | 30-day Notice |
S775 | ||
S774 | ||
S773 | 2021-02-25 | 30-day Notice |
S772 | ||
S771 | ||
S770 | 2021-02-08 | 30-day Notice |
S769 | 2021-02-05 | 30-day Notice |
S768 | ||
S767 | 2021-01-08 | 30-day Notice |
S766 | 2020-11-25 | 30-day Notice |
S765 | 2020-11-24 | 30-day Notice |
S764 | ||
S763 | 2020-11-19 | 30-day Notice |
S762 | 2020-11-18 | 30-day Notice |
S761 | 2020-11-06 | 30-day Notice |
S760 | 2020-10-23 | 30-day Notice |
S759 | ||
S758 | 2020-10-20 | 30-day Notice |
S757 | 2020-10-14 | 30-day Notice |
S756 | 2020-09-23 | 30-day Notice |
S755 | 2020-09-04 | 30-day Notice |
S754 | 2020-08-28 | 30-day Notice |
S753 | 2020-08-19 | 30-day Notice |
S752 | ||
S751 | 2020-07-27 | 30-day Notice |
S750 | 2020-07-14 | 30-day Notice |
S749 | 2020-07-09 | 30-day Notice |
S748 | ||
S747 | 2020-06-26 | 30-day Notice |
S746 | 2020-06-26 | 30-day Notice |
S745 | 2020-06-18 | 30-day Notice |
S744 | ||
S743 | 2020-06-09 | 30-day Notice |
S742 | ||
S741 | 2020-05-15 | 30-day Notice |
S740 | 2020-04-29 | 30-day Notice |
S739 | 2020-04-08 | 30-day Notice |
S738 | 2020-03-25 | 30-day Notice |
S737 | 2020-03-25 | 30-day Notice |
S736 | 2020-03-16 | 30-day Notice |
S735 | 2020-03-16 | 30-day Notice |
S734 | 2020-03-12 | 30-day Notice |
S733 | 2020-03-10 | 30-day Notice |
S732 | 2020-03-09 | 30-day Notice |
S731 | ||
S730 | ||
S729 | 2020-02-20 | 30-day Notice |
S728 | 2019-12-23 | Real-time Process |
S727 | 2019-12-20 | 30-day Notice |
S726 | 2019-12-11 | 30-day Notice |
S725 | 2019-12-10 | 30-day Notice |
S724 | 2019-11-18 | 30-day Notice |
S723 | 2019-11-12 | 30-day Notice |
S722 | ||
S721 | 2019-10-08 | 30-day Notice |
S720 | 2019-09-16 | 30-day Notice |
S719 | ||
S718 | 2019-08-26 | 30-day Notice |
S717 | 2019-08-01 | 30-day Notice |
S716 | 2019-07-12 | 30-day Notice |
S715 | 2019-07-01 | 30-day Notice |
S714 | 2019-07-01 | 30-day Notice |
S713 | ||
S712 | 2019-06-20 | 30-day Notice |
S711 | 2019-06-11 | 30-day Notice |
S710 | 2019-06-10 | 30-day Notice |
S709 | 2019-05-30 | 30-day Notice |
S708 | 2019-05-20 | 30-day Notice |
S707 | 2019-05-02 | Normal 180 Day Track No User Fee |
S706 | 2019-04-23 | 30-day Notice |
S705 | 2019-04-11 | 30-day Notice |
S704 | 2019-04-03 | 30-day Notice |
S703 | 2019-03-28 | 30-day Notice |
S702 | ||
S701 | 2019-03-11 | 135 Review Track For 30-day Notice |
S700 | 2019-03-04 | 30-day Notice |
S699 | 2019-02-25 | 30-day Notice |
S698 | 2019-01-30 | Normal 180 Day Track No User Fee |
S697 | 2018-11-05 | 30-day Notice |
S696 | 2018-11-01 | 30-day Notice |
S695 | 2018-10-23 | 30-day Notice |
S694 | 2018-10-18 | 30-day Notice |
S693 | 2018-10-18 | 30-day Notice |
S692 | 2018-10-17 | Real-time Process |
S691 | 2018-10-15 | 30-day Notice |
S690 | 2018-10-09 | 30-day Notice |
S689 | 2018-10-09 | 30-day Notice |
S688 | 2018-09-26 | 30-day Notice |
S687 | 2018-09-10 | 30-day Notice |
S686 | 2018-09-07 | Real-time Process |
S685 | 2018-08-22 | Real-time Process |
S684 | 2018-08-17 | 30-day Notice |
S683 | 2018-08-08 | 30-day Notice |
S682 | 2018-07-23 | 30-day Notice |
S681 | 2018-06-28 | Normal 180 Day Track No User Fee |
S680 | 2018-06-25 | Real-time Process |
S679 | 2018-06-19 | 30-day Notice |
S678 | 2018-06-07 | Real-time Process |
S677 | 2018-06-07 | Real-time Process |
S676 | 2018-05-29 | 30-day Notice |
S675 | 2018-05-29 | 30-day Notice |
S674 | 2018-05-16 | 30-day Notice |
S673 | 2018-05-15 | 30-day Notice |
S672 | 2018-04-24 | 30-day Notice |
S671 | 2018-04-23 | 30-day Notice |
S670 | 2018-04-17 | Real-time Process |
S669 | 2018-04-13 | 30-day Notice |
S668 | 2018-04-13 | Normal 180 Day Track |
S667 | 2018-04-12 | 30-day Notice |
