This medical device has supplements. The device description/function or indication may have changed. Be sure to look at the supplements to get an up-to-date information on device changes. The labeling included below is the version at time of approval of the original pma or panel track supplement and may not represent the most recent labeling.
Approval for the medtronic. Kappa(tm) 700/600 series pacemakers, which include; medtronic. Kappa(tm) kdr 701, 703, 706, 721, 731, 733, 601, 603, and 606; kd 701, 703, and 706; kvdd 701; and ksr 701, 703, and 706 implantable pacemakers with medtronic. Vision (model 9953e) software. These devices are indicated for the following: rate adaptive pacing in patients who may benefit from increase pacing rates concurrent with increases in activity; accepted patient conditions warranting chronic cardiac pacing which include: - symptomatic parosysmal or permanents second or third-degree av block; - symptomatic bilateral bundle branch block; - symptomatic paroxysmal or transient sinus node dysfunctions with or without assocated av conduction disorders; - bradycardia-tachycardia syndrome to prevent symptomatic bradycardia or some forms of symptomatic tachyarrhythmias; - vasovagal syndromes or hypersensitive carotid sinus syndromes. In addition, medtronic. Kappa(tm) 700/600 series pacemakers are also indicated for dual chamber and atrial tracking modes in patients who may benefit from maintenance of av synchrony. Dual chamber modes are specifically indicated for treatment of conduction disorders that require restoration of both rate and av synchrony, which include: -various degrees of av block to maintain the atrial contribution to cardiac output; -vvi intolerance (e. G. , pacemaker syndrome) in the presence of persistent sinus rhythm. Medtronic. Kappa(tm) 700/600 series pacemakers are also indicated for vdd modes in patients having adequate atrial rates and the following indications: - requirements for ventricular pacing when adequate atrial rates and adequate intracavitary atrial complexes are present. This includes the presence of complete av block when atrial contribution is needed for hemodynamic benefit or when pacemaker syndrome has existed or is anticipated. Normal sinus rhythm and normal av conduction in patients needing ventricular pacing intermittently.
Device | MEDTRONIC KAPPA 700/600 SERIES PULSE GENERATORS AND MODEL 9953 SOFTWARE |
Classification Name | Pulse Generator, Permanent, Implantable |
Generic Name | Pulse Generator, Permanent, Implantable |
Applicant | MEDTRONIC Inc. |
Date Received | 1998-08-25 |
Decision Date | 1999-01-29 |
Notice Date | 1999-08-17 |
PMA | P980035 |
Supplement | S |
Product Code | NVZ |
Docket Number | 99M-2671 |
Advisory Committee | Cardiovascular |
Expedited Review | No |
Combination Product | No |
Applicant Address | MEDTRONIC Inc. 8200 Coral Sea Street Ne ms Mv S11 mounds View, MN 55112 |
Summary: | Summary of Safety and Effectiveness |
Labeling: | Labeling |
Post-Approval Study: | Show Report Schedule and Study Progress |
Approval Order: | Approval Order |
Supplement Number | Date | Supplement Type |
---|---|---|
P980035 | Original Filing | |
S739 | 2023-01-23 | 30-day Notice |
S738 | 2023-01-09 | 30-day Notice |
S737 | 2023-01-09 | 30-day Notice |
S736 | 2022-12-15 | 30-day Notice |
S735 | 2022-11-16 | 30-day Notice |
S734 | 2022-11-16 | 30-day Notice |
S733 | 2022-11-14 | 30-day Notice |
S732 | 2022-10-24 | 30-day Notice |
S731 | 2022-10-19 | 30-day Notice |
S730 | 2022-09-13 | 30-day Notice |
S729 | ||
S728 | 2022-09-13 | 30-day Notice |
S727 | 2022-08-22 | 30-day Notice |
S726 | 2022-08-19 | 30-day Notice |
S725 | 2022-08-02 | 30-day Notice |
