This medical device record is a pma supplement. A supplement may have changed the device description/function or indication from that approved in the original pma. Be sure to look at the original pma record for more information.
Approval for enpulse implantable pulse generator and model 9991 application software. The device, as modified, will be marketed under the trade name enpulse ipg and is indicated as follows: enpulse pacemakers are indicated for use in patients who are experiencing accepted conditions warranting chronic cardiac pacing which include: 1) symptomatic paroxysmal or permanent second or third-degree av block. 2) symptomatic bilateral bundle branch block. 3) symptomatic paroxysmal or transient sinus node dysfunctions with or without associated av conduction disorders. 4) bradycardia-tachycardia syndrome. 5) vasovagal syndromes or hypersensitive carotid sinus syndromes. Enpulse pacemakers are also indicated for use in patients who may benefit from rate responsive pacing to support cardiac output during varying levels of activity. Using rate response modes may restore heart rate variability by improving cardiac output. These devices are also indicated for use in patients who may benefit from maintenance of av synchrony through the use of dual chamber modes and atrial tracking modes. Dual chamber modes are specifically indicated for treatment of conduction disorders that require restoration of both rate and av synchrony. Dual chamber modes are indicated for use in patients who have experienced one or both of the following conditions: 1) various degrees of av block 2) vvi intolerance (for example, pacemaker syndrome) in the presence of persistent sinus rhythm. This device is also indicated for vdd pacing in patients who have adequate rates and one or both of the following conditions: 1) a requirement for ventricular pacing when adequate atrial rates and adequate intracavitary atrial complexes are present. This includes the presence of complete av block when atrial contribution is needed for hemodynamic benefit or when pacemaker syndrome had existed or is anticipated. 2) a requirement for intermittent ventricular pacing despite a normal sinus rhythm and normal...
Device | ENPULSE INPLANTABLE PULSE GENERATOR |
Classification Name | Implantable Pacemaker Pulse-generator |
Generic Name | Implantable Pacemaker Pulse-generator |
Applicant | MEDTRONIC Inc. |
Date Received | 2003-06-05 |
Decision Date | 2003-12-18 |
PMA | P980035 |
Supplement | S030 |
Product Code | DXY |
Advisory Committee | Cardiovascular |
Supplement Type | Normal 180 Day Track |
Supplement Reason | Change Design/components/specifications/material |
Expedited Review | No |
Combination Product | No |
Applicant Address | MEDTRONIC Inc. 8200 Coral Sea Street Ne ms Mv S11 mounds View, MN 55112 |
Supplement Number | Date | Supplement Type |
---|---|---|
P980035 | Original Filing | |
S739 | 2023-01-23 | 30-day Notice |
S738 | 2023-01-09 | 30-day Notice |
S737 | 2023-01-09 | 30-day Notice |
S736 | 2022-12-15 | 30-day Notice |
S735 | 2022-11-16 | 30-day Notice |
S734 | 2022-11-16 | 30-day Notice |
S733 | 2022-11-14 | 30-day Notice |
S732 | 2022-10-24 | 30-day Notice |
S731 | 2022-10-19 | 30-day Notice |
S730 | 2022-09-13 | 30-day Notice |
S729 | ||
S728 | 2022-09-13 | 30-day Notice |
S727 | 2022-08-22 | 30-day Notice |
S726 | 2022-08-19 | 30-day Notice |
S725 | 2022-08-02 | 30-day Notice |
S724 | 2022-07-21 | 30-day Notice |
S723 | ||
S722 | 2022-07-13 | 30-day Notice |
S721 | ||
S720 | 2022-06-03 | 30-day Notice |
S719 | 2022-05-26 | 30-day Notice |
S718 | 2022-05-20 | 30-day Notice |
S717 | 2022-05-11 | 30-day Notice |
S716 | ||