S666 | 2018-04-09 | 30-day Notice |
S665 | 2018-04-06 | 30-day Notice |
S664 | 2018-03-30 | 30-day Notice |
S663 | 2018-03-15 | Real-time Process |
S662 | 2018-03-12 | 30-day Notice |
S661 | 2018-03-12 | 30-day Notice |
S660 | 2018-03-09 | 30-day Notice |
S659 | 2018-03-08 | 30-day Notice |
S658 | 2018-02-01 | Real-time Process |
S657 | 2018-01-24 | 30-day Notice |
S656 | 2018-01-18 | 30-day Notice |
S655 | 2017-12-12 | 30-day Notice |
S654 | 2017-12-12 | 30-day Notice |
S653 | 2017-12-04 | Real-time Process |
S652 | 2017-12-01 | 30-day Notice |
S651 | 2017-11-29 | 30-day Notice |
S650 | 2017-11-20 | 30-day Notice |
S649 | 2017-11-16 | Real-time Process |
S648 | 2017-11-15 | 30-day Notice |
S647 | 2017-11-13 | 30-day Notice |
S646 | 2017-11-07 | 30-day Notice |
S645 | 2017-10-02 | 30-day Notice |
S644 | 2017-09-20 | 30-day Notice |
S643 | 2017-09-20 | 30-day Notice |
S642 | 2017-09-20 | 30-day Notice |
S641 | 2017-09-07 | 30-day Notice |
S640 | 2017-09-05 | Real-time Process |
S639 | 2017-09-01 | Real-time Process |
S638 | 2017-08-07 | Real-time Process |
S637 | 2017-06-23 | 30-day Notice |
S636 | 2017-06-07 | 30-day Notice |
S635 | 2017-06-07 | 30-day Notice |
S634 | 2017-05-24 | 30-day Notice |
S633 | 2017-05-18 | 30-day Notice |
S632 | 2017-05-12 | 30-day Notice |
S631 | 2017-04-19 | 30-day Notice |
S630 | 2017-04-03 | 30-day Notice |
S629 | 2017-03-31 | 30-day Notice |
S628 | 2017-03-29 | 30-day Notice |
S627 | 2017-03-13 | 30-day Notice |
S626 | 2017-03-08 | 30-day Notice |
S625 | 2017-02-17 | 30-day Notice |
S624 | 2017-02-09 | Real-time Process |
S623 | 2017-02-09 | 30-day Notice |
S622 | 2017-02-08 | 30-day Notice |
S621 | 2017-02-03 | 30-day Notice |
S620 | 2017-01-31 | Normal 180 Day Track |
S619 | 2017-01-25 | 30-day Notice |
S618 | 2017-01-25 | Real-time Process |
S617 | 2017-01-13 | 30-day Notice |
S616 | 2016-12-15 | Normal 180 Day Track |
S615 | 2016-12-05 | Real-time Process |
S614 | 2016-11-28 | 30-day Notice |
S613 | 2016-11-23 | Real-time Process |
S612 | 2016-11-16 | Normal 180 Day Track |
S611 | 2016-11-14 | 30-day Notice |
S610 | 2016-11-10 | Real-time Process |
S609 | 2016-11-02 | Normal 180 Day Track |
S608 | 2016-10-28 | 30-day Notice |
S607 | 2016-10-19 | 30-day Notice |
S606 | 2016-10-14 | Real-time Process |
S605 | 2016-10-07 | 30-day Notice |
S604 | 2016-09-28 | 30-day Notice |
S603 | 2016-09-27 | 30-day Notice |
S602 | 2016-09-26 | 30-day Notice |
S601 | 2016-09-15 | 30-day Notice |
S600 | 2016-09-08 | Real-time Process |
S599 | 2016-09-06 | 30-day Notice |
S598 | 2016-08-19 | 30-day Notice |
S597 | 2016-07-22 | 30-day Notice |
S596 | 2016-07-13 | Real-time Process |
S595 | 2016-07-01 | 30-day Notice |
S594 | 2016-06-24 | 30-day Notice |
S593 | 2016-06-24 | Real-time Process |
S592 | 2016-06-01 | Normal 180 Day Track |
S591 | 2016-05-17 | 30-day Notice |
S590 | 2016-05-11 | 30-day Notice |
S589 | 2016-05-03 | 30-day Notice |
S588 | 2016-04-29 | 30-day Notice |
S587 | 2016-04-28 | Real-time Process |
S586 | 2016-04-15 | Normal 180 Day Track |
S585 | 2016-04-14 | Real-time Process |
S584 | 2016-04-11 | 30-day Notice |
S583 | 2016-03-31 | 30-day Notice |
S582 | 2016-03-18 | Real-time Process |
S581 | 2016-03-18 | Real-time Process |
S580 | 2016-03-17 | 30-day Notice |
S579 | 2016-03-11 | Normal 180 Day Track |
S578 | 2016-03-04 | 30-day Notice |
S577 | 2016-02-29 | 30-day Notice |
S576 | ||
S575 | 2016-02-25 | 30-day Notice |
S574 | 2016-02-22 | 30-day Notice |
S573 | 2016-02-17 | 30-day Notice |
S572 | 2016-02-11 | Real-time Process |
S571 | 2016-02-08 | 30-day Notice |
S570 | 2016-02-05 | 30-day Notice |
