This medical device record is a pma supplement. A supplement may have changed the device description/function or indication from that approved in the original pma. Be sure to look at the original pma record for more information.
Approval for the medtronic model p1501dr enrhythm implantable pulse generator, medtronic model 9987 application software and medtronic model 2696 incheck patient assistant. The cevice is indicate for the follwoing: 1) rate adaptive pacing in patients who may benefit from increased pacing rates concurrent with increases in activity. 2) accepted patient conditions warranting chronic cardiac pacing which include: symptomatic paroxysmal or permanent second or third-degree av block, symptomatic bilateral bundle branch block, symptomatic paroxysmal or transient sinus node dysfunctions with or without associated av conduction disorders, and bradycardia-tachycardia syndrome to prevent symptomatic bradycardia or some forms of symptomatic tachyarrhythmias. The device is also indicated for dual chamber and atrial tracking modes in patients who may benefit from maintenance of av synchrony. Dual chamber modes are specifically indicated for treatment of cinduction disorders that require restoration of both rate and av synchrony, hich include: various degrees of av block to maintain the atrial contribution to cardiac output and vvi intolerance (e. G. , pacemaker syndrome) in the presence of persistent siuns rhythm. Antitachycardia pacing (atp) is indicated for terminatino of atrial tachyarrhymias in bradycardia patients with one or more of the above pacing indications. Atrial rhythm management features such as atrial rate stabilization (ars), atrial preference pacing (app), and post mode switch overdrive pacing (pmop) are indicated for the suppression of atrial tachyarrhythmias in bradycardia patients with atrial septal lead placement and one or more of the above pacing indications.
Device | MEDTRONIC MODEL P1501DR ENRHYTHM IMPLANTABLE PULSE GENERATOR, MEDTRONIC MODEL 9987 APPLICATION SOFTWARE AND MEDTRONIC MO |
Classification Name | Implantable Pacemaker Pulse-generator |
Generic Name | Implantable Pacemaker Pulse-generator |
Applicant | MEDTRONIC Inc. |
Date Received | 2004-04-27 |
Decision Date | 2005-04-28 |
PMA | P980035 |
Supplement | S038 |
Product Code | DXY |
Advisory Committee | Cardiovascular |
Supplement Type | Normal 180 Day Track |
Supplement Reason | Change Design/components/specifications/material |
Expedited Review | No |
Combination Product | No |
Applicant Address | MEDTRONIC Inc. 8200 Coral Sea Street Ne ms Mv S11 mounds View, MN 55112 |
Supplement Number | Date | Supplement Type |
---|---|---|
P980035 | Original Filing | |
S739 | 2023-01-23 | 30-day Notice |
S738 | 2023-01-09 | 30-day Notice |
S737 | 2023-01-09 | 30-day Notice |
S736 | 2022-12-15 | 30-day Notice |
S735 | 2022-11-16 | 30-day Notice |
S734 | 2022-11-16 | 30-day Notice |
S733 | 2022-11-14 | 30-day Notice |
S732 | 2022-10-24 | 30-day Notice |
S731 | 2022-10-19 | 30-day Notice |
S730 | 2022-09-13 | 30-day Notice |
S729 | ||
S728 | 2022-09-13 | 30-day Notice |
S727 | 2022-08-22 | 30-day Notice |
S726 | 2022-08-19 | 30-day Notice |
S725 | 2022-08-02 | 30-day Notice |
S724 | 2022-07-21 | 30-day Notice |
S723 | ||
S722 | 2022-07-13 | 30-day Notice |