S724 | 2022-07-21 | 30-day Notice |
S723 | ||
S722 | 2022-07-13 | 30-day Notice |
S721 | ||
S720 | 2022-06-03 | 30-day Notice |
S719 | 2022-05-26 | 30-day Notice |
S718 | 2022-05-20 | 30-day Notice |
S717 | 2022-05-11 | 30-day Notice |
S716 | ||
S715 | 2022-05-05 | 30-day Notice |
S714 | 2022-04-27 | 30-day Notice |
S713 | 2022-04-22 | 30-day Notice |
S712 | 2022-04-14 | 30-day Notice |
S711 | 2022-03-21 | 30-day Notice |
S710 | 2022-03-18 | 30-day Notice |
S709 | 2022-03-17 | 30-day Notice |
S708 | 2022-03-10 | 30-day Notice |
S707 | 2022-03-02 | 30-day Notice |
S706 | ||
S705 | 2022-02-24 | 30-day Notice |
S704 | 2022-02-23 | 30-day Notice |
S703 | 2022-02-10 | 30-day Notice |
S702 | 2022-01-18 | 30-day Notice |
S701 | 2022-01-13 | 30-day Notice |
S700 | 2022-01-10 | 30-day Notice |
S699 | 2021-12-17 | 30-day Notice |
S698 | 2021-12-02 | 30-day Notice |
S697 | 2021-11-30 | 30-day Notice |
S696 | 2021-11-18 | 30-day Notice |
S695 | 2021-11-17 | 30-day Notice |
S694 | ||
S693 | 2021-10-18 | 30-day Notice |
S692 | 2021-09-22 | 30-day Notice |
S691 | 2021-09-13 | 30-day Notice |
S690 | 2021-08-25 | 30-day Notice |
S689 | 2021-08-09 | 30-day Notice |
S688 | 2021-08-06 | 30-day Notice |
S687 | 2021-07-09 | 30-day Notice |
S686 | 2021-07-02 | 30-day Notice |
S685 | 2021-05-27 | 30-day Notice |
S684 | ||
S683 | ||
S682 | 2021-05-14 | 30-day Notice |
S681 | 2021-04-20 | 30-day Notice |
S680 | 2021-03-19 | 30-day Notice |
S679 | ||
S678 | 2021-03-08 | 30-day Notice |
S677 | ||
S676 | ||
S675 | 2021-02-25 | 30-day Notice |
S674 | ||
S673 | 2021-02-11 | 30-day Notice |
S672 | ||
S671 | ||
S670 | 2020-12-11 | Real-time Process |
S669 | 2020-12-08 | 30-day Notice |
S668 | 2020-12-07 | 30-day Notice |
S667 | ||
S666 | 2020-11-24 | 30-day Notice |
S665 | ||
S664 | ||
S663 | ||
S662 | 2020-11-17 | 30-day Notice |
S661 | 2020-11-13 | 30-day Notice |
S660 | 2020-11-03 | 30-day Notice |
S659 | ||
S658 | ||
S657 | 2020-10-20 | 30-day Notice |
S656 | 2020-10-19 | 30-day Notice |
S655 | ||
S654 | 2020-10-15 | 30-day Notice |
S653 | ||
S652 | 2020-10-02 | 30-day Notice |
S651 | ||
S650 | ||
S649 | ||
S648 | ||
S647 | 2020-09-14 | 30-day Notice |
S646 | ||
S645 | ||
S644 | 2020-09-14 | 30-day Notice |
S643 | 2020-09-11 | 30-day Notice |
S642 | 2020-09-04 | 30-day Notice |
S641 | 2020-09-04 | 30-day Notice |
S640 | 2020-09-03 | 30-day Notice |
S639 | 2020-08-28 | 30-day Notice |
S638 | ||
S637 | ||
S636 | 2020-07-27 | 30-day Notice |
S635 | 2020-07-14 | 30-day Notice |
S634 | 2020-07-09 | 30-day Notice |
S633 | 2020-07-06 | 30-day Notice |
S632 | 2020-07-02 | 30-day Notice |
S631 | 2020-06-26 | 30-day Notice |
S630 | 2020-06-16 | 30-day Notice |
S629 | ||
S628 | ||
S627 | 2020-05-15 | 30-day Notice |
S626 | 2020-04-27 | 30-day Notice |
S625 | 2020-04-08 | 30-day Notice |
S624 | 2020-03-25 | 30-day Notice |
S623 | 2020-03-16 | 30-day Notice |
S622 | 2020-03-16 | 30-day Notice |
S621 | 2020-03-12 | 30-day Notice |
S620 | 2020-03-02 | 30-day Notice |
S619 | ||
S618 | ||
S617 | 2020-02-24 | 30-day Notice |
S616 | ||
S615 | 2020-02-20 | 30-day Notice |
S614 | 2019-12-23 | Real-time Process |
S613 | 2019-12-20 | 30-day Notice |
S612 | 2019-12-11 | 30-day Notice |
S611 | 2019-12-10 | 30-day Notice |
S610 | 2019-11-25 | 30-day Notice |
S609 | 2019-11-18 | 30-day Notice |
S608 | ||
S607 | 2019-11-06 | 30-day Notice |
S606 | 2019-10-08 | 30-day Notice |
S605 | 2019-09-16 | 30-day Notice |
S604 | 2019-08-01 | 30-day Notice |
S603 | 2019-07-29 | 30-day Notice |
S602 | 2019-07-12 | 30-day Notice |
S601 | ||
S600 | 2019-07-01 | 30-day Notice |
S599 | 2019-06-20 | 30-day Notice |
S598 | 2019-06-11 | 30-day Notice |
S597 | 2019-06-10 | 30-day Notice |
S596 | 2019-05-30 | 30-day Notice |
S595 | ||