S715 | 2022-05-05 | 30-day Notice |
S714 | 2022-04-27 | 30-day Notice |
S713 | 2022-04-22 | 30-day Notice |
S712 | 2022-04-14 | 30-day Notice |
S711 | 2022-03-21 | 30-day Notice |
S710 | 2022-03-18 | 30-day Notice |
S709 | 2022-03-17 | 30-day Notice |
S708 | 2022-03-10 | 30-day Notice |
S707 | 2022-03-02 | 30-day Notice |
S706 | ||
S705 | 2022-02-24 | 30-day Notice |
S704 | 2022-02-23 | 30-day Notice |
S703 | 2022-02-10 | 30-day Notice |
S702 | 2022-01-18 | 30-day Notice |
S701 | 2022-01-13 | 30-day Notice |
S700 | 2022-01-10 | 30-day Notice |
S699 | 2021-12-17 | 30-day Notice |
S698 | 2021-12-02 | 30-day Notice |
S697 | 2021-11-30 | 30-day Notice |
S696 | 2021-11-18 | 30-day Notice |
S695 | 2021-11-17 | 30-day Notice |
S694 | ||
S693 | 2021-10-18 | 30-day Notice |
S692 | 2021-09-22 | 30-day Notice |
S691 | 2021-09-13 | 30-day Notice |
S690 | 2021-08-25 | 30-day Notice |
S689 | 2021-08-09 | 30-day Notice |
S688 | 2021-08-06 | 30-day Notice |
S687 | 2021-07-09 | 30-day Notice |
S686 | 2021-07-02 | 30-day Notice |
S685 | 2021-05-27 | 30-day Notice |
S684 | ||
S683 | ||
S682 | 2021-05-14 | 30-day Notice |
S681 | 2021-04-20 | 30-day Notice |
S680 | 2021-03-19 | 30-day Notice |
S679 | ||
S678 | 2021-03-08 | 30-day Notice |
S677 | ||
S676 | ||
S675 | 2021-02-25 | 30-day Notice |
S674 | ||
S673 | 2021-02-11 | 30-day Notice |
S672 | ||
S671 | ||
S670 | 2020-12-11 | Real-time Process |
S669 | 2020-12-08 | 30-day Notice |
S668 | 2020-12-07 | 30-day Notice |
S667 | ||
S666 | 2020-11-24 | 30-day Notice |
S665 | ||
S664 | ||
S663 | ||
S662 | 2020-11-17 | 30-day Notice |
S661 | 2020-11-13 | 30-day Notice |
S660 | 2020-11-03 | 30-day Notice |
S659 | ||
S658 | ||
S657 | 2020-10-20 | 30-day Notice |
S656 | 2020-10-19 | 30-day Notice |
S655 | ||
S654 | 2020-10-15 | 30-day Notice |
S653 | ||
S652 | 2020-10-02 | 30-day Notice |
S651 | ||
S650 | ||
S649 | ||
S648 | ||
S647 | 2020-09-14 | 30-day Notice |
S646 | ||
S645 | ||
S644 | 2020-09-14 | 30-day Notice |
S643 | 2020-09-11 | 30-day Notice |
S642 | 2020-09-04 | 30-day Notice |
S641 | 2020-09-04 | 30-day Notice |
S640 | 2020-09-03 | 30-day Notice |
S639 | 2020-08-28 | 30-day Notice |
S638 | ||
S637 | ||
S636 | 2020-07-27 | 30-day Notice |
S635 | 2020-07-14 | 30-day Notice |
S634 | 2020-07-09 | 30-day Notice |
S633 | 2020-07-06 | 30-day Notice |
S632 | 2020-07-02 | 30-day Notice |
S631 | 2020-06-26 | 30-day Notice |
S630 | 2020-06-16 | 30-day Notice |
S629 | ||
S628 | ||
S627 | 2020-05-15 | 30-day Notice |
S626 | 2020-04-27 | 30-day Notice |
S625 | 2020-04-08 | 30-day Notice |
S624 | 2020-03-25 | 30-day Notice |
S623 | 2020-03-16 | 30-day Notice |
S622 | 2020-03-16 | 30-day Notice |
S621 | 2020-03-12 | 30-day Notice |
S620 | 2020-03-02 | 30-day Notice |
S619 | ||
S618 | ||
S617 | 2020-02-24 | 30-day Notice |
S616 | ||
S615 | 2020-02-20 | 30-day Notice |
S614 | 2019-12-23 | Real-time Process |
S613 | 2019-12-20 | 30-day Notice |
S612 | 2019-12-11 | 30-day Notice |
S611 | 2019-12-10 | 30-day Notice |
S610 | 2019-11-25 | 30-day Notice |
S609 | 2019-11-18 | 30-day Notice |
S608 | ||
S607 | 2019-11-06 | 30-day Notice |
S606 | 2019-10-08 | 30-day Notice |
S605 | 2019-09-16 | 30-day Notice |
S604 | 2019-08-01 | 30-day Notice |
S603 | 2019-07-29 | 30-day Notice |
S602 | 2019-07-12 | 30-day Notice |
S601 | ||
S600 | 2019-07-01 | 30-day Notice |
S599 | 2019-06-20 | 30-day Notice |
S598 | 2019-06-11 | 30-day Notice |
S597 | 2019-06-10 | 30-day Notice |
S596 | 2019-05-30 | 30-day Notice |
S595 | ||
S594 | ||
S593 | 2019-05-06 | 30-day Notice |
S592 | 2019-04-29 | 30-day Notice |
S591 | 2019-04-29 | 30-day Notice |
S590 | 2019-04-23 | 30-day Notice |
S589 | 2019-04-11 | 30-day Notice |