S721 | ||
S720 | 2022-06-03 | 30-day Notice |
S719 | 2022-05-26 | 30-day Notice |
S718 | 2022-05-20 | 30-day Notice |
S717 | 2022-05-11 | 30-day Notice |
S716 | ||
S715 | 2022-05-05 | 30-day Notice |
S714 | 2022-04-27 | 30-day Notice |
S713 | 2022-04-22 | 30-day Notice |
S712 | 2022-04-14 | 30-day Notice |
S711 | 2022-03-21 | 30-day Notice |
S710 | 2022-03-18 | 30-day Notice |
S709 | 2022-03-17 | 30-day Notice |
S708 | 2022-03-10 | 30-day Notice |
S707 | 2022-03-02 | 30-day Notice |
S706 | ||
S705 | 2022-02-24 | 30-day Notice |
S704 | 2022-02-23 | 30-day Notice |
S703 | 2022-02-10 | 30-day Notice |
S702 | 2022-01-18 | 30-day Notice |
S701 | 2022-01-13 | 30-day Notice |
S700 | 2022-01-10 | 30-day Notice |
S699 | 2021-12-17 | 30-day Notice |
S698 | 2021-12-02 | 30-day Notice |
S697 | 2021-11-30 | 30-day Notice |
S696 | 2021-11-18 | 30-day Notice |
S695 | 2021-11-17 | 30-day Notice |
S694 | ||
S693 | 2021-10-18 | 30-day Notice |
S692 | 2021-09-22 | 30-day Notice |
S691 | 2021-09-13 | 30-day Notice |
S690 | 2021-08-25 | 30-day Notice |
S689 | 2021-08-09 | 30-day Notice |
S688 | 2021-08-06 | 30-day Notice |
S687 | 2021-07-09 | 30-day Notice |
S686 | 2021-07-02 | 30-day Notice |
S685 | 2021-05-27 | 30-day Notice |
S684 | ||
S683 | ||
S682 | 2021-05-14 | 30-day Notice |
S681 | 2021-04-20 | 30-day Notice |
S680 | 2021-03-19 | 30-day Notice |
S679 | ||
S678 | 2021-03-08 | 30-day Notice |
S677 | ||
S676 | ||
S675 | 2021-02-25 | 30-day Notice |
S674 | ||
S673 | 2021-02-11 | 30-day Notice |
S672 | ||
S671 | ||
S670 | 2020-12-11 | Real-time Process |
S669 | 2020-12-08 | 30-day Notice |
S668 | 2020-12-07 | 30-day Notice |
S667 | ||
S666 | 2020-11-24 | 30-day Notice |
S665 | ||
S664 | ||
S663 | ||
S662 | 2020-11-17 | 30-day Notice |
S661 | 2020-11-13 | 30-day Notice |
S660 | 2020-11-03 | 30-day Notice |
S659 | ||
S658 | ||
S657 | 2020-10-20 | 30-day Notice |
S656 | 2020-10-19 | 30-day Notice |
S655 | ||
S654 | 2020-10-15 | 30-day Notice |
S653 | ||
S652 | 2020-10-02 | 30-day Notice |
S651 | ||
S650 | ||
S649 | ||
S648 | ||
S647 | 2020-09-14 | 30-day Notice |
S646 | ||
S645 | ||
S644 | 2020-09-14 | 30-day Notice |
S643 | 2020-09-11 | 30-day Notice |
S642 | 2020-09-04 | 30-day Notice |
S641 | 2020-09-04 | 30-day Notice |
S640 | 2020-09-03 | 30-day Notice |
S639 | 2020-08-28 | 30-day Notice |
S638 | ||
S637 | ||
S636 | 2020-07-27 | 30-day Notice |
S635 | 2020-07-14 | 30-day Notice |
S634 | 2020-07-09 | 30-day Notice |
S633 | 2020-07-06 | 30-day Notice |
S632 | 2020-07-02 | 30-day Notice |
S631 | 2020-06-26 | 30-day Notice |
S630 | 2020-06-16 | 30-day Notice |
S629 | ||
S628 | ||
S627 | 2020-05-15 | 30-day Notice |
S626 | 2020-04-27 | 30-day Notice |
S625 | 2020-04-08 | 30-day Notice |
S624 | 2020-03-25 | 30-day Notice |
S623 | 2020-03-16 | 30-day Notice |
S622 | 2020-03-16 | 30-day Notice |
S621 | 2020-03-12 | 30-day Notice |
S620 | 2020-03-02 | 30-day Notice |
S619 | ||
S618 | ||
S617 | 2020-02-24 | 30-day Notice |
S616 | ||
S615 | 2020-02-20 | 30-day Notice |
S614 | 2019-12-23 | Real-time Process |
S613 | 2019-12-20 | 30-day Notice |
S612 | 2019-12-11 | 30-day Notice |
S611 | 2019-12-10 | 30-day Notice |
S610 | 2019-11-25 | 30-day Notice |
S609 | 2019-11-18 | 30-day Notice |
S608 | ||
S607 | 2019-11-06 | 30-day Notice |