S594 | ||
S593 | 2019-05-06 | 30-day Notice |
S592 | 2019-04-29 | 30-day Notice |
S591 | 2019-04-29 | 30-day Notice |
S590 | 2019-04-23 | 30-day Notice |
S589 | 2019-04-11 | 30-day Notice |
S588 | 2019-04-08 | 30-day Notice |
S587 | ||
S586 | 2019-04-03 | 30-day Notice |
S585 | 2019-03-28 | 30-day Notice |
S584 | ||
S583 | ||
S582 | ||
S581 | ||
S580 | 2019-03-05 | 30-day Notice |
S579 | 2019-03-04 | 30-day Notice |
S578 | 2019-02-26 | 30-day Notice |
S577 | 2019-02-25 | 30-day Notice |
S576 | 2019-02-05 | Real-time Process |
S575 | 2019-01-23 | 30-day Notice |
S574 | 2018-12-10 | 30-day Notice |
S573 | 2018-11-16 | 30-day Notice |
S572 | 2018-11-08 | 30-day Notice |
S571 | 2018-11-05 | 30-day Notice |
S570 | 2018-11-01 | 30-day Notice |
S569 | 2018-10-26 | 30-day Notice |
S568 | 2018-10-23 | 30-day Notice |
S567 | 2018-10-18 | 30-day Notice |
S566 | 2018-10-15 | 30-day Notice |
S565 | 2018-10-09 | 30-day Notice |
S564 | 2018-09-26 | 30-day Notice |
S563 | 2018-09-13 | 30-day Notice |
S562 | 2018-08-29 | 30-day Notice |
S561 | 2018-08-22 | Real-time Process |
S560 | 2018-08-08 | 30-day Notice |
S559 | 2018-08-06 | 30-day Notice |
S558 | 2018-06-28 | Normal 180 Day Track No User Fee |
S557 | 2018-05-17 | 30-day Notice |
S556 | 2018-05-15 | 30-day Notice |
S555 | 2018-05-14 | 30-day Notice |
S554 | 2018-05-11 | 30-day Notice |
S553 | 2018-05-08 | 30-day Notice |
S552 | 2018-04-25 | 30-day Notice |
S551 | 2018-04-23 | 30-day Notice |
S550 | 2018-04-17 | Real-time Process |
S549 | 2018-04-13 | Normal 180 Day Track |
S548 | 2018-04-12 | 30-day Notice |
S547 | 2018-04-12 | 30-day Notice |
S546 | 2018-04-09 | 30-day Notice |
S545 | 2018-04-06 | 30-day Notice |
S544 | 2018-03-30 | 30-day Notice |
S543 | 2018-03-22 | 30-day Notice |
S542 | 2018-03-22 | 30-day Notice |
S541 | 2018-03-14 | 30-day Notice |
S540 | 2018-03-12 | 30-day Notice |
S539 | 2018-03-12 | 30-day Notice |
S538 | 2018-03-09 | 30-day Notice |
S537 | 2018-03-05 | 30-day Notice |
S536 | 2018-02-12 | Normal 180 Day Track |
S535 | 2018-02-08 | 30-day Notice |
S534 | 2018-02-01 | Real-time Process |
S533 | 2018-02-01 | 30-day Notice |
S532 | 2018-01-29 | Real-time Process |
S531 | 2018-01-24 | 30-day Notice |
S530 | ||
S529 | 2017-11-29 | 30-day Notice |
S528 | 2017-11-20 | 30-day Notice |
S527 | 2017-11-13 | 30-day Notice |
S526 | 2017-11-13 | 30-day Notice |
S525 | 2017-11-07 | 30-day Notice |
S524 | 2017-11-01 | 30-day Notice |
S523 | 2017-10-16 | 30-day Notice |
S522 | 2017-10-06 | 30-day Notice |
S521 | 2017-09-28 | 30-day Notice |
S520 | 2017-09-19 | 30-day Notice |
S519 | 2017-09-05 | Real-time Process |
S518 | 2017-08-31 | Normal 180 Day Track |
S517 | 2017-08-04 | 30-day Notice |
S516 | 2017-07-20 | 30-day Notice |
S515 | 2017-07-20 | 30-day Notice |
S514 | 2017-07-19 | 30-day Notice |
S513 | 2017-07-14 | Real-time Process |
S512 | 2017-06-27 | 30-day Notice |
S511 | 2017-06-23 | 30-day Notice |
S510 | 2017-06-16 | 30-day Notice |
S509 | 2017-06-08 | 30-day Notice |
S508 | 2017-06-07 | 30-day Notice |
S507 | 2017-05-18 | 30-day Notice |
S506 | 2017-05-18 | Normal 180 Day Track |
S505 | 2017-05-15 | 30-day Notice |
S504 | 2017-05-12 | 30-day Notice |
S503 | 2017-05-12 | 30-day Notice |
S502 | 2017-05-12 | 30-day Notice |
S501 | 2017-05-10 | 30-day Notice |
S500 | 2017-05-10 | 30-day Notice |
S499 | 2017-05-10 | 30-day Notice |
S498 | 2017-05-05 | 30-day Notice |
S497 | ||
S496 | 2017-04-04 | 30-day Notice |
S495 | 2017-04-03 | Normal 180 Day Track |
S494 | 2017-03-31 | 30-day Notice |
S493 | 2017-03-29 | 30-day Notice |
S492 | 2017-03-13 | 30-day Notice |
S491 | 2017-03-08 | 30-day Notice |
S490 | 2017-02-09 | 30-day Notice |
S489 | 2017-02-03 | 30-day Notice |