S588 | 2019-04-08 | 30-day Notice |
S587 | ||
S586 | 2019-04-03 | 30-day Notice |
S585 | 2019-03-28 | 30-day Notice |
S584 | ||
S583 | ||
S582 | ||
S581 | ||
S580 | 2019-03-05 | 30-day Notice |
S579 | 2019-03-04 | 30-day Notice |
S578 | 2019-02-26 | 30-day Notice |
S577 | 2019-02-25 | 30-day Notice |
S576 | 2019-02-05 | Real-time Process |
S575 | 2019-01-23 | 30-day Notice |
S574 | 2018-12-10 | 30-day Notice |
S573 | 2018-11-16 | 30-day Notice |
S572 | 2018-11-08 | 30-day Notice |
S571 | 2018-11-05 | 30-day Notice |
S570 | 2018-11-01 | 30-day Notice |
S569 | 2018-10-26 | 30-day Notice |
S568 | 2018-10-23 | 30-day Notice |
S567 | 2018-10-18 | 30-day Notice |
S566 | 2018-10-15 | 30-day Notice |
S565 | 2018-10-09 | 30-day Notice |
S564 | 2018-09-26 | 30-day Notice |
S563 | 2018-09-13 | 30-day Notice |
S562 | 2018-08-29 | 30-day Notice |
S561 | 2018-08-22 | Real-time Process |
S560 | 2018-08-08 | 30-day Notice |
S559 | 2018-08-06 | 30-day Notice |
S558 | 2018-06-28 | Normal 180 Day Track No User Fee |
S557 | 2018-05-17 | 30-day Notice |
S556 | 2018-05-15 | 30-day Notice |
S555 | 2018-05-14 | 30-day Notice |
S554 | 2018-05-11 | 30-day Notice |
S553 | 2018-05-08 | 30-day Notice |
S552 | 2018-04-25 | 30-day Notice |
S551 | 2018-04-23 | 30-day Notice |
S550 | 2018-04-17 | Real-time Process |
S549 | 2018-04-13 | Normal 180 Day Track |
S548 | 2018-04-12 | 30-day Notice |
S547 | 2018-04-12 | 30-day Notice |
S546 | 2018-04-09 | 30-day Notice |
S545 | 2018-04-06 | 30-day Notice |
S544 | 2018-03-30 | 30-day Notice |
S543 | 2018-03-22 | 30-day Notice |
S542 | 2018-03-22 | 30-day Notice |
S541 | 2018-03-14 | 30-day Notice |
S540 | 2018-03-12 | 30-day Notice |
S539 | 2018-03-12 | 30-day Notice |
S538 | 2018-03-09 | 30-day Notice |
S537 | 2018-03-05 | 30-day Notice |
S536 | 2018-02-12 | Normal 180 Day Track |
S535 | 2018-02-08 | 30-day Notice |
S534 | 2018-02-01 | Real-time Process |
S533 | 2018-02-01 | 30-day Notice |
S532 | 2018-01-29 | Real-time Process |
S531 | 2018-01-24 | 30-day Notice |
S530 | ||
S529 | 2017-11-29 | 30-day Notice |
S528 | 2017-11-20 | 30-day Notice |
S527 | 2017-11-13 | 30-day Notice |
S526 | 2017-11-13 | 30-day Notice |
S525 | 2017-11-07 | 30-day Notice |
S524 | 2017-11-01 | 30-day Notice |
S523 | 2017-10-16 | 30-day Notice |
S522 | 2017-10-06 | 30-day Notice |
S521 | 2017-09-28 | 30-day Notice |
S520 | 2017-09-19 | 30-day Notice |
S519 | 2017-09-05 | Real-time Process |
S518 | 2017-08-31 | Normal 180 Day Track |
S517 | 2017-08-04 | 30-day Notice |
S516 | 2017-07-20 | 30-day Notice |
S515 | 2017-07-20 | 30-day Notice |
S514 | 2017-07-19 | 30-day Notice |
S513 | 2017-07-14 | Real-time Process |
S512 | 2017-06-27 | 30-day Notice |
S511 | 2017-06-23 | 30-day Notice |
S510 | 2017-06-16 | 30-day Notice |
S509 | 2017-06-08 | 30-day Notice |
S508 | 2017-06-07 | 30-day Notice |
S507 | 2017-05-18 | 30-day Notice |
S506 | 2017-05-18 | Normal 180 Day Track |
S505 | 2017-05-15 | 30-day Notice |
S504 | 2017-05-12 | 30-day Notice |
S503 | 2017-05-12 | 30-day Notice |
S502 | 2017-05-12 | 30-day Notice |
S501 | 2017-05-10 | 30-day Notice |
S500 | 2017-05-10 | 30-day Notice |
S499 | 2017-05-10 | 30-day Notice |
S498 | 2017-05-05 | 30-day Notice |
S497 | ||
S496 | 2017-04-04 | 30-day Notice |
S495 | 2017-04-03 | Normal 180 Day Track |
S494 | 2017-03-31 | 30-day Notice |
S493 | 2017-03-29 | 30-day Notice |
S492 | 2017-03-13 | 30-day Notice |
S491 | 2017-03-08 | 30-day Notice |
S490 | 2017-02-09 | 30-day Notice |
S489 | 2017-02-03 | 30-day Notice |
S488 | 2017-02-03 | 30-day Notice |
S487 | 2017-01-13 | 30-day Notice |
S486 | 2016-12-06 | Normal 180 Day Track |
S485 | 2016-11-23 | Real-time Process |
S484 | 2016-11-22 | 30-day Notice |