S606 | 2019-10-08 | 30-day Notice |
S605 | 2019-09-16 | 30-day Notice |
S604 | 2019-08-01 | 30-day Notice |
S603 | 2019-07-29 | 30-day Notice |
S602 | 2019-07-12 | 30-day Notice |
S601 | ||
S600 | 2019-07-01 | 30-day Notice |
S599 | 2019-06-20 | 30-day Notice |
S598 | 2019-06-11 | 30-day Notice |
S597 | 2019-06-10 | 30-day Notice |
S596 | 2019-05-30 | 30-day Notice |
S595 | ||
S594 | ||
S593 | 2019-05-06 | 30-day Notice |
S592 | 2019-04-29 | 30-day Notice |
S591 | 2019-04-29 | 30-day Notice |
S590 | 2019-04-23 | 30-day Notice |
S589 | 2019-04-11 | 30-day Notice |
S588 | 2019-04-08 | 30-day Notice |
S587 | ||
S586 | 2019-04-03 | 30-day Notice |
S585 | 2019-03-28 | 30-day Notice |
S584 | ||
S583 | ||
S582 | ||
S581 | ||
S580 | 2019-03-05 | 30-day Notice |
S579 | 2019-03-04 | 30-day Notice |
S578 | 2019-02-26 | 30-day Notice |
S577 | 2019-02-25 | 30-day Notice |
S576 | 2019-02-05 | Real-time Process |
S575 | 2019-01-23 | 30-day Notice |
S574 | 2018-12-10 | 30-day Notice |
S573 | 2018-11-16 | 30-day Notice |
S572 | 2018-11-08 | 30-day Notice |
S571 | 2018-11-05 | 30-day Notice |
S570 | 2018-11-01 | 30-day Notice |
S569 | 2018-10-26 | 30-day Notice |
S568 | 2018-10-23 | 30-day Notice |
S567 | 2018-10-18 | 30-day Notice |
S566 | 2018-10-15 | 30-day Notice |
S565 | 2018-10-09 | 30-day Notice |
S564 | 2018-09-26 | 30-day Notice |
S563 | 2018-09-13 | 30-day Notice |
S562 | 2018-08-29 | 30-day Notice |
S561 | 2018-08-22 | Real-time Process |
S560 | 2018-08-08 | 30-day Notice |
S559 | 2018-08-06 | 30-day Notice |
S558 | 2018-06-28 | Normal 180 Day Track No User Fee |
S557 | 2018-05-17 | 30-day Notice |
S556 | 2018-05-15 | 30-day Notice |
S555 | 2018-05-14 | 30-day Notice |
S554 | 2018-05-11 | 30-day Notice |
S553 | 2018-05-08 | 30-day Notice |
S552 | 2018-04-25 | 30-day Notice |
S551 | 2018-04-23 | 30-day Notice |
S550 | 2018-04-17 | Real-time Process |
S549 | 2018-04-13 | Normal 180 Day Track |
S548 | 2018-04-12 | 30-day Notice |
S547 | 2018-04-12 | 30-day Notice |
S546 | 2018-04-09 | 30-day Notice |
S545 | 2018-04-06 | 30-day Notice |
S544 | 2018-03-30 | 30-day Notice |
S543 | 2018-03-22 | 30-day Notice |
S542 | 2018-03-22 | 30-day Notice |
S541 | 2018-03-14 | 30-day Notice |
S540 | 2018-03-12 | 30-day Notice |
S539 | 2018-03-12 | 30-day Notice |
S538 | 2018-03-09 | 30-day Notice |
S537 | 2018-03-05 | 30-day Notice |
S536 | 2018-02-12 | Normal 180 Day Track |
S535 | 2018-02-08 | 30-day Notice |
S534 | 2018-02-01 | Real-time Process |
S533 | 2018-02-01 | 30-day Notice |
S532 | 2018-01-29 | Real-time Process |
S531 | 2018-01-24 | 30-day Notice |
S530 | ||
S529 | 2017-11-29 | 30-day Notice |
S528 | 2017-11-20 | 30-day Notice |
S527 | 2017-11-13 | 30-day Notice |
S526 | 2017-11-13 | 30-day Notice |
S525 | 2017-11-07 | 30-day Notice |
S524 | 2017-11-01 | 30-day Notice |
S523 | 2017-10-16 | 30-day Notice |
S522 | 2017-10-06 | 30-day Notice |
S521 | 2017-09-28 | 30-day Notice |
S520 | 2017-09-19 | 30-day Notice |
S519 | 2017-09-05 | Real-time Process |
S518 | 2017-08-31 | Normal 180 Day Track |
S517 | 2017-08-04 | 30-day Notice |
S516 | 2017-07-20 | 30-day Notice |
S515 | 2017-07-20 | 30-day Notice |
S514 | 2017-07-19 | 30-day Notice |
S513 | 2017-07-14 | Real-time Process |
S512 | 2017-06-27 | 30-day Notice |
S511 | 2017-06-23 | 30-day Notice |