S569 | 2016-02-04 | Real-time Process |
S568 | 2016-02-03 | 30-day Notice |
S567 | 2016-02-02 | 30-day Notice |
S566 | 2016-02-02 | 30-day Notice |
S565 | 2016-01-11 | Real-time Process |
S564 | 2015-12-28 | 30-day Notice |
S563 | 2015-12-18 | Real-time Process |
S562 | 2015-12-01 | Normal 180 Day Track |
S561 | 2015-11-16 | Normal 180 Day Track |
S560 | 2015-10-22 | Real-time Process |
S559 | 2015-10-22 | Real-time Process |
S558 | 2015-10-22 | Real-time Process |
S557 | 2015-10-19 | 30-day Notice |
S556 | 2015-10-16 | Real-time Process |
S555 | 2015-10-13 | Normal 180 Day Track |
S554 | 2015-10-09 | 30-day Notice |
S553 | 2015-09-30 | 30-day Notice |
S552 | 2015-09-30 | 30-day Notice |
S551 | 2015-09-30 | Normal 180 Day Track |
S550 | ||
S549 | 2015-09-15 | 30-day Notice |
S548 | 2015-09-04 | Normal 180 Day Track |
S547 | 2015-08-28 | Real-time Process |
S546 | 2015-08-11 | 30-day Notice |
S545 | ||
S544 | ||
S543 | 2015-07-24 | 30-day Notice |
S542 | 2015-07-21 | 30-day Notice |
S541 | 2015-07-02 | Real-time Process |
S540 | 2015-07-01 | 30-day Notice |
S539 | 2015-06-01 | 30-day Notice |
S538 | 2015-04-17 | 30-day Notice |
S537 | 2015-04-14 | Real-time Process |
S536 | 2015-03-16 | Normal 180 Day Track |
S535 | 2015-03-06 | Real-time Process |
S534 | 2015-03-03 | 30-day Notice |
S533 | 2015-02-18 | 30-day Notice |
S532 | 2015-02-18 | 30-day Notice |
S531 | 2015-02-18 | 30-day Notice |
S530 | 2015-02-06 | 30-day Notice |
S529 | 2015-02-06 | 30-day Notice |
S528 | 2015-02-05 | 30-day Notice |
S527 | 2015-02-05 | 30-day Notice |
S526 | 2015-02-04 | 30-day Notice |
S525 | 2015-02-02 | 30-day Notice |
S524 | 2015-02-02 | 30-day Notice |
S523 | 2015-01-29 | 30-day Notice |
S522 | 2015-01-28 | 30-day Notice |
S521 | 2015-01-23 | Normal 180 Day Track |
S520 | 2015-01-23 | 30-day Notice |
S519 | 2015-01-22 | 30-day Notice |
S518 | 2015-01-20 | 30-day Notice |
S517 | 2015-01-20 | 30-day Notice |
S516 | 2015-01-12 | 30-day Notice |
S515 | 2014-12-24 | 30-day Notice |
S514 | 2014-12-22 | Normal 180 Day Track |
S513 | 2014-12-18 | Real-time Process |
S512 | 2014-12-08 | 30-day Notice |
S511 | 2014-12-05 | 30-day Notice |
S510 | 2014-11-24 | 30-day Notice |
S509 | 2014-11-07 | 30-day Notice |
S508 | 2014-10-14 | 30-day Notice |
S507 | 2014-10-02 | 30-day Notice |
S506 | 2014-09-25 | 30-day Notice |
S505 | 2014-09-19 | 30-day Notice |
S504 | 2014-09-15 | 30-day Notice |
S503 | 2014-09-03 | Real-time Process |
S502 | 2014-09-02 | Normal 180 Day Track |
S501 | 2014-08-27 | 30-day Notice |
S500 | 2014-08-27 | Real-time Process |
S499 | 2014-08-22 | 30-day Notice |
S498 | 2014-08-18 | 30-day Notice |
S497 | 2014-08-15 | 30-day Notice |
S496 | 2014-08-05 | 30-day Notice |
S495 | 2014-08-01 | 30-day Notice |
S494 | 2014-07-24 | 30-day Notice |
S493 | 2014-07-23 | 30-day Notice |
S492 | 2014-07-18 | Normal 180 Day Track |
S491 | 2014-07-15 | 30-day Notice |
S490 | 2014-07-03 | 30-day Notice |
S489 | 2014-07-02 | Real-time Process |
S488 | 2014-06-20 | 30-day Notice |
S487 | 2014-06-18 | 30-day Notice |
S486 | 2014-06-13 | 30-day Notice |
S485 | 2014-05-30 | 30-day Notice |
S484 | 2014-05-23 | 30-day Notice |
S483 | 2014-05-08 | 30-day Notice |
S482 | 2014-04-30 | 30-day Notice |
S481 | 2014-04-18 | Real-time Process |
S480 | 2014-04-01 | 30-day Notice |
S479 | 2014-03-28 | Real-time Process |
S478 | 2014-03-28 | Real-time Process |
S477 | 2014-03-28 | Real-time Process |
S476 | 2014-03-27 | 30-day Notice |
S475 | 2014-03-20 | 30-day Notice |
S474 | 2014-03-19 | Real-time Process |
S473 | 2014-03-18 | 30-day Notice |
S472 | 2014-03-18 | Real-time Process |
S471 | 2014-03-13 | 30-day Notice |