S483 | 2016-11-16 | Normal 180 Day Track |
S482 | 2016-11-14 | 30-day Notice |
S481 | 2016-11-02 | Normal 180 Day Track |
S480 | 2016-10-31 | 30-day Notice |
S479 | 2016-10-17 | 30-day Notice |
S478 | 2016-09-30 | Real-time Process |
S477 | 2016-09-28 | 30-day Notice |
S476 | 2016-09-26 | 30-day Notice |
S475 | 2016-09-12 | Normal 180 Day Track |
S474 | 2016-09-08 | Real-time Process |
S473 | 2016-08-17 | 30-day Notice |
S472 | 2016-07-22 | 30-day Notice |
S471 | 2016-07-13 | Real-time Process |
S470 | 2016-06-29 | Normal 180 Day Track |
S469 | 2016-06-24 | Real-time Process |
S468 | 2016-06-24 | 30-day Notice |
S467 | 2016-06-22 | 30-day Notice |
S466 | 2016-06-13 | 30-day Notice |
S465 | 2016-06-09 | 30-day Notice |
S464 | 2016-03-11 | Normal 180 Day Track |
S463 | 2016-04-25 | 30-day Notice |
S462 | 2016-04-11 | 30-day Notice |
S461 | 2016-03-31 | 30-day Notice |
S460 | 2016-03-18 | Real-time Process |
S459 | 2016-03-17 | 30-day Notice |
S458 | 2016-02-29 | 30-day Notice |
S457 | 2016-02-25 | 30-day Notice |
S456 | 2016-02-25 | 30-day Notice |
S455 | 2016-02-05 | 30-day Notice |
S454 | 2016-02-02 | 30-day Notice |
S453 | 2016-01-19 | 30-day Notice |
S452 | 2016-01-12 | Real-time Process |
S451 | 2015-12-28 | 30-day Notice |
S450 | 2015-12-18 | Real-time Process |
S449 | 2015-12-16 | 30-day Notice |
S448 | 2015-12-04 | 30-day Notice |
S447 | 2015-12-01 | Normal 180 Day Track |
S446 | 2015-10-22 | Real-time Process |
S445 | 2015-10-22 | Real-time Process |
S444 | 2015-10-19 | 30-day Notice |
S443 | 2015-10-16 | Real-time Process |
S442 | 2015-10-13 | Normal 180 Day Track |
S441 | 2015-09-30 | 30-day Notice |
S440 | 2015-09-30 | 30-day Notice |
S439 | ||
S438 | 2015-08-31 | 30-day Notice |
S437 | 2015-08-28 | Real-time Process |
S436 | 2015-08-12 | 30-day Notice |
S435 | 2015-08-11 | 30-day Notice |
S434 | 2015-08-05 | 30-day Notice |
S433 | 2015-07-20 | 30-day Notice |
S432 | 2015-07-09 | 30-day Notice |
S431 | 2015-07-02 | Real-time Process |
S430 | 2015-07-01 | 30-day Notice |
S429 | 2015-07-01 | 30-day Notice |
S428 | 2015-06-19 | 30-day Notice |
S427 | 2015-06-03 | 30-day Notice |
S426 | 2015-06-01 | 30-day Notice |
S425 | 2015-05-22 | 30-day Notice |
S424 | 2015-04-20 | Normal 180 Day Track |
S423 | 2015-04-17 | 30-day Notice |
S422 | 2015-04-16 | 30-day Notice |
S421 | 2015-04-14 | Real-time Process |
S420 | 2015-03-26 | Real-time Process |
S419 | 2015-03-24 | 30-day Notice |
S418 | 2015-03-24 | 30-day Notice |
S417 | 2015-03-23 | 30-day Notice |
S416 | 2015-03-23 | 30-day Notice |
S415 | 2015-03-06 | Real-time Process |
S414 | 2015-02-06 | 30-day Notice |
S413 | 2015-02-05 | 30-day Notice |
S412 | 2015-02-05 | 30-day Notice |
S411 | 2015-02-04 | 30-day Notice |
S410 | 2015-02-02 | 30-day Notice |
S409 | 2015-02-02 | 30-day Notice |
S408 | 2015-01-29 | 30-day Notice |
S407 | 2015-01-23 | 30-day Notice |
S406 | 2015-01-22 | 30-day Notice |
S405 | 2015-01-20 | 30-day Notice |
S404 | 2014-12-22 | Normal 180 Day Track |
S403 | 2014-12-05 | 30-day Notice |
S402 | 2014-12-04 | 30-day Notice |
S401 | 2014-11-19 | 30-day Notice |
S400 | ||
S399 | ||
S398 | 2014-10-14 | 30-day Notice |
S397 | 2014-10-07 | 30-day Notice |
S396 | 2014-10-02 | 30-day Notice |
S395 | 2014-09-19 | 30-day Notice |
S394 | 2014-09-09 | 30-day Notice |
S393 | 2014-08-27 | 30-day Notice |
S392 | 2014-08-27 | Real-time Process |
S391 | 2014-08-19 | Real-time Process |
S390 | 2014-08-18 | 30-day Notice |
S389 | 2014-08-06 | 30-day Notice |
S388 | 2014-08-01 | 30-day Notice |
S387 | 2014-07-25 | 30-day Notice |
S386 | 2014-07-24 | 30-day Notice |
S385 | 2014-07-23 | 30-day Notice |
S384 | 2014-07-18 | Normal 180 Day Track |