S510 | 2017-06-16 | 30-day Notice |
S509 | 2017-06-08 | 30-day Notice |
S508 | 2017-06-07 | 30-day Notice |
S507 | 2017-05-18 | 30-day Notice |
S506 | 2017-05-18 | Normal 180 Day Track |
S505 | 2017-05-15 | 30-day Notice |
S504 | 2017-05-12 | 30-day Notice |
S503 | 2017-05-12 | 30-day Notice |
S502 | 2017-05-12 | 30-day Notice |
S501 | 2017-05-10 | 30-day Notice |
S500 | 2017-05-10 | 30-day Notice |
S499 | 2017-05-10 | 30-day Notice |
S498 | 2017-05-05 | 30-day Notice |
S497 | ||
S496 | 2017-04-04 | 30-day Notice |
S495 | 2017-04-03 | Normal 180 Day Track |
S494 | 2017-03-31 | 30-day Notice |
S493 | 2017-03-29 | 30-day Notice |
S492 | 2017-03-13 | 30-day Notice |
S491 | 2017-03-08 | 30-day Notice |
S490 | 2017-02-09 | 30-day Notice |
S489 | 2017-02-03 | 30-day Notice |
S488 | 2017-02-03 | 30-day Notice |
S487 | 2017-01-13 | 30-day Notice |
S486 | 2016-12-06 | Normal 180 Day Track |
S485 | 2016-11-23 | Real-time Process |
S484 | 2016-11-22 | 30-day Notice |
S483 | 2016-11-16 | Normal 180 Day Track |
S482 | 2016-11-14 | 30-day Notice |
S481 | 2016-11-02 | Normal 180 Day Track |
S480 | 2016-10-31 | 30-day Notice |
S479 | 2016-10-17 | 30-day Notice |
S478 | 2016-09-30 | Real-time Process |
S477 | 2016-09-28 | 30-day Notice |
S476 | 2016-09-26 | 30-day Notice |
S475 | 2016-09-12 | Normal 180 Day Track |
S474 | 2016-09-08 | Real-time Process |
S473 | 2016-08-17 | 30-day Notice |
S472 | 2016-07-22 | 30-day Notice |
S471 | 2016-07-13 | Real-time Process |
S470 | 2016-06-29 | Normal 180 Day Track |
S469 | 2016-06-24 | Real-time Process |
S468 | 2016-06-24 | 30-day Notice |
S467 | 2016-06-22 | 30-day Notice |
S466 | 2016-06-13 | 30-day Notice |
S465 | 2016-06-09 | 30-day Notice |
S464 | 2016-03-11 | Normal 180 Day Track |
S463 | 2016-04-25 | 30-day Notice |
S462 | 2016-04-11 | 30-day Notice |
S461 | 2016-03-31 | 30-day Notice |
S460 | 2016-03-18 | Real-time Process |
S459 | 2016-03-17 | 30-day Notice |
S458 | 2016-02-29 | 30-day Notice |
S457 | 2016-02-25 | 30-day Notice |
S456 | 2016-02-25 | 30-day Notice |
S455 | 2016-02-05 | 30-day Notice |
S454 | 2016-02-02 | 30-day Notice |
S453 | 2016-01-19 | 30-day Notice |
S452 | 2016-01-12 | Real-time Process |
S451 | 2015-12-28 | 30-day Notice |
S450 | 2015-12-18 | Real-time Process |
S449 | 2015-12-16 | 30-day Notice |
S448 | 2015-12-04 | 30-day Notice |
S447 | 2015-12-01 | Normal 180 Day Track |
S446 | 2015-10-22 | Real-time Process |
S445 | 2015-10-22 | Real-time Process |
S444 | 2015-10-19 | 30-day Notice |
S443 | 2015-10-16 | Real-time Process |
S442 | 2015-10-13 | Normal 180 Day Track |
S441 | 2015-09-30 | 30-day Notice |
S440 | 2015-09-30 | 30-day Notice |
S439 | ||
S438 | 2015-08-31 | 30-day Notice |
S437 | 2015-08-28 | Real-time Process |
S436 | 2015-08-12 | 30-day Notice |
S435 | 2015-08-11 | 30-day Notice |
S434 | 2015-08-05 | 30-day Notice |
S433 | 2015-07-20 | 30-day Notice |
S432 | 2015-07-09 | 30-day Notice |
S431 | 2015-07-02 | Real-time Process |
S430 | 2015-07-01 | 30-day Notice |
S429 | 2015-07-01 | 30-day Notice |
S428 | 2015-06-19 | 30-day Notice |
S427 | 2015-06-03 | 30-day Notice |
S426 | 2015-06-01 | 30-day Notice |
S425 | 2015-05-22 | 30-day Notice |
S424 | 2015-04-20 | Normal 180 Day Track |
S423 | 2015-04-17 | 30-day Notice |
S422 | 2015-04-16 | 30-day Notice |
S421 | 2015-04-14 | Real-time Process |