S488 | 2017-02-03 | 30-day Notice |
S487 | 2017-01-13 | 30-day Notice |
S486 | 2016-12-06 | Normal 180 Day Track |
S485 | 2016-11-23 | Real-time Process |
S484 | 2016-11-22 | 30-day Notice |
S483 | 2016-11-16 | Normal 180 Day Track |
S482 | 2016-11-14 | 30-day Notice |
S481 | 2016-11-02 | Normal 180 Day Track |
S480 | 2016-10-31 | 30-day Notice |
S479 | 2016-10-17 | 30-day Notice |
S478 | 2016-09-30 | Real-time Process |
S477 | 2016-09-28 | 30-day Notice |
S476 | 2016-09-26 | 30-day Notice |
S475 | 2016-09-12 | Normal 180 Day Track |
S474 | 2016-09-08 | Real-time Process |
S473 | 2016-08-17 | 30-day Notice |
S472 | 2016-07-22 | 30-day Notice |
S471 | 2016-07-13 | Real-time Process |
S470 | 2016-06-29 | Normal 180 Day Track |
S469 | 2016-06-24 | Real-time Process |
S468 | 2016-06-24 | 30-day Notice |
S467 | 2016-06-22 | 30-day Notice |
S466 | 2016-06-13 | 30-day Notice |
S465 | 2016-06-09 | 30-day Notice |
S464 | 2016-03-11 | Normal 180 Day Track |
S463 | 2016-04-25 | 30-day Notice |
S462 | 2016-04-11 | 30-day Notice |
S461 | 2016-03-31 | 30-day Notice |
S460 | 2016-03-18 | Real-time Process |
S459 | 2016-03-17 | 30-day Notice |
S458 | 2016-02-29 | 30-day Notice |
S457 | 2016-02-25 | 30-day Notice |
S456 | 2016-02-25 | 30-day Notice |
S455 | 2016-02-05 | 30-day Notice |
S454 | 2016-02-02 | 30-day Notice |
S453 | 2016-01-19 | 30-day Notice |
S452 | 2016-01-12 | Real-time Process |
S451 | 2015-12-28 | 30-day Notice |
S450 | 2015-12-18 | Real-time Process |
S449 | 2015-12-16 | 30-day Notice |
S448 | 2015-12-04 | 30-day Notice |
S447 | 2015-12-01 | Normal 180 Day Track |
S446 | 2015-10-22 | Real-time Process |
S445 | 2015-10-22 | Real-time Process |
S444 | 2015-10-19 | 30-day Notice |
S443 | 2015-10-16 | Real-time Process |
S442 | 2015-10-13 | Normal 180 Day Track |
S441 | 2015-09-30 | 30-day Notice |
S440 | 2015-09-30 | 30-day Notice |
S439 | ||
S438 | 2015-08-31 | 30-day Notice |
S437 | 2015-08-28 | Real-time Process |
S436 | 2015-08-12 | 30-day Notice |
S435 | 2015-08-11 | 30-day Notice |
S434 | 2015-08-05 | 30-day Notice |
S433 | 2015-07-20 | 30-day Notice |
S432 | 2015-07-09 | 30-day Notice |
S431 | 2015-07-02 | Real-time Process |
S430 | 2015-07-01 | 30-day Notice |
S429 | 2015-07-01 | 30-day Notice |
S428 | 2015-06-19 | 30-day Notice |
S427 | 2015-06-03 | 30-day Notice |
S426 | 2015-06-01 | 30-day Notice |
S425 | 2015-05-22 | 30-day Notice |
S424 | 2015-04-20 | Normal 180 Day Track |
S423 | 2015-04-17 | 30-day Notice |
S422 | 2015-04-16 | 30-day Notice |
S421 | 2015-04-14 | Real-time Process |
S420 | 2015-03-26 | Real-time Process |
S419 | 2015-03-24 | 30-day Notice |
S418 | 2015-03-24 | 30-day Notice |
S417 | 2015-03-23 | 30-day Notice |
S416 | 2015-03-23 | 30-day Notice |
S415 | 2015-03-06 | Real-time Process |
S414 | 2015-02-06 | 30-day Notice |
S413 | 2015-02-05 | 30-day Notice |
S412 | 2015-02-05 | 30-day Notice |
S411 | 2015-02-04 | 30-day Notice |
S410 | 2015-02-02 | 30-day Notice |
S409 | 2015-02-02 | 30-day Notice |
S408 | 2015-01-29 | 30-day Notice |
S407 | 2015-01-23 | 30-day Notice |
S406 | 2015-01-22 | 30-day Notice |
S405 | 2015-01-20 | 30-day Notice |
S404 | 2014-12-22 | Normal 180 Day Track |
S403 | 2014-12-05 | 30-day Notice |
S402 | 2014-12-04 | 30-day Notice |
S401 | 2014-11-19 | 30-day Notice |
S400 | ||
S399 | ||
S398 | 2014-10-14 | 30-day Notice |
S397 | 2014-10-07 | 30-day Notice |
S396 | 2014-10-02 | 30-day Notice |
S395 | 2014-09-19 | 30-day Notice |
S394 | 2014-09-09 | 30-day Notice |
S393 | 2014-08-27 | 30-day Notice |
S392 | 2014-08-27 | Real-time Process |
S391 | 2014-08-19 | Real-time Process |
S390 | 2014-08-18 | 30-day Notice |
S389 | 2014-08-06 | 30-day Notice |
S388 | 2014-08-01 | 30-day Notice |