S383 | 2014-07-07 | 30-day Notice |
S382 | 2014-07-02 | Real-time Process |
S381 | 2014-06-19 | 30-day Notice |
S380 | 2014-06-13 | 30-day Notice |
S379 | 2014-06-06 | 30-day Notice |
S378 | 2014-05-23 | 30-day Notice |
S377 | 2014-05-08 | 30-day Notice |
S376 | 2014-05-01 | 30-day Notice |
S375 | 2014-04-25 | 30-day Notice |
S374 | 2014-04-23 | Normal 180 Day Track |
S373 | 2014-03-28 | Real-time Process |
S372 | 2014-03-28 | Real-time Process |
S371 | 2014-03-20 | 30-day Notice |
S370 | 2014-03-20 | 30-day Notice |
S369 | 2014-03-18 | Real-time Process |
S368 | 2014-03-07 | 30-day Notice |
S367 | 2014-02-27 | 30-day Notice |
S366 | 2014-01-30 | 30-day Notice |
S365 | 2014-01-29 | 30-day Notice |
S364 | 2014-01-27 | 30-day Notice |
S363 | 2014-01-22 | 30-day Notice |
S362 | 2013-12-24 | 30-day Notice |
S361 | 2013-12-23 | 30-day Notice |
S360 | 2013-12-19 | Real-time Process |
S359 | 2013-12-19 | 30-day Notice |
S358 | 2013-12-18 | Normal 180 Day Track |
S357 | ||
S356 | 2013-12-12 | 30-day Notice |
S355 | 2013-11-19 | 30-day Notice |
S354 | 2013-10-24 | 30-day Notice |
S353 | 2013-10-24 | 30-day Notice |
S352 | 2013-10-23 | 30-day Notice |
S351 | 2013-10-21 | 30-day Notice |
S350 | 2013-10-17 | 30-day Notice |
S349 | 2013-10-17 | 30-day Notice |
S348 | 2013-09-26 | 30-day Notice |
S347 | 2013-09-24 | 30-day Notice |
S346 | 2013-09-17 | 30-day Notice |
S345 | 2013-09-11 | 30-day Notice |
S344 | 2013-09-03 | 30-day Notice |
S343 | 2013-08-23 | Normal 180 Day Track |
S342 | 2013-08-21 | 30-day Notice |
S341 | 2013-08-12 | Real-time Process |
S340 | 2013-07-26 | 30-day Notice |
S339 | 2013-07-17 | 30-day Notice |
S338 | 2013-07-08 | Normal 180 Day Track |
S337 | 2013-07-02 | 30-day Notice |
S336 | 2013-06-24 | 30-day Notice |
S335 | ||
S334 | 2013-06-11 | Normal 180 Day Track |
S333 | 2013-06-07 | 30-day Notice |
S332 | 2013-06-07 | 30-day Notice |
S331 | 2013-05-30 | 30-day Notice |
S330 | 2013-05-29 | 30-day Notice |
S329 | 2013-05-21 | 30-day Notice |
S328 | 2013-05-17 | 30-day Notice |
S327 | 2013-05-17 | Real-time Process |
S326 | 2013-05-16 | Real-time Process |
S325 | 2013-05-13 | Real-time Process |
S324 | 2013-05-10 | 30-day Notice |
S323 | 2013-04-25 | 30-day Notice |
S322 | 2013-04-23 | 30-day Notice |
S321 | 2013-04-18 | Real-time Process |
S320 | 2013-04-17 | Real-time Process |
S319 | 2013-04-10 | Normal 180 Day Track No User Fee |
S318 | 2013-04-09 | 30-day Notice |
S317 | 2013-03-27 | Real-time Process |
S316 | 2013-03-27 | 30-day Notice |
S315 | 2013-03-13 | 30-day Notice |
S314 | 2013-03-11 | 30-day Notice |
S313 | 2013-03-05 | 30-day Notice |
S312 | 2013-03-04 | 30-day Notice |
S311 | 2013-02-26 | Normal 180 Day Track |
S310 | 2013-02-21 | 30-day Notice |
S309 | 2013-02-21 | 30-day Notice |
S308 | 2013-02-07 | 30-day Notice |
S307 | ||
S306 | 2013-01-29 | 30-day Notice |
S305 | 2013-01-25 | 30-day Notice |
S304 | 2013-01-22 | 30-day Notice |
S303 | 2013-01-14 | 30-day Notice |
S302 | ||
S301 | 2012-11-21 | 30-day Notice |
S300 | 2012-11-15 | 30-day Notice |
S299 | 2012-11-05 | 30-day Notice |
S298 | 2012-11-01 | Real-time Process |
S297 | 2012-10-19 | 30-day Notice |
S296 | 2012-10-19 | Real-time Process |
S295 | 2012-10-05 | 30-day Notice |
S294 | 2012-09-26 | 30-day Notice |
S293 | 2012-09-21 | 30-day Notice |
S292 | 2012-09-10 | 30-day Notice |
S291 | 2012-09-07 | 30-day Notice |
S290 | 2012-08-24 | Real-time Process |
S289 | 2012-08-21 | 30-day Notice |
S288 | 2012-08-21 | 30-day Notice |
S287 | 2012-08-13 | 30-day Notice |
S286 | 2012-08-08 | 30-day Notice |
S285 | 2012-08-03 | 30-day Notice |
S284 | 2012-07-31 | 30-day Notice |
S283 | 2012-07-25 | 30-day Notice |