S420 | 2015-03-26 | Real-time Process |
S419 | 2015-03-24 | 30-day Notice |
S418 | 2015-03-24 | 30-day Notice |
S417 | 2015-03-23 | 30-day Notice |
S416 | 2015-03-23 | 30-day Notice |
S415 | 2015-03-06 | Real-time Process |
S414 | 2015-02-06 | 30-day Notice |
S413 | 2015-02-05 | 30-day Notice |
S412 | 2015-02-05 | 30-day Notice |
S411 | 2015-02-04 | 30-day Notice |
S410 | 2015-02-02 | 30-day Notice |
S409 | 2015-02-02 | 30-day Notice |
S408 | 2015-01-29 | 30-day Notice |
S407 | 2015-01-23 | 30-day Notice |
S406 | 2015-01-22 | 30-day Notice |
S405 | 2015-01-20 | 30-day Notice |
S404 | 2014-12-22 | Normal 180 Day Track |
S403 | 2014-12-05 | 30-day Notice |
S402 | 2014-12-04 | 30-day Notice |
S401 | 2014-11-19 | 30-day Notice |
S400 | ||
S399 | ||
S398 | 2014-10-14 | 30-day Notice |
S397 | 2014-10-07 | 30-day Notice |
S396 | 2014-10-02 | 30-day Notice |
S395 | 2014-09-19 | 30-day Notice |
S394 | 2014-09-09 | 30-day Notice |
S393 | 2014-08-27 | 30-day Notice |
S392 | 2014-08-27 | Real-time Process |
S391 | 2014-08-19 | Real-time Process |
S390 | 2014-08-18 | 30-day Notice |
S389 | 2014-08-06 | 30-day Notice |
S388 | 2014-08-01 | 30-day Notice |
S387 | 2014-07-25 | 30-day Notice |
S386 | 2014-07-24 | 30-day Notice |
S385 | 2014-07-23 | 30-day Notice |
S384 | 2014-07-18 | Normal 180 Day Track |
S383 | 2014-07-07 | 30-day Notice |
S382 | 2014-07-02 | Real-time Process |
S381 | 2014-06-19 | 30-day Notice |
S380 | 2014-06-13 | 30-day Notice |
S379 | 2014-06-06 | 30-day Notice |
S378 | 2014-05-23 | 30-day Notice |
S377 | 2014-05-08 | 30-day Notice |
S376 | 2014-05-01 | 30-day Notice |
S375 | 2014-04-25 | 30-day Notice |
S374 | 2014-04-23 | Normal 180 Day Track |
S373 | 2014-03-28 | Real-time Process |
S372 | 2014-03-28 | Real-time Process |
S371 | 2014-03-20 | 30-day Notice |
S370 | 2014-03-20 | 30-day Notice |
S369 | 2014-03-18 | Real-time Process |
S368 | 2014-03-07 | 30-day Notice |
S367 | 2014-02-27 | 30-day Notice |
S366 | 2014-01-30 | 30-day Notice |
S365 | 2014-01-29 | 30-day Notice |
S364 | 2014-01-27 | 30-day Notice |
S363 | 2014-01-22 | 30-day Notice |
S362 | 2013-12-24 | 30-day Notice |
S361 | 2013-12-23 | 30-day Notice |
S360 | 2013-12-19 | Real-time Process |
S359 | 2013-12-19 | 30-day Notice |
S358 | 2013-12-18 | Normal 180 Day Track |
S357 | ||
S356 | 2013-12-12 | 30-day Notice |
S355 | 2013-11-19 | 30-day Notice |
S354 | 2013-10-24 | 30-day Notice |
S353 | 2013-10-24 | 30-day Notice |
S352 | 2013-10-23 | 30-day Notice |
S351 | 2013-10-21 | 30-day Notice |
S350 | 2013-10-17 | 30-day Notice |
S349 | 2013-10-17 | 30-day Notice |
S348 | 2013-09-26 | 30-day Notice |
S347 | 2013-09-24 | 30-day Notice |
S346 | 2013-09-17 | 30-day Notice |
S345 | 2013-09-11 | 30-day Notice |
S344 | 2013-09-03 | 30-day Notice |
S343 | 2013-08-23 | Normal 180 Day Track |
S342 | 2013-08-21 | 30-day Notice |
S341 | 2013-08-12 | Real-time Process |
S340 | 2013-07-26 | 30-day Notice |
S339 | 2013-07-17 | 30-day Notice |
S338 | 2013-07-08 | Normal 180 Day Track |
S337 | 2013-07-02 | 30-day Notice |
S336 | 2013-06-24 | 30-day Notice |
S335 | ||
S334 | 2013-06-11 | Normal 180 Day Track |
S333 | 2013-06-07 | 30-day Notice |
S332 | 2013-06-07 | 30-day Notice |
S331 | 2013-05-30 | 30-day Notice |
S330 | 2013-05-29 | 30-day Notice |