S470 | 2014-03-07 | 30-day Notice |
S469 | 2014-02-27 | 30-day Notice |
S468 | 2014-02-25 | Real-time Process |
S467 | 2014-02-18 | 30-day Notice |
S466 | 2014-02-18 | 30-day Notice |
S465 | 2014-02-18 | 30-day Notice |
S464 | 2014-02-14 | 30-day Notice |
S463 | 2014-02-14 | Real-time Process |
S462 | 2014-01-30 | 30-day Notice |
S461 | 2014-01-30 | 30-day Notice |
S460 | 2014-01-29 | 30-day Notice |
S459 | 2014-01-27 | 30-day Notice |
S458 | 2014-01-24 | 135 Review Track For 30-day Notice |
S457 | 2014-01-22 | 30-day Notice |
S456 | 2014-01-10 | 30-day Notice |
S455 | 2013-12-26 | Real-time Process |
S454 | 2013-12-19 | Real-time Process |
S453 | 2013-12-19 | 30-day Notice |
S452 | 2013-12-18 | Normal 180 Day Track |
S451 | 2013-12-16 | Normal 180 Day Track |
S450 | 2013-11-27 | 30-day Notice |
S449 | 2013-11-20 | 30-day Notice |
S448 | 2013-11-19 | 30-day Notice |
S447 | 2013-11-18 | 30-day Notice |
S446 | 2013-11-18 | 30-day Notice |
S445 | 2013-10-24 | 30-day Notice |
S444 | ||
S443 | 2013-09-27 | 135 Review Track For 30-day Notice |
S442 | 2013-09-24 | 30-day Notice |
S441 | 2013-09-13 | Normal 180 Day Track No User Fee |
S440 | 2013-09-11 | 30-day Notice |
S439 | 2013-09-10 | 30-day Notice |
S438 | 2013-09-06 | 30-day Notice |
S437 | 2013-09-04 | Real-time Process |
S436 | 2013-08-23 | Normal 180 Day Track |
S435 | 2013-08-15 | Normal 180 Day Track |
S434 | ||
S433 | 2013-08-12 | Real-time Process |
S432 | 2013-08-09 | 30-day Notice |
S431 | 2013-08-06 | Real-time Process |
S430 | 2013-07-26 | 30-day Notice |
S429 | 2013-07-26 | 30-day Notice |
S428 | 2013-07-17 | 30-day Notice |
S427 | 2013-07-16 | 30-day Notice |
S426 | 2013-07-10 | Normal 180 Day Track |
S425 | 2013-07-08 | Normal 180 Day Track |
S424 | 2013-07-01 | 30-day Notice |
S423 | 2013-06-26 | 30-day Notice |
S422 | 2013-06-07 | 30-day Notice |
S421 | 2013-06-03 | 30-day Notice |
S420 | 2013-05-29 | 30-day Notice |
S419 | 2013-05-21 | 30-day Notice |
S418 | 2013-05-17 | 30-day Notice |
S417 | 2013-05-17 | Real-time Process |
S416 | 2013-05-13 | Real-time Process |
S415 | 2013-04-26 | 30-day Notice |
S414 | 2013-04-23 | 30-day Notice |
S413 | 2013-04-18 | Real-time Process |
S412 | 2013-04-10 | Normal 180 Day Track No User Fee |
S411 | 2013-04-09 | 30-day Notice |
S410 | 2013-04-09 | 30-day Notice |
S409 | 2013-04-08 | 30-day Notice |
S408 | 2013-04-08 | 30-day Notice |
S407 | 2013-04-08 | 30-day Notice |
S406 | 2013-04-01 | 30-day Notice |
S405 | 2013-03-20 | 30-day Notice |
S404 | 2013-03-11 | 30-day Notice |
S403 | 2013-03-07 | 30-day Notice |
S402 | 2013-03-05 | 30-day Notice |
S401 | 2013-03-04 | 30-day Notice |
S400 | 2013-02-26 | Normal 180 Day Track |
S399 | 2013-02-21 | 30-day Notice |
S398 | 2013-02-21 | Normal 180 Day Track No User Fee |
S397 | 2013-02-20 | 30-day Notice |
S396 | 2013-02-15 | 30-day Notice |
S395 | 2013-01-22 | 30-day Notice |
S394 | 2012-12-19 | Normal 180 Day Track |
S393 | 2012-12-10 | 30-day Notice |
S392 | 2012-11-21 | 30-day Notice |
S391 | 2012-11-16 | 30-day Notice |
S390 | 2012-11-13 | 30-day Notice |
S389 | 2012-11-07 | Normal 180 Day Track |
S388 | 2012-11-01 | Real-time Process |
S387 | 2012-10-19 | 30-day Notice |
S386 | 2012-10-09 | 30-day Notice |
S385 | ||
S384 | 2012-09-27 | Real-time Process |
S383 | 2012-09-10 | 30-day Notice |
S382 | 2012-09-04 | Normal 180 Day Track |
S381 | 2012-08-24 | Real-time Process |
S380 | 2012-08-24 | 30-day Notice |
S379 | 2012-08-23 | 30-day Notice |
S378 | 2012-08-21 | 30-day Notice |
S377 | 2012-08-08 | 30-day Notice |
S376 | 2012-08-07 | Normal 180 Day Track |
S375 | 2012-08-07 | 30-day Notice |