S282 | 2012-07-25 | 30-day Notice |
S281 | 2012-07-23 | 30-day Notice |
S280 | 2012-07-17 | Normal 180 Day Track |
S279 | 2012-07-13 | 30-day Notice |
S278 | 2012-07-11 | 30-day Notice |
S277 | 2012-06-29 | Normal 180 Day Track |
S276 | 2012-06-29 | 30-day Notice |
S275 | 2012-06-29 | Real-time Process |
S274 | 2012-06-12 | 30-day Notice |
S273 | 2012-06-08 | 30-day Notice |
S272 | 2012-08-21 | Normal 180 Day Track |
S271 | 2012-05-17 | 30-day Notice |
S270 | 2012-08-21 | Normal 180 Day Track |
S269 | ||
S268 | 2012-04-04 | Real-time Process |
S267 | 2012-03-27 | 30-day Notice |
S266 | 2012-03-09 | 30-day Notice |
S265 | 2012-03-07 | 30-day Notice |
S264 | 2012-03-07 | Normal 180 Day Track |
S263 | 2012-03-05 | 30-day Notice |
S262 | 2012-02-29 | 30-day Notice |
S261 | 2012-02-27 | Real-time Process |
S260 | 2012-02-13 | 30-day Notice |
S259 | ||
S258 | 2012-02-07 | 30-day Notice |
S257 | 2012-02-03 | 30-day Notice |
S256 | ||
S255 | 2011-12-20 | 30-day Notice |
S254 | 2011-11-23 | 30-day Notice |
S253 | 2011-11-21 | Normal 180 Day Track |
S252 | 2011-11-17 | 135 Review Track For 30-day Notice |
S251 | ||
S250 | 2011-11-14 | 30-day Notice |
S249 | 2011-11-10 | Real-time Process |
S248 | 2011-10-26 | 30-day Notice |
S247 | 2011-10-25 | 30-day Notice |
S246 | 2011-10-06 | 30-day Notice |
S245 | 2011-10-05 | Real-time Process |
S244 | 2011-09-27 | Real-time Process |
S243 | 2011-09-22 | 30-day Notice |
S242 | 2011-09-19 | Real-time Process |
S241 | 2011-09-16 | 30-day Notice |
S240 | 2011-08-24 | 30-day Notice |
S239 | 2011-07-20 | 30-day Notice |
S238 | 2011-07-18 | 30-day Notice |
S237 | 2011-07-18 | 30-day Notice |
S236 | 2011-07-08 | 30-day Notice |
S235 | 2011-07-06 | 30-day Notice |
S234 | 2011-06-30 | 30-day Notice |
S233 | 2011-06-29 | 30-day Notice |
S232 | 2011-06-28 | 30-day Notice |
S231 | 2011-06-08 | 30-day Notice |
S230 | 2011-06-07 | 30-day Notice |
S229 | 2011-05-27 | 30-day Notice |
S228 | ||
S227 | 2011-05-17 | Real-time Process |
S226 | 2011-05-13 | 30-day Notice |
S225 | 2011-05-10 | 30-day Notice |
S224 | 2011-05-09 | 30-day Notice |
S223 | 2011-05-05 | Normal 180 Day Track No User Fee |
S222 | 2011-04-29 | 30-day Notice |
S221 | 2011-04-26 | 30-day Notice |
S220 | 2011-04-25 | 30-day Notice |
S219 | 2011-04-25 | Real-time Process |
S218 | 2011-04-21 | 30-day Notice |
S217 | 2011-04-19 | 30-day Notice |
S216 | 2011-04-15 | 30-day Notice |
S215 | 2011-04-11 | 30-day Notice |
S214 | 2011-04-05 | 30-day Notice |
S213 | 2011-04-04 | 30-day Notice |
S212 | ||
S211 | 2011-03-22 | 135 Review Track For 30-day Notice |
S210 | ||
S209 | 2011-03-09 | 135 Review Track For 30-day Notice |
S208 | 2011-03-08 | 30-day Notice |
S207 | 2011-03-02 | 30-day Notice |
S206 | 2011-02-18 | 30-day Notice |
S205 | 2011-02-16 | 30-day Notice |
S204 | 2011-02-16 | 30-day Notice |
S203 | 2011-02-03 | 30-day Notice |
S202 | 2011-02-01 | 30-day Notice |
S201 | 2011-01-25 | 30-day Notice |
S200 | 2011-01-04 | Normal 180 Day Track |
S199 | 2010-12-09 | 30-day Notice |
S198 | 2010-12-08 | 30-day Notice |
S197 | 2010-12-07 | Real-time Process |
S196 | 2010-11-17 | 30-day Notice |
S195 | 2010-11-15 | 30-day Notice |
S194 | 2010-11-12 | 30-day Notice |
S193 | 2010-11-12 | 30-day Notice |
S192 | 2010-11-09 | 30-day Notice |
S191 | 2010-10-26 | 30-day Notice |
S190 | 2010-10-15 | 30-day Notice |
S189 | 2010-10-12 | 30-day Notice |
S188 | 2010-09-16 | 30-day Notice |
S187 | 2010-08-13 | 30-day Notice |
S186 | 2010-08-10 | 30-day Notice |
S185 | 2010-07-29 | 30-day Notice |
S184 | 2010-07-28 | 30-day Notice |
S183 | 2010-07-26 | 30-day Notice |
S182 | 2010-07-20 | Real-time Process |
S181 | 2010-07-16 | 30-day Notice |