S329 | 2013-05-21 | 30-day Notice |
S328 | 2013-05-17 | 30-day Notice |
S327 | 2013-05-17 | Real-time Process |
S326 | 2013-05-16 | Real-time Process |
S325 | 2013-05-13 | Real-time Process |
S324 | 2013-05-10 | 30-day Notice |
S323 | 2013-04-25 | 30-day Notice |
S322 | 2013-04-23 | 30-day Notice |
S321 | 2013-04-18 | Real-time Process |
S320 | 2013-04-17 | Real-time Process |
S319 | 2013-04-10 | Normal 180 Day Track No User Fee |
S318 | 2013-04-09 | 30-day Notice |
S317 | 2013-03-27 | Real-time Process |
S316 | 2013-03-27 | 30-day Notice |
S315 | 2013-03-13 | 30-day Notice |
S314 | 2013-03-11 | 30-day Notice |
S313 | 2013-03-05 | 30-day Notice |
S312 | 2013-03-04 | 30-day Notice |
S311 | 2013-02-26 | Normal 180 Day Track |
S310 | 2013-02-21 | 30-day Notice |
S309 | 2013-02-21 | 30-day Notice |
S308 | 2013-02-07 | 30-day Notice |
S307 | ||
S306 | 2013-01-29 | 30-day Notice |
S305 | 2013-01-25 | 30-day Notice |
S304 | 2013-01-22 | 30-day Notice |
S303 | 2013-01-14 | 30-day Notice |
S302 | ||
S301 | 2012-11-21 | 30-day Notice |
S300 | 2012-11-15 | 30-day Notice |
S299 | 2012-11-05 | 30-day Notice |
S298 | 2012-11-01 | Real-time Process |
S297 | 2012-10-19 | 30-day Notice |
S296 | 2012-10-19 | Real-time Process |
S295 | 2012-10-05 | 30-day Notice |
S294 | 2012-09-26 | 30-day Notice |
S293 | 2012-09-21 | 30-day Notice |
S292 | 2012-09-10 | 30-day Notice |
S291 | 2012-09-07 | 30-day Notice |
S290 | 2012-08-24 | Real-time Process |
S289 | 2012-08-21 | 30-day Notice |
S288 | 2012-08-21 | 30-day Notice |
S287 | 2012-08-13 | 30-day Notice |
S286 | 2012-08-08 | 30-day Notice |
S285 | 2012-08-03 | 30-day Notice |
S284 | 2012-07-31 | 30-day Notice |
S283 | 2012-07-25 | 30-day Notice |
S282 | 2012-07-25 | 30-day Notice |
S281 | 2012-07-23 | 30-day Notice |
S280 | 2012-07-17 | Normal 180 Day Track |
S279 | 2012-07-13 | 30-day Notice |
S278 | 2012-07-11 | 30-day Notice |
S277 | 2012-06-29 | Normal 180 Day Track |
S276 | 2012-06-29 | 30-day Notice |
S275 | 2012-06-29 | Real-time Process |
S274 | 2012-06-12 | 30-day Notice |
S273 | 2012-06-08 | 30-day Notice |
S272 | 2012-08-21 | Normal 180 Day Track |
S271 | 2012-05-17 | 30-day Notice |
S270 | 2012-08-21 | Normal 180 Day Track |
S269 | ||
S268 | 2012-04-04 | Real-time Process |
S267 | 2012-03-27 | 30-day Notice |
S266 | 2012-03-09 | 30-day Notice |
S265 | 2012-03-07 | 30-day Notice |
S264 | 2012-03-07 | Normal 180 Day Track |
S263 | 2012-03-05 | 30-day Notice |
S262 | 2012-02-29 | 30-day Notice |
S261 | 2012-02-27 | Real-time Process |
S260 | 2012-02-13 | 30-day Notice |
S259 | ||
S258 | 2012-02-07 | 30-day Notice |
S257 | 2012-02-03 | 30-day Notice |
S256 | ||
S255 | 2011-12-20 | 30-day Notice |
S254 | 2011-11-23 | 30-day Notice |
S253 | 2011-11-21 | Normal 180 Day Track |
S252 | 2011-11-17 | 135 Review Track For 30-day Notice |
S251 | ||
S250 | 2011-11-14 | 30-day Notice |
S249 | 2011-11-10 | Real-time Process |
S248 | 2011-10-26 | 30-day Notice |
S247 | 2011-10-25 | 30-day Notice |
S246 | 2011-10-06 | 30-day Notice |
S245 | 2011-10-05 | Real-time Process |
S244 | 2011-09-27 | Real-time Process |
S243 | 2011-09-22 | 30-day Notice |
S242 | 2011-09-19 | Real-time Process |
S241 | 2011-09-16 | 30-day Notice |
S240 | 2011-08-24 | 30-day Notice |
S239 | 2011-07-20 | 30-day Notice |
S238 | 2011-07-18 | 30-day Notice |