S374 | 2012-08-06 | 30-day Notice |
S373 | 2012-08-03 | 30-day Notice |
S372 | 2012-07-31 | 30-day Notice |
S371 | 2012-07-25 | 30-day Notice |
S370 | 2012-07-25 | 30-day Notice |
S369 | 2012-07-23 | 30-day Notice |
S368 | 2012-07-19 | 30-day Notice |
S367 | 2012-07-18 | 30-day Notice |
S366 | 2012-07-17 | Normal 180 Day Track |
S365 | 2012-07-03 | 30-day Notice |
S364 | 2012-06-29 | Real-time Process |
S363 | 2012-06-19 | Normal 180 Day Track No User Fee |
S362 | 2012-06-14 | Normal 180 Day Track |
S361 | 2012-06-11 | Normal 180 Day Track |
S360 | 2012-06-11 | 135 Review Track For 30-day Notice |
S359 | ||
S358 | 2012-05-31 | 30-day Notice |
S357 | 2012-08-21 | Normal 180 Day Track |
S356 | 2012-05-21 | 30-day Notice |
S355 | 2012-05-17 | 30-day Notice |
S354 | 2012-05-17 | 30-day Notice |
S353 | 2012-05-14 | 30-day Notice |
S352 | 2012-05-11 | 30-day Notice |
S351 | 2012-04-25 | 30-day Notice |
S350 | ||
S349 | 2012-04-11 | 30-day Notice |
S348 | 2012-04-06 | 30-day Notice |
S347 | 2012-04-04 | Real-time Process |
S346 | 2012-03-28 | 30-day Notice |
S345 | 2012-03-09 | 30-day Notice |
S344 | 2012-03-07 | 30-day Notice |
S343 | 2012-03-07 | Normal 180 Day Track |
S342 | 2012-03-05 | 30-day Notice |
S341 | 2012-02-29 | 30-day Notice |
S340 | 2012-02-27 | Real-time Process |
S339 | 2012-02-22 | Real-time Process |
S338 | 2012-02-13 | 30-day Notice |
S337 | 2012-02-09 | 30-day Notice |
S336 | 2012-02-09 | 30-day Notice |
S335 | 2012-02-07 | 30-day Notice |
S334 | 2012-02-03 | 30-day Notice |
S333 | 2011-12-20 | 30-day Notice |
S332 | 2011-11-25 | 30-day Notice |
S331 | 2011-11-21 | Normal 180 Day Track |
S330 | 2011-11-17 | 30-day Notice |
S329 | ||
S328 | 2011-11-14 | 30-day Notice |
S327 | 2011-11-10 | Real-time Process |
S326 | 2011-11-04 | 30-day Notice |
S325 | 2011-10-24 | 135 Review Track For 30-day Notice |
S324 | 2011-10-06 | 30-day Notice |
S323 | 2011-09-19 | Real-time Process |
S322 | 2011-09-16 | 30-day Notice |
S321 | 2011-09-13 | Real-time Process |
S320 | ||
S319 | 2011-08-30 | 30-day Notice |
S318 | 2011-07-20 | 30-day Notice |
S317 | 2011-07-20 | 30-day Notice |
S316 | 2011-07-18 | 30-day Notice |
S315 | 2011-07-18 | 30-day Notice |
S314 | 2011-07-18 | 135 Review Track For 30-day Notice |
S313 | 2011-07-15 | 30-day Notice |
S312 | 2011-07-13 | 30-day Notice |
S311 | 2011-07-08 | 30-day Notice |
S310 | 2011-07-06 | 30-day Notice |
S309 | 2011-06-30 | 30-day Notice |
S308 | 2011-06-28 | 30-day Notice |
S307 | 2011-06-15 | 30-day Notice |
S306 | 2011-06-10 | 30-day Notice |
S305 | 2011-06-09 | 135 Review Track For 30-day Notice |
S304 | 2011-06-08 | 30-day Notice |
S303 | 2011-06-07 | 30-day Notice |
S302 | 2011-05-13 | 30-day Notice |
S301 | 2011-05-10 | 30-day Notice |
S300 | 2011-05-09 | 30-day Notice |
S299 | 2011-04-29 | 30-day Notice |
S298 | 2011-04-28 | Normal 180 Day Track |
S297 | 2011-04-26 | 30-day Notice |
S296 | 2011-04-25 | 30-day Notice |
S295 | 2011-04-25 | Real-time Process |
S294 | 2011-04-15 | 30-day Notice |
S293 | 2011-04-13 | 30-day Notice |
S292 | 2011-04-11 | 30-day Notice |
S291 | 2011-04-06 | 30-day Notice |
S290 | 2011-04-05 | 30-day Notice |
S289 | 2011-04-04 | 30-day Notice |
S288 | 2011-03-22 | 135 Review Track For 30-day Notice |
S287 | ||
S286 | ||
S285 | 2011-03-02 | 30-day Notice |
S284 | 2011-02-18 | 30-day Notice |
S283 | 2011-02-16 | 30-day Notice |
S282 | 2011-02-16 | 30-day Notice |
S281 | 2011-02-15 | 30-day Notice |
S280 | 2011-02-09 | Normal 180 Day Track |
S279 | 2011-02-01 | 30-day Notice |
S278 | 2011-01-31 | 30-day Notice |
S277 | 2011-01-25 | 30-day Notice |
S276 | 2011-01-18 | 30-day Notice |