S180 | 2010-07-15 | 30-day Notice |
S179 | 2010-07-15 | 30-day Notice |
S178 | 2010-06-30 | 30-day Notice |
S177 | 2010-06-28 | 135 Review Track For 30-day Notice |
S176 | 2010-06-28 | 30-day Notice |
S175 | 2010-06-25 | 30-day Notice |
S174 | 2010-06-18 | 30-day Notice |
S173 | 2010-06-15 | Real-time Process |
S172 | 2010-06-10 | 30-day Notice |
S171 | 2010-06-02 | 30-day Notice |
S170 | 2010-05-27 | 30-day Notice |
S169 | 2010-05-20 | Real-time Process |
S168 | 2010-05-17 | Normal 180 Day Track |
S167 | 2010-05-03 | 30-day Notice |
S166 | 2010-04-22 | Normal 180 Day Track |
S165 | 2010-04-12 | 30-day Notice |
S164 | 2010-03-31 | 30-day Notice |
S163 | 2010-03-29 | 30-day Notice |
S162 | 2010-04-29 | Real-time Process |
S161 | 2010-03-01 | Real-time Process |
S160 | 2010-02-19 | 135 Review Track For 30-day Notice |
S159 | 2010-02-18 | 30-day Notice |
S158 | 2010-02-18 | 30-day Notice |
S157 | 2010-01-21 | 30-day Notice |
S156 | 2010-01-13 | 30-day Notice |
S155 | 2009-12-30 | Normal 180 Day Track No User Fee |
S154 | 2009-12-18 | 30-day Notice |
S153 | 2009-12-16 | Normal 180 Day Track |
S152 | 2009-12-08 | 30-day Notice |
S151 | 2009-12-07 | 30-day Notice |
S150 | 2009-12-02 | Normal 180 Day Track |
S149 | 2009-11-27 | 30-day Notice |
S148 | 2009-11-23 | 30-day Notice |
S147 | 2009-11-17 | Real-time Process |
S146 | 2009-10-08 | Normal 180 Day Track No User Fee |
S145 | 2009-10-08 | Real-time Process |
S144 | ||
S143 | 2009-09-11 | 30-day Notice |
S142 | 2009-09-08 | 30-day Notice |
S141 | 2009-09-08 | 30-day Notice |
S140 | 2009-07-28 | Real-time Process |
S139 | 2009-06-30 | 30-day Notice |
S138 | 2009-06-17 | Real-time Process |
S137 | 2009-06-11 | 30-day Notice |
S136 | 2009-03-27 | Normal 180 Day Track |
S135 | ||
S134 | 2009-03-06 | Normal 180 Day Track |
S133 | 2009-03-06 | 30-day Notice |
S132 | 2009-03-05 | 30-day Notice |
S131 | 2009-03-02 | Normal 180 Day Track |
S130 | 2009-02-18 | 135 Review Track For 30-day Notice |
S129 | 2009-02-13 | 135 Review Track For 30-day Notice |
S128 | 2009-02-09 | 135 Review Track For 30-day Notice |
S127 | 2009-02-02 | 30-day Notice |
S126 | 2008-12-15 | 30-day Notice |
S125 | 2008-12-11 | 30-day Notice |
S124 | 2008-12-03 | 30-day Notice |
S123 | 2008-11-26 | 30-day Notice |
S122 | 2008-11-20 | 30-day Notice |
S121 | ||
S120 | 2008-11-12 | 30-day Notice |
S119 | 2008-10-27 | Real-time Process |
S118 | 2008-10-17 | Real-time Process |
S117 | 2008-09-19 | 30-day Notice |
S116 | 2008-09-19 | 30-day Notice |
S115 | 2008-09-17 | 30-day Notice |
S114 | 2008-09-08 | 135 Review Track For 30-day Notice |
S113 | ||
S112 | 2008-08-18 | 30-day Notice |
S111 | 2008-08-12 | 30-day Notice |
S110 | 2008-08-11 | 30-day Notice |
S109 | 2008-08-11 | 135 Review Track For 30-day Notice |
S108 | 2008-08-04 | 135 Review Track For 30-day Notice |
S107 | 2008-07-28 | Normal 180 Day Track |
S106 | 2008-07-25 | 135 Review Track For 30-day Notice |
S105 | 2008-07-23 | 30-day Notice |
S104 | 2008-07-16 | 30-day Notice |
S103 | 2008-06-27 | 135 Review Track For 30-day Notice |
S102 | 2008-06-20 | 135 Review Track For 30-day Notice |
S101 | 2008-06-20 | 30-day Notice |
S100 | 2008-06-18 | 30-day Notice |
S099 | 2008-06-17 | Real-time Process |
S098 | 2008-06-02 | Normal 180 Day Track No User Fee |
S097 | 2008-06-02 | Normal 180 Day Track |
S096 | 2008-05-28 | 30-day Notice |
S095 | 2008-05-27 | 135 Review Track For 30-day Notice |
S094 | 2008-05-23 | 30-day Notice |
S093 | 2008-05-21 | 30-day Notice |
S092 | 2008-04-14 | 30-day Notice |
S091 | 2008-03-21 | 30-day Notice |
S090 | 2008-03-21 | 30-day Notice |
S089 | 2008-03-06 | 30-day Notice |
S088 | 2008-03-04 | 135 Review Track For 30-day Notice |