S237 | 2011-07-18 | 30-day Notice |
S236 | 2011-07-08 | 30-day Notice |
S235 | 2011-07-06 | 30-day Notice |
S234 | 2011-06-30 | 30-day Notice |
S233 | 2011-06-29 | 30-day Notice |
S232 | 2011-06-28 | 30-day Notice |
S231 | 2011-06-08 | 30-day Notice |
S230 | 2011-06-07 | 30-day Notice |
S229 | 2011-05-27 | 30-day Notice |
S228 | ||
S227 | 2011-05-17 | Real-time Process |
S226 | 2011-05-13 | 30-day Notice |
S225 | 2011-05-10 | 30-day Notice |
S224 | 2011-05-09 | 30-day Notice |
S223 | 2011-05-05 | Normal 180 Day Track No User Fee |
S222 | 2011-04-29 | 30-day Notice |
S221 | 2011-04-26 | 30-day Notice |
S220 | 2011-04-25 | 30-day Notice |
S219 | 2011-04-25 | Real-time Process |
S218 | 2011-04-21 | 30-day Notice |
S217 | 2011-04-19 | 30-day Notice |
S216 | 2011-04-15 | 30-day Notice |
S215 | 2011-04-11 | 30-day Notice |
S214 | 2011-04-05 | 30-day Notice |
S213 | 2011-04-04 | 30-day Notice |
S212 | ||
S211 | 2011-03-22 | 135 Review Track For 30-day Notice |
S210 | ||
S209 | 2011-03-09 | 135 Review Track For 30-day Notice |
S208 | 2011-03-08 | 30-day Notice |
S207 | 2011-03-02 | 30-day Notice |
S206 | 2011-02-18 | 30-day Notice |
S205 | 2011-02-16 | 30-day Notice |
S204 | 2011-02-16 | 30-day Notice |
S203 | 2011-02-03 | 30-day Notice |
S202 | 2011-02-01 | 30-day Notice |
S201 | 2011-01-25 | 30-day Notice |
S200 | 2011-01-04 | Normal 180 Day Track |
S199 | 2010-12-09 | 30-day Notice |
S198 | 2010-12-08 | 30-day Notice |
S197 | 2010-12-07 | Real-time Process |
S196 | 2010-11-17 | 30-day Notice |
S195 | 2010-11-15 | 30-day Notice |
S194 | 2010-11-12 | 30-day Notice |
S193 | 2010-11-12 | 30-day Notice |
S192 | 2010-11-09 | 30-day Notice |
S191 | 2010-10-26 | 30-day Notice |
S190 | 2010-10-15 | 30-day Notice |
S189 | 2010-10-12 | 30-day Notice |
S188 | 2010-09-16 | 30-day Notice |
S187 | 2010-08-13 | 30-day Notice |
S186 | 2010-08-10 | 30-day Notice |
S185 | 2010-07-29 | 30-day Notice |
S184 | 2010-07-28 | 30-day Notice |
S183 | 2010-07-26 | 30-day Notice |
S182 | 2010-07-20 | Real-time Process |
S181 | 2010-07-16 | 30-day Notice |
S180 | 2010-07-15 | 30-day Notice |
S179 | 2010-07-15 | 30-day Notice |
S178 | 2010-06-30 | 30-day Notice |
S177 | 2010-06-28 | 135 Review Track For 30-day Notice |
S176 | 2010-06-28 | 30-day Notice |
S175 | 2010-06-25 | 30-day Notice |
S174 | 2010-06-18 | 30-day Notice |
S173 | 2010-06-15 | Real-time Process |
S172 | 2010-06-10 | 30-day Notice |
S171 | 2010-06-02 | 30-day Notice |
S170 | 2010-05-27 | 30-day Notice |
S169 | 2010-05-20 | Real-time Process |
S168 | 2010-05-17 | Normal 180 Day Track |
S167 | 2010-05-03 | 30-day Notice |
S166 | 2010-04-22 | Normal 180 Day Track |
S165 | 2010-04-12 | 30-day Notice |
S164 | 2010-03-31 | 30-day Notice |
S163 | 2010-03-29 | 30-day Notice |
S162 | 2010-04-29 | Real-time Process |
S161 | 2010-03-01 | Real-time Process |
S160 | 2010-02-19 | 135 Review Track For 30-day Notice |
S159 | 2010-02-18 | 30-day Notice |
S158 | 2010-02-18 | 30-day Notice |
S157 | 2010-01-21 | 30-day Notice |
S156 | 2010-01-13 | 30-day Notice |
S155 | 2009-12-30 | Normal 180 Day Track No User Fee |
S154 | 2009-12-18 | 30-day Notice |
S153 | 2009-12-16 | Normal 180 Day Track |
S152 | 2009-12-08 | 30-day Notice |
S151 | 2009-12-07 | 30-day Notice |
S150 | 2009-12-02 | Normal 180 Day Track |