S275 | 2011-01-18 | 30-day Notice |
S274 | 2011-01-05 | 30-day Notice |
S273 | 2011-01-04 | Normal 180 Day Track |
S272 | 2010-12-20 | 30-day Notice |
S271 | 2010-12-20 | 30-day Notice |
S270 | 2010-12-14 | 30-day Notice |
S269 | 2010-12-09 | 30-day Notice |
S268 | 2010-12-07 | Real-time Process |
S267 | 2010-12-07 | 30-day Notice |
S266 | 2010-11-15 | 30-day Notice |
S265 | 2010-11-12 | 30-day Notice |
S264 | 2010-11-09 | 30-day Notice |
S263 | 2010-10-26 | 30-day Notice |
S262 | 2010-10-15 | 30-day Notice |
S261 | 2010-10-12 | 30-day Notice |
S260 | 2010-09-16 | 30-day Notice |
S259 | 2010-09-14 | 30-day Notice |
S258 | 2010-07-28 | 30-day Notice |
S257 | 2010-07-26 | 30-day Notice |
S256 | 2010-07-23 | 30-day Notice |
S255 | 2010-07-20 | Real-time Process |
S254 | 2010-07-15 | 30-day Notice |
S253 | 2010-07-15 | 30-day Notice |
S252 | 2010-07-08 | Real-time Process |
S251 | 2010-06-30 | 30-day Notice |
S250 | 2010-06-28 | 135 Review Track For 30-day Notice |
S249 | 2010-06-24 | 30-day Notice |
S248 | 2010-06-23 | 30-day Notice |
S247 | 2010-06-18 | 30-day Notice |
S246 | 2010-06-10 | 30-day Notice |
S245 | 2010-06-08 | 30-day Notice |
S244 | 2010-06-02 | 30-day Notice |
S243 | 2010-05-25 | 30-day Notice |
S242 | ||
S241 | 2010-05-20 | Real-time Process |
S240 | 2010-05-17 | Normal 180 Day Track |
S239 | 2010-05-07 | 30-day Notice |
S238 | 2010-05-03 | 30-day Notice |
S237 | 2010-04-22 | Normal 180 Day Track |
S236 | 2010-04-12 | 30-day Notice |
S235 | 2010-03-31 | 30-day Notice |
S234 | 2010-03-31 | Real-time Process |
S233 | 2010-03-29 | 30-day Notice |
S232 | 2010-03-01 | Real-time Process |
S231 | ||
S230 | 2010-02-19 | 135 Review Track For 30-day Notice |
S229 | 2010-02-18 | 30-day Notice |
S228 | 2010-02-18 | 30-day Notice |
S227 | 2010-02-12 | 30-day Notice |
S226 | 2010-02-05 | 30-day Notice |
S225 | 2010-02-04 | 30-day Notice |
S224 | 2010-01-25 | 30-day Notice |
S223 | 2010-01-21 | 30-day Notice |
S222 | 2010-01-19 | 30-day Notice |
S221 | 2010-01-15 | Real-time Process |
S220 | 2010-01-13 | 30-day Notice |
S219 | 2010-01-08 | 30-day Notice |
S218 | 2009-12-23 | Normal 180 Day Track |
S217 | 2009-12-08 | 30-day Notice |
S216 | 2009-12-04 | Normal 180 Day Track |
S215 | 2009-12-02 | 30-day Notice |
S214 | 2009-12-02 | 30-day Notice |
S213 | 2009-11-27 | 30-day Notice |
S212 | 2009-11-23 | 30-day Notice |
S211 | 2009-10-22 | Normal 180 Day Track |
S210 | 2009-10-09 | 30-day Notice |
S209 | 2009-10-08 | Real-time Process |
S208 | 2009-10-08 | Normal 180 Day Track No User Fee |
S207 | 2009-10-02 | 30-day Notice |
S206 | 2009-09-21 | 135 Review Track For 30-day Notice |
S205 | ||
S204 | 2009-09-08 | 30-day Notice |
S203 | 2009-09-08 | 30-day Notice |
S202 | 2009-08-21 | 30-day Notice |
S201 | 2009-08-05 | 30-day Notice |
S200 | ||
S199 | 2009-07-22 | 30-day Notice |
S198 | 2009-06-30 | 30-day Notice |
S197 | 2009-06-17 | Real-time Process |
S196 | 2009-06-11 | 30-day Notice |
S195 | 2009-06-02 | 135 Review Track For 30-day Notice |
S194 | 2009-05-18 | 30-day Notice |
S193 | 2009-04-10 | 30-day Notice |
S192 | 2009-03-30 | 30-day Notice |
S191 | 2009-03-27 | Normal 180 Day Track |
S190 | ||
S189 | 2009-03-25 | 30-day Notice |
S188 | 2009-03-16 | 30-day Notice |
S187 | 2009-03-06 | Normal 180 Day Track |
S186 | 2009-03-06 | 30-day Notice |
S185 | 2009-03-04 | 30-day Notice |
S184 | 2009-03-02 | Normal 180 Day Track |
S183 | 2009-02-23 | Real-time Process |
S182 | 2009-02-23 | 30-day Notice |
S181 | 2009-02-18 | 135 Review Track For 30-day Notice |
S180 | 2009-02-13 | 135 Review Track For 30-day Notice |
S179 | 2009-02-09 | 135 Review Track For 30-day Notice |