S087 | 2008-02-26 | 30-day Notice |
S086 | 2008-01-25 | 30-day Notice |
S085 | 2007-12-26 | 135 Review Track For 30-day Notice |
S084 | 2007-12-17 | 30-day Notice |
S083 | 2007-11-19 | 30-day Notice |
S082 | 2007-11-19 | 30-day Notice |
S081 | 2007-11-16 | Real-time Process |
S080 | 2007-10-11 | 30-day Notice |
S079 | 2007-09-28 | Normal 180 Day Track |
S078 | 2007-10-09 | 30-day Notice |
S077 | 2007-09-17 | 135 Review Track For 30-day Notice |
S076 | 2007-08-23 | Special (immediate Track) |
S075 | 2007-07-26 | Real-time Process |
S074 | 2007-06-11 | Real-time Process |
S073 | 2007-05-10 | Real-time Process |
S072 | 2007-03-09 | Real-time Process |
S071 | 2006-12-20 | Real-time Process |
S070 | 2006-12-14 | 30-day Notice |
S069 | 2006-12-01 | Normal 180 Day Track No User Fee |
S068 | 2006-11-28 | Real-time Process |
S067 | 2006-11-28 | 30-day Notice |
S066 | 2006-10-30 | Real-time Process |
S065 | 2006-10-30 | Normal 180 Day Track No User Fee |
S064 | 2006-10-17 | 30-day Notice |
S063 | 2006-10-13 | Real-time Process |
S062 | 2006-10-03 | Special (immediate Track) |
S061 | 2006-08-21 | Normal 180 Day Track No User Fee |
S060 | 2006-08-03 | 135 Review Track For 30-day Notice |
S059 | 2006-07-21 | Real-time Process |
S058 | 2006-07-13 | Real-time Process |
S057 | 2006-05-10 | 135 Review Track For 30-day Notice |
S056 | 2006-03-24 | 30-day Notice |
S055 | 2006-02-21 | Real-time Process |
S054 | 2006-02-14 | Real-time Process |
S053 | 2006-01-09 | Real-time Process |
S052 | 2005-12-09 | Normal 180 Day Track |
S051 | 2005-12-08 | Real-time Process |
S050 | 2005-10-26 | 135 Review Track For 30-day Notice |
S049 | 2005-10-06 | 135 Review Track For 30-day Notice |
S048 | ||
S047 | 2005-09-16 | Real-time Process |
S046 | 2005-08-12 | Real-time Process |
S045 | 2005-07-26 | 135 Review Track For 30-day Notice |
S044 | 2005-07-11 | Real-time Process |
S043 | 2005-07-01 | Normal 180 Day Track |
S042 | ||
S041 | 2005-01-27 | Normal 180 Day Track No User Fee |
S040 | 2004-11-19 | 30-day Notice |
S039 | 2004-08-27 | 30-day Notice |
S038 | 2004-04-27 | Normal 180 Day Track |
S037 | 2004-04-16 | Normal 180 Day Track No User Fee |
S036 | 2004-03-02 | Real-time Process |
S035 | 2004-02-12 | Real-time Process |
S034 | 2004-02-11 | Normal 180 Day Track No User Fee |
S033 | 2004-01-22 | Real-time Process |
S032 | 2003-08-29 | Normal 180 Day Track |
S031 | 2003-08-22 | Normal 180 Day Track No User Fee |
S030 | 2003-06-05 | Normal 180 Day Track |
S029 | 2003-05-12 | Real-time Process |
S028 | 2003-05-01 | Normal 180 Day Track No User Fee |
S027 | 2003-03-31 | Normal 180 Day Track |
S026 | 2003-01-27 | Real-time Process |
S025 | 2002-12-03 | Normal 180 Day Track |
S024 | 2002-04-08 | 30-day Notice |
S023 | 2002-03-12 | Special (immediate Track) |
S022 | 2002-02-27 | Normal 180 Day Track |
S021 | 2002-03-01 | Normal 180 Day Track |
S020 | 2002-02-14 | Normal 180 Day Track |
S019 | 2002-01-24 | Normal 180 Day Track |
S018 | 2002-01-17 | 30-day Notice |
S017 | 2001-11-30 | 30-day Notice |
S016 | 2001-11-05 | Special (immediate Track) |
S015 | 2001-10-05 | Normal 180 Day Track |
S014 | 2001-10-24 | Real-time Process |
S013 | 2001-09-17 | Panel Track |
S012 | 2001-09-24 | 30-day Notice |
S011 | 2001-07-16 | Normal 180 Day Track |
S010 | 2001-04-13 | Special (immediate Track) |
S009 | 2001-02-08 | Real-time Process |
S008 | 2000-09-14 | Real-time Process |
S007 | 2000-04-10 | Real-time Process |
S006 | 1999-12-06 | Special (immediate Track) |
S005 | 1999-11-30 | Real-time Process |
S004 | 1999-11-11 | Real-time Process |
S003 | 1999-05-19 | Real-time Process |
S002 | 1999-03-10 | Normal 180 Day Track |
S001 | 1999-03-10 | Real-time Process |