S387 | 2014-07-25 | 30-day Notice |
S386 | 2014-07-24 | 30-day Notice |
S385 | 2014-07-23 | 30-day Notice |
S384 | 2014-07-18 | Normal 180 Day Track |
S383 | 2014-07-07 | 30-day Notice |
S382 | 2014-07-02 | Real-time Process |
S381 | 2014-06-19 | 30-day Notice |
S380 | 2014-06-13 | 30-day Notice |
S379 | 2014-06-06 | 30-day Notice |
S378 | 2014-05-23 | 30-day Notice |
S377 | 2014-05-08 | 30-day Notice |
S376 | 2014-05-01 | 30-day Notice |
S375 | 2014-04-25 | 30-day Notice |
S374 | 2014-04-23 | Normal 180 Day Track |
S373 | 2014-03-28 | Real-time Process |
S372 | 2014-03-28 | Real-time Process |
S371 | 2014-03-20 | 30-day Notice |
S370 | 2014-03-20 | 30-day Notice |
S369 | 2014-03-18 | Real-time Process |
S368 | 2014-03-07 | 30-day Notice |
S367 | 2014-02-27 | 30-day Notice |
S366 | 2014-01-30 | 30-day Notice |
S365 | 2014-01-29 | 30-day Notice |
S364 | 2014-01-27 | 30-day Notice |
S363 | 2014-01-22 | 30-day Notice |
S362 | 2013-12-24 | 30-day Notice |
S361 | 2013-12-23 | 30-day Notice |
S360 | 2013-12-19 | Real-time Process |
S359 | 2013-12-19 | 30-day Notice |
S358 | 2013-12-18 | Normal 180 Day Track |
S357 | ||
S356 | 2013-12-12 | 30-day Notice |
S355 | 2013-11-19 | 30-day Notice |
S354 | 2013-10-24 | 30-day Notice |
S353 | 2013-10-24 | 30-day Notice |
S352 | 2013-10-23 | 30-day Notice |
S351 | 2013-10-21 | 30-day Notice |
S350 | 2013-10-17 | 30-day Notice |
S349 | 2013-10-17 | 30-day Notice |
S348 | 2013-09-26 | 30-day Notice |
S347 | 2013-09-24 | 30-day Notice |
S346 | 2013-09-17 | 30-day Notice |
S345 | 2013-09-11 | 30-day Notice |
S344 | 2013-09-03 | 30-day Notice |
S343 | 2013-08-23 | Normal 180 Day Track |
S342 | 2013-08-21 | 30-day Notice |
S341 | 2013-08-12 | Real-time Process |
S340 | 2013-07-26 | 30-day Notice |
S339 | 2013-07-17 | 30-day Notice |
S338 | 2013-07-08 | Normal 180 Day Track |
S337 | 2013-07-02 | 30-day Notice |
S336 | 2013-06-24 | 30-day Notice |
S335 | ||
S334 | 2013-06-11 | Normal 180 Day Track |
S333 | 2013-06-07 | 30-day Notice |
S332 | 2013-06-07 | 30-day Notice |
S331 | 2013-05-30 | 30-day Notice |
S330 | 2013-05-29 | 30-day Notice |
S329 | 2013-05-21 | 30-day Notice |
S328 | 2013-05-17 | 30-day Notice |
S327 | 2013-05-17 | Real-time Process |
S326 | 2013-05-16 | Real-time Process |
S325 | 2013-05-13 | Real-time Process |
S324 | 2013-05-10 | 30-day Notice |
S323 | 2013-04-25 | 30-day Notice |
S322 | 2013-04-23 | 30-day Notice |
S321 | 2013-04-18 | Real-time Process |
S320 | 2013-04-17 | Real-time Process |
S319 | 2013-04-10 | Normal 180 Day Track No User Fee |
S318 | 2013-04-09 | 30-day Notice |
S317 | 2013-03-27 | Real-time Process |
S316 | 2013-03-27 | 30-day Notice |
S315 | 2013-03-13 | 30-day Notice |
S314 | 2013-03-11 | 30-day Notice |
S313 | 2013-03-05 | 30-day Notice |
S312 | 2013-03-04 | 30-day Notice |
S311 | 2013-02-26 | Normal 180 Day Track |
S310 | 2013-02-21 | 30-day Notice |
S309 | 2013-02-21 | 30-day Notice |
S308 | 2013-02-07 | 30-day Notice |
S307 | ||
S306 | 2013-01-29 | 30-day Notice |
S305 | 2013-01-25 | 30-day Notice |
S304 | 2013-01-22 | 30-day Notice |
S303 | 2013-01-14 | 30-day Notice |
S302 | ||
S301 | 2012-11-21 | 30-day Notice |
S300 | 2012-11-15 | 30-day Notice |
S299 | 2012-11-05 | 30-day Notice |
S298 | 2012-11-01 | Real-time Process |
S297 | 2012-10-19 | 30-day Notice |
S296 | 2012-10-19 | Real-time Process |
S295 | 2012-10-05 | 30-day Notice |
S294 | 2012-09-26 | 30-day Notice |
S293 | 2012-09-21 | 30-day Notice |
S292 | 2012-09-10 | 30-day Notice |
S291 | 2012-09-07 | 30-day Notice |
S290 | 2012-08-24 | Real-time Process |
S289 | 2012-08-21 | 30-day Notice |
S288 | 2012-08-21 | 30-day Notice |
S287 | 2012-08-13 | 30-day Notice |
S286 | 2012-08-08 | 30-day Notice |
S285 | 2012-08-03 | 30-day Notice |