S178 | 2009-02-09 | Real-time Process |
S177 | 2009-02-05 | 30-day Notice |
S176 | 2009-01-26 | 30-day Notice |
S175 | 2009-01-16 | Real-time Process |
S174 | 2009-01-13 | 30-day Notice |
S173 | 2008-12-24 | Real-time Process |
S172 | 2008-12-11 | 30-day Notice |
S171 | 2008-12-11 | 30-day Notice |
S170 | 2008-12-03 | 135 Review Track For 30-day Notice |
S169 | 2008-11-26 | 30-day Notice |
S168 | 2008-11-26 | 135 Review Track For 30-day Notice |
S167 | 2008-11-20 | 30-day Notice |
S166 | 2008-11-17 | 135 Review Track For 30-day Notice |
S165 | 2008-11-04 | Normal 180 Day Track |
S164 | 2008-10-22 | Normal 180 Day Track |
S163 | 2008-10-17 | Real-time Process |
S162 | 2008-10-14 | 30-day Notice |
S161 | 2008-10-10 | 30-day Notice |
S160 | 2008-10-06 | 30-day Notice |
S159 | 2008-10-02 | 135 Review Track For 30-day Notice |
S158 | 2008-09-26 | Real-time Process |
S157 | 2008-09-24 | Real-time Process |
S156 | 2008-09-22 | 30-day Notice |
S155 | 2008-09-19 | 30-day Notice |
S154 | 2008-09-19 | 30-day Notice |
S153 | 2008-09-17 | 30-day Notice |
S152 | 2008-09-08 | 30-day Notice |
S151 | ||
S150 | 2008-08-20 | Normal 180 Day Track |
S149 | 2008-08-18 | 30-day Notice |
S148 | 2008-08-11 | 30-day Notice |
S147 | 2008-08-05 | 30-day Notice |
S146 | 2008-08-04 | 135 Review Track For 30-day Notice |
S145 | 2008-07-28 | Normal 180 Day Track |
S144 | 2008-07-25 | 135 Review Track For 30-day Notice |
S143 | 2008-07-23 | 30-day Notice |
S142 | 2008-07-17 | 30-day Notice |
S141 | 2008-07-16 | 30-day Notice |
S140 | 2008-07-02 | 135 Review Track For 30-day Notice |
S139 | 2008-07-02 | 30-day Notice |
S138 | 2008-06-27 | 135 Review Track For 30-day Notice |
S137 | 2008-06-12 | 30-day Notice |
S136 | 2008-06-10 | 30-day Notice |
S135 | 2008-06-09 | Normal 180 Day Track |
S134 | 2008-06-09 | Real-time Process |
S133 | 2008-06-03 | 30-day Notice |
S132 | 2008-06-02 | Normal 180 Day Track No User Fee |
S131 | 2008-05-23 | 30-day Notice |
S130 | 2008-05-21 | Real-time Process |
S129 | 2008-04-14 | 30-day Notice |
S128 | 2008-04-14 | 30-day Notice |
S127 | 2008-04-10 | Real-time Process |
S126 | 2008-03-24 | 30-day Notice |
S125 | 2008-03-21 | 30-day Notice |
S124 | ||
S123 | 2008-03-04 | 30-day Notice |
S122 | 2008-01-25 | 30-day Notice |
S121 | 2008-01-14 | 135 Review Track For 30-day Notice |
S120 | 2007-12-26 | 135 Review Track For 30-day Notice |
S119 | 2007-12-17 | 30-day Notice |
S118 | 2007-12-10 | Real-time Process |
S117 | 2007-11-19 | 30-day Notice |
S116 | 2007-11-19 | 30-day Notice |
S115 | 2007-11-16 | Real-time Process |
S114 | 2007-10-31 | Normal 180 Day Track |
S113 | 2007-10-18 | 30-day Notice |
S112 | 2007-10-11 | 30-day Notice |
S111 | 2007-09-28 | Normal 180 Day Track |
S110 | 2007-09-24 | Normal 180 Day Track No User Fee |
S109 | 2007-09-17 | 135 Review Track For 30-day Notice |
S108 | 2007-08-23 | Special (immediate Track) |
S107 | 2007-08-22 | 30-day Notice |
S106 | 2007-08-13 | 30-day Notice |
S105 | 2007-08-13 | 30-day Notice |
S104 | 2007-07-12 | 30-day Notice |
S103 | 2007-05-31 | 30-day Notice |
S102 | 2007-05-16 | Real-time Process |
S101 | 2007-04-24 | Real-time Process |
S100 | 2007-05-21 | Real-time Process |
S099 | 2007-04-02 | Real-time Process |
S098 | 2007-03-09 | Real-time Process |
S097 | 2007-03-12 | 135 Review Track For 30-day Notice |
S096 | 2007-02-28 | Real-time Process |
S095 | 2007-02-12 | Real-time Process |
S094 | 2007-01-16 | Real-time Process |
S093 | 2006-12-14 | 30-day Notice |
S092 | 2006-12-01 | Normal 180 Day Track No User Fee |
S091 | 2006-11-28 | Real-time Process |
S090 | 2006-11-28 | Real-time Process |