S284 | 2012-07-31 | 30-day Notice |
S283 | 2012-07-25 | 30-day Notice |
S282 | 2012-07-25 | 30-day Notice |
S281 | 2012-07-23 | 30-day Notice |
S280 | 2012-07-17 | Normal 180 Day Track |
S279 | 2012-07-13 | 30-day Notice |
S278 | 2012-07-11 | 30-day Notice |
S277 | 2012-06-29 | Normal 180 Day Track |
S276 | 2012-06-29 | 30-day Notice |
S275 | 2012-06-29 | Real-time Process |
S274 | 2012-06-12 | 30-day Notice |
S273 | 2012-06-08 | 30-day Notice |
S272 | 2012-08-21 | Normal 180 Day Track |
S271 | 2012-05-17 | 30-day Notice |
S270 | 2012-08-21 | Normal 180 Day Track |
S269 | ||
S268 | 2012-04-04 | Real-time Process |
S267 | 2012-03-27 | 30-day Notice |
S266 | 2012-03-09 | 30-day Notice |
S265 | 2012-03-07 | 30-day Notice |
S264 | 2012-03-07 | Normal 180 Day Track |
S263 | 2012-03-05 | 30-day Notice |
S262 | 2012-02-29 | 30-day Notice |
S261 | 2012-02-27 | Real-time Process |
S260 | 2012-02-13 | 30-day Notice |
S259 | ||
S258 | 2012-02-07 | 30-day Notice |
S257 | 2012-02-03 | 30-day Notice |
S256 | ||
S255 | 2011-12-20 | 30-day Notice |
S254 | 2011-11-23 | 30-day Notice |
S253 | 2011-11-21 | Normal 180 Day Track |
S252 | 2011-11-17 | 135 Review Track For 30-day Notice |
S251 | ||
S250 | 2011-11-14 | 30-day Notice |
S249 | 2011-11-10 | Real-time Process |
S248 | 2011-10-26 | 30-day Notice |
S247 | 2011-10-25 | 30-day Notice |
S246 | 2011-10-06 | 30-day Notice |
S245 | 2011-10-05 | Real-time Process |
S244 | 2011-09-27 | Real-time Process |
S243 | 2011-09-22 | 30-day Notice |
S242 | 2011-09-19 | Real-time Process |
S241 | 2011-09-16 | 30-day Notice |
S240 | 2011-08-24 | 30-day Notice |
S239 | 2011-07-20 | 30-day Notice |
S238 | 2011-07-18 | 30-day Notice |
S237 | 2011-07-18 | 30-day Notice |
S236 | 2011-07-08 | 30-day Notice |
S235 | 2011-07-06 | 30-day Notice |
S234 | 2011-06-30 | 30-day Notice |
S233 | 2011-06-29 | 30-day Notice |
S232 | 2011-06-28 | 30-day Notice |
S231 | 2011-06-08 | 30-day Notice |
S230 | 2011-06-07 | 30-day Notice |
S229 | 2011-05-27 | 30-day Notice |
S228 | ||
S227 | 2011-05-17 | Real-time Process |
S226 | 2011-05-13 | 30-day Notice |
S225 | 2011-05-10 | 30-day Notice |
S224 | 2011-05-09 | 30-day Notice |
S223 | 2011-05-05 | Normal 180 Day Track No User Fee |
S222 | 2011-04-29 | 30-day Notice |
S221 | 2011-04-26 | 30-day Notice |
S220 | 2011-04-25 | 30-day Notice |
S219 | 2011-04-25 | Real-time Process |
S218 | 2011-04-21 | 30-day Notice |
S217 | 2011-04-19 | 30-day Notice |
S216 | 2011-04-15 | 30-day Notice |
S215 | 2011-04-11 | 30-day Notice |
S214 | 2011-04-05 | 30-day Notice |
S213 | 2011-04-04 | 30-day Notice |
S212 | ||
S211 | 2011-03-22 | 135 Review Track For 30-day Notice |
S210 | ||
S209 | 2011-03-09 | 135 Review Track For 30-day Notice |
S208 | 2011-03-08 | 30-day Notice |
S207 | 2011-03-02 | 30-day Notice |
S206 | 2011-02-18 | 30-day Notice |
S205 | 2011-02-16 | 30-day Notice |
S204 | 2011-02-16 | 30-day Notice |
S203 | 2011-02-03 | 30-day Notice |
S202 | 2011-02-01 | 30-day Notice |
S201 | 2011-01-25 | 30-day Notice |
S200 | 2011-01-04 | Normal 180 Day Track |
S199 | 2010-12-09 | 30-day Notice |
S198 | 2010-12-08 | 30-day Notice |
S197 | 2010-12-07 | Real-time Process |
S196 | 2010-11-17 | 30-day Notice |
S195 | 2010-11-15 | 30-day Notice |
S194 | 2010-11-12 | 30-day Notice |
S193 | 2010-11-12 | 30-day Notice |
S192 | 2010-11-09 | 30-day Notice |
S191 | 2010-10-26 | 30-day Notice |
S190 | 2010-10-15 | 30-day Notice |
S189 | 2010-10-12 | 30-day Notice |
S188 | 2010-09-16 | 30-day Notice |
S187 | 2010-08-13 | 30-day Notice |
S186 | 2010-08-10 | 30-day Notice |
S185 | 2010-07-29 | 30-day Notice |
S184 | 2010-07-28 | 30-day Notice |
S183 | 2010-07-26 | 30-day Notice |
S182 | 2010-07-20 | Real-time Process |
S181 | 2010-07-16 | 30-day Notice |
S180 | 2010-07-15 | 30-day Notice |
S179 | 2010-07-15 | 30-day Notice |
S178 | 2010-06-30 | 30-day Notice |
S177 | 2010-06-28 | 135 Review Track For 30-day Notice |
S176 | 2010-06-28 | 30-day Notice |
S175 | 2010-06-25 | 30-day Notice |
S174 | 2010-06-18 | 30-day Notice |
S173 | 2010-06-15 | Real-time Process |
S172 | 2010-06-10 | 30-day Notice |
S171 | 2010-06-02 | 30-day Notice |
S170 | 2010-05-27 | 30-day Notice |
S169 | 2010-05-20 | Real-time Process |
S168 | 2010-05-17 | Normal 180 Day Track |
S167 | 2010-05-03 | 30-day Notice |
S166 | 2010-04-22 | Normal 180 Day Track |
S165 | 2010-04-12 | 30-day Notice |
S164 | 2010-03-31 | 30-day Notice |
S163 | 2010-03-29 | 30-day Notice |
S162 | 2010-04-29 | Real-time Process |
S161 | 2010-03-01 | Real-time Process |
S160 | 2010-02-19 | 135 Review Track For 30-day Notice |
S159 | 2010-02-18 | 30-day Notice |
S158 | 2010-02-18 | 30-day Notice |
S157 | 2010-01-21 | 30-day Notice |
S156 | 2010-01-13 | 30-day Notice |
S155 | 2009-12-30 | Normal 180 Day Track No User Fee |
S154 | 2009-12-18 | 30-day Notice |
S153 | 2009-12-16 | Normal 180 Day Track |
S152 | 2009-12-08 | 30-day Notice |
S151 | 2009-12-07 | 30-day Notice |
S150 | 2009-12-02 | Normal 180 Day Track |
S149 | 2009-11-27 | 30-day Notice |
S148 | 2009-11-23 | 30-day Notice |
S147 | 2009-11-17 | Real-time Process |
S146 | 2009-10-08 | Normal 180 Day Track No User Fee |
S145 | 2009-10-08 | Real-time Process |
S144 | ||
S143 | 2009-09-11 | 30-day Notice |
S142 | 2009-09-08 | 30-day Notice |
S141 | 2009-09-08 | 30-day Notice |
S140 | 2009-07-28 | Real-time Process |
S139 | 2009-06-30 | 30-day Notice |
S138 | 2009-06-17 | Real-time Process |
S137 | 2009-06-11 | 30-day Notice |
S136 | 2009-03-27 | Normal 180 Day Track |
S135 | ||
S134 | 2009-03-06 | Normal 180 Day Track |
S133 | 2009-03-06 | 30-day Notice |
S132 | 2009-03-05 | 30-day Notice |
S131 | 2009-03-02 | Normal 180 Day Track |
S130 | 2009-02-18 | 135 Review Track For 30-day Notice |
S129 | 2009-02-13 | 135 Review Track For 30-day Notice |
S128 | 2009-02-09 | 135 Review Track For 30-day Notice |
S127 | 2009-02-02 | 30-day Notice |
S126 | 2008-12-15 | 30-day Notice |
S125 | 2008-12-11 | 30-day Notice |
S124 | 2008-12-03 | 30-day Notice |
S123 | 2008-11-26 | 30-day Notice |
S122 | 2008-11-20 | 30-day Notice |
S121 | ||
S120 | 2008-11-12 | 30-day Notice |
S119 | 2008-10-27 | Real-time Process |
S118 | 2008-10-17 | Real-time Process |
S117 | 2008-09-19 | 30-day Notice |
S116 | 2008-09-19 | 30-day Notice |
S115 | 2008-09-17 | 30-day Notice |
S114 | 2008-09-08 | 135 Review Track For 30-day Notice |
S113 | ||
S112 | 2008-08-18 | 30-day Notice |
S111 | 2008-08-12 | 30-day Notice |
S110 | 2008-08-11 | 30-day Notice |
S109 | 2008-08-11 | 135 Review Track For 30-day Notice |
S108 | 2008-08-04 | 135 Review Track For 30-day Notice |
S107 | 2008-07-28 | Normal 180 Day Track |
S106 | 2008-07-25 | 135 Review Track For 30-day Notice |
S105 | 2008-07-23 | 30-day Notice |
S104 | 2008-07-16 | 30-day Notice |
S103 | 2008-06-27 | 135 Review Track For 30-day Notice |
S102 | 2008-06-20 | 135 Review Track For 30-day Notice |
S101 | 2008-06-20 | 30-day Notice |
S100 | 2008-06-18 | 30-day Notice |
S099 | 2008-06-17 | Real-time Process |
S098 | 2008-06-02 | Normal 180 Day Track No User Fee |
S097 | 2008-06-02 | Normal 180 Day Track |
S096 | 2008-05-28 | 30-day Notice |
S095 | 2008-05-27 | 135 Review Track For 30-day Notice |
S094 | 2008-05-23 | 30-day Notice |
S093 | 2008-05-21 | 30-day Notice |
S092 | 2008-04-14 | 30-day Notice |
S091 | 2008-03-21 | 30-day Notice |
S090 | 2008-03-21 | 30-day Notice |
S089 | 2008-03-06 | 30-day Notice |
S088 | 2008-03-04 | 135 Review Track For 30-day Notice |