S089 | 2006-10-30 | Real-time Process |
S088 | 2006-10-30 | Normal 180 Day Track No User Fee |
S087 | 2006-10-17 | 30-day Notice |
S086 | 2006-10-10 | Real-time Process |
S085 | 2006-10-03 | Special (immediate Track) |
S084 | 2006-08-24 | Real-time Process |
S083 | 2006-08-21 | Normal 180 Day Track No User Fee |
S082 | 2006-08-03 | 135 Review Track For 30-day Notice |
S081 | 2006-07-28 | Real-time Process |
S080 | 2006-07-20 | 30-day Notice |
S079 | ||
S078 | 2006-07-19 | 30-day Notice |
S077 | 2006-07-17 | 30-day Notice |
S076 | 2006-06-19 | Real-time Process |
S075 | 2006-06-02 | Real-time Process |
S074 | 2006-05-10 | 135 Review Track For 30-day Notice |
S073 | 2006-04-11 | Real-time Process |
S072 | 2006-04-10 | Real-time Process |
S071 | 2006-02-21 | Real-time Process |
S070 | 2006-02-14 | Real-time Process |
S069 | 2006-02-09 | 30-day Notice |
S068 | 2006-02-01 | Special (immediate Track) |
S067 | 2006-01-23 | Real-time Process |
S066 | 2006-01-17 | Real-time Process |
S065 | 2006-01-09 | Real-time Process |
S064 | 2005-12-09 | Normal 180 Day Track |
S063 | 2005-12-08 | Real-time Process |
S062 | 2005-11-23 | Normal 180 Day Track |
S061 | ||
S060 | 2005-10-12 | Real-time Process |
S059 | 2005-10-06 | 135 Review Track For 30-day Notice |
S058 | 2005-10-05 | Real-time Process |
S057 | ||
S056 | 2005-09-16 | Real-time Process |
S055 | 2005-09-13 | Real-time Process |
S054 | 2005-08-23 | Real-time Process |
S053 | 2005-07-29 | Real-time Process |
S052 | 2005-07-26 | 135 Review Track For 30-day Notice |
S051 | 2005-05-05 | Real-time Process |
S050 | 2005-04-15 | Normal 180 Day Track No User Fee |
S049 | ||
S048 | 2005-01-31 | Normal 180 Day Track |
S047 | 2005-01-21 | Real-time Process |
S046 | 2005-01-12 | Normal 180 Day Track |
S045 | 2004-08-27 | 30-day Notice |
S044 | 2004-07-23 | Real-time Process |
S043 | 2004-07-07 | Real-time Process |
S042 | 2004-03-26 | Normal 180 Day Track No User Fee |
S041 | 2004-03-04 | Normal 180 Day Track |
S040 | 2004-01-22 | Real-time Process |
S039 | 2003-11-28 | Real-time Process |
S038 | 2003-10-07 | Real-time Process |
S037 | 2003-09-08 | Real-time Process |
S036 | 2003-08-22 | Normal 180 Day Track No User Fee |
S035 | 2003-07-01 | Real-time Process |
S034 | 2003-03-04 | 30-day Notice |
S033 | 2003-01-27 | Real-time Process |
S032 | 2002-12-24 | Real-time Process |
S031 | 2002-12-20 | Normal 180 Day Track |
S030 | 2002-12-03 | Normal 180 Day Track |
S029 | 2002-06-28 | Normal 180 Day Track |
S028 | 2002-03-27 | Real-time Process |
S027 | 2002-02-27 | Normal 180 Day Track |
S026 | 2002-03-07 | 30-day Notice |
S025 | 2001-12-18 | Real-time Process |
S024 | 2001-11-05 | Special (immediate Track) |
S023 | 2001-10-15 | Normal 180 Day Track |
S022 | 2001-09-24 | 30-day Notice |
S021 | 2001-09-06 | Normal 180 Day Track |
S020 | 2001-08-06 | Normal 180 Day Track |
S019 | 2001-07-17 | 30-day Notice |
S018 | 2001-04-17 | Real-time Process |
S017 | 2001-02-22 | Real-time Process |
S016 | 2001-02-05 | Normal 180 Day Track |
S015 | 2000-11-01 | Real-time Process |
S014 | 2000-09-11 | Real-time Process |
S013 | 2000-08-30 | Normal 180 Day Track |
S012 | 1999-11-08 | Real-time Process |
S011 | 1999-10-21 | Real-time Process |
S010 | 1999-10-21 | Real-time Process |
S009 | ||
S008 | 1999-07-26 | Normal 180 Day Track |
S007 | 1999-07-07 | Normal 180 Day Track |
S006 | 1999-05-26 | Real-time Process |
S005 | 1999-03-31 | Normal 180 Day Track |
S004 | 1999-02-08 | Real-time Process |
S003 | 1999-02-05 | Normal 180 Day Track |
S002 | 1998-12-07 | Normal 180 Day Track |
S001 | 1998-10-30 | Normal 180 Day Track |