S087 | 2008-02-26 | 30-day Notice |
S086 | 2008-01-25 | 30-day Notice |
S085 | 2007-12-26 | 135 Review Track For 30-day Notice |
S084 | 2007-12-17 | 30-day Notice |
S083 | 2007-11-19 | 30-day Notice |
S082 | 2007-11-19 | 30-day Notice |
S081 | 2007-11-16 | Real-time Process |
S080 | 2007-10-11 | 30-day Notice |
S079 | 2007-09-28 | Normal 180 Day Track |
S078 | 2007-10-09 | 30-day Notice |
S077 | 2007-09-17 | 135 Review Track For 30-day Notice |
S076 | 2007-08-23 | Special (immediate Track) |
S075 | 2007-07-26 | Real-time Process |
S074 | 2007-06-11 | Real-time Process |
S073 | 2007-05-10 | Real-time Process |
S072 | 2007-03-09 | Real-time Process |
S071 | 2006-12-20 | Real-time Process |
S070 | 2006-12-14 | 30-day Notice |
S069 | 2006-12-01 | Normal 180 Day Track No User Fee |
S068 | 2006-11-28 | Real-time Process |
S067 | 2006-11-28 | 30-day Notice |
S066 | 2006-10-30 | Real-time Process |
S065 | 2006-10-30 | Normal 180 Day Track No User Fee |
S064 | 2006-10-17 | 30-day Notice |
S063 | 2006-10-13 | Real-time Process |
S062 | 2006-10-03 | Special (immediate Track) |
S061 | 2006-08-21 | Normal 180 Day Track No User Fee |
S060 | 2006-08-03 | 135 Review Track For 30-day Notice |
S059 | 2006-07-21 | Real-time Process |
S058 | 2006-07-13 | Real-time Process |
S057 | 2006-05-10 | 135 Review Track For 30-day Notice |
S056 | 2006-03-24 | 30-day Notice |
S055 | 2006-02-21 | Real-time Process |
S054 | 2006-02-14 | Real-time Process |
S053 | 2006-01-09 | Real-time Process |
S052 | 2005-12-09 | Normal 180 Day Track |
S051 | 2005-12-08 | Real-time Process |
S050 | 2005-10-26 | 135 Review Track For 30-day Notice |
S049 | 2005-10-06 | 135 Review Track For 30-day Notice |
S048 | ||
S047 | 2005-09-16 | Real-time Process |
S046 | 2005-08-12 | Real-time Process |
S045 | 2005-07-26 | 135 Review Track For 30-day Notice |
S044 | 2005-07-11 | Real-time Process |
S043 | 2005-07-01 | Normal 180 Day Track |
S042 | ||
S041 | 2005-01-27 | Normal 180 Day Track No User Fee |
S040 | 2004-11-19 | 30-day Notice |
S039 | 2004-08-27 | 30-day Notice |
S038 | 2004-04-27 | Normal 180 Day Track |
S037 | 2004-04-16 | Normal 180 Day Track No User Fee |
S036 | 2004-03-02 | Real-time Process |
S035 | 2004-02-12 | Real-time Process |
S034 | 2004-02-11 | Normal 180 Day Track No User Fee |
S033 | 2004-01-22 | Real-time Process |
S032 | 2003-08-29 | Normal 180 Day Track |
S031 | 2003-08-22 | Normal 180 Day Track No User Fee |
S030 | 2003-06-05 | Normal 180 Day Track |
S029 | 2003-05-12 | Real-time Process |
S028 | 2003-05-01 | Normal 180 Day Track No User Fee |
S027 | 2003-03-31 | Normal 180 Day Track |
S026 | 2003-01-27 | Real-time Process |
S025 | 2002-12-03 | Normal 180 Day Track |
S024 | 2002-04-08 | 30-day Notice |
S023 | 2002-03-12 | Special (immediate Track) |
S022 | 2002-02-27 | Normal 180 Day Track |
S021 | 2002-03-01 | Normal 180 Day Track |
S020 | 2002-02-14 | Normal 180 Day Track |
S019 | 2002-01-24 | Normal 180 Day Track |
S018 | 2002-01-17 | 30-day Notice |
S017 | 2001-11-30 | 30-day Notice |
S016 | 2001-11-05 | Special (immediate Track) |
S015 | 2001-10-05 | Normal 180 Day Track |
S014 | 2001-10-24 | Real-time Process |
S013 | 2001-09-17 | Panel Track |
S012 | 2001-09-24 | 30-day Notice |
S011 | 2001-07-16 | Normal 180 Day Track |
S010 | 2001-04-13 | Special (immediate Track) |
S009 | 2001-02-08 | Real-time Process |
S008 | 2000-09-14 | Real-time Process |
S007 | 2000-04-10 | Real-time Process |
S006 | 1999-12-06 | Special (immediate Track) |
S005 | 1999-11-30 | Real-time Process |
S004 | 1999-11-11 | Real-time Process |
S003 | 1999-05-19 | Real-time Process |
S002 | 1999-03-10 | Normal 180 Day Track |
S001 | 1999-03-10 | Real-time Process |