S149 | 2009-11-27 | 30-day Notice |
S148 | 2009-11-23 | 30-day Notice |
S147 | 2009-11-17 | Real-time Process |
S146 | 2009-10-08 | Normal 180 Day Track No User Fee |
S145 | 2009-10-08 | Real-time Process |
S144 | ||
S143 | 2009-09-11 | 30-day Notice |
S142 | 2009-09-08 | 30-day Notice |
S141 | 2009-09-08 | 30-day Notice |
S140 | 2009-07-28 | Real-time Process |
S139 | 2009-06-30 | 30-day Notice |
S138 | 2009-06-17 | Real-time Process |
S137 | 2009-06-11 | 30-day Notice |
S136 | 2009-03-27 | Normal 180 Day Track |
S135 | ||
S134 | 2009-03-06 | Normal 180 Day Track |
S133 | 2009-03-06 | 30-day Notice |
S132 | 2009-03-05 | 30-day Notice |
S131 | 2009-03-02 | Normal 180 Day Track |
S130 | 2009-02-18 | 135 Review Track For 30-day Notice |
S129 | 2009-02-13 | 135 Review Track For 30-day Notice |
S128 | 2009-02-09 | 135 Review Track For 30-day Notice |
S127 | 2009-02-02 | 30-day Notice |
S126 | 2008-12-15 | 30-day Notice |
S125 | 2008-12-11 | 30-day Notice |
S124 | 2008-12-03 | 30-day Notice |
S123 | 2008-11-26 | 30-day Notice |
S122 | 2008-11-20 | 30-day Notice |
S121 | ||
S120 | 2008-11-12 | 30-day Notice |
S119 | 2008-10-27 | Real-time Process |
S118 | 2008-10-17 | Real-time Process |
S117 | 2008-09-19 | 30-day Notice |
S116 | 2008-09-19 | 30-day Notice |
S115 | 2008-09-17 | 30-day Notice |
S114 | 2008-09-08 | 135 Review Track For 30-day Notice |
S113 | ||
S112 | 2008-08-18 | 30-day Notice |
S111 | 2008-08-12 | 30-day Notice |
S110 | 2008-08-11 | 30-day Notice |
S109 | 2008-08-11 | 135 Review Track For 30-day Notice |
S108 | 2008-08-04 | 135 Review Track For 30-day Notice |
S107 | 2008-07-28 | Normal 180 Day Track |
S106 | 2008-07-25 | 135 Review Track For 30-day Notice |
S105 | 2008-07-23 | 30-day Notice |
S104 | 2008-07-16 | 30-day Notice |
S103 | 2008-06-27 | 135 Review Track For 30-day Notice |
S102 | 2008-06-20 | 135 Review Track For 30-day Notice |
S101 | 2008-06-20 | 30-day Notice |
S100 | 2008-06-18 | 30-day Notice |
S099 | 2008-06-17 | Real-time Process |
S098 | 2008-06-02 | Normal 180 Day Track No User Fee |
S097 | 2008-06-02 | Normal 180 Day Track |
S096 | 2008-05-28 | 30-day Notice |
S095 | 2008-05-27 | 135 Review Track For 30-day Notice |
S094 | 2008-05-23 | 30-day Notice |
S093 | 2008-05-21 | 30-day Notice |
S092 | 2008-04-14 | 30-day Notice |
S091 | 2008-03-21 | 30-day Notice |
S090 | 2008-03-21 | 30-day Notice |
S089 | 2008-03-06 | 30-day Notice |
S088 | 2008-03-04 | 135 Review Track For 30-day Notice |
S087 | 2008-02-26 | 30-day Notice |
S086 | 2008-01-25 | 30-day Notice |
S085 | 2007-12-26 | 135 Review Track For 30-day Notice |
S084 | 2007-12-17 | 30-day Notice |
S083 | 2007-11-19 | 30-day Notice |
S082 | 2007-11-19 | 30-day Notice |
S081 | 2007-11-16 | Real-time Process |
S080 | 2007-10-11 | 30-day Notice |
S079 | 2007-09-28 | Normal 180 Day Track |
S078 | 2007-10-09 | 30-day Notice |
S077 | 2007-09-17 | 135 Review Track For 30-day Notice |
S076 | 2007-08-23 | Special (immediate Track) |
S075 | 2007-07-26 | Real-time Process |
S074 | 2007-06-11 | Real-time Process |
S073 | 2007-05-10 | Real-time Process |
S072 | 2007-03-09 | Real-time Process |
S071 | 2006-12-20 | Real-time Process |
S070 | 2006-12-14 | 30-day Notice |
S069 | 2006-12-01 | Normal 180 Day Track No User Fee |
S068 | 2006-11-28 | Real-time Process |
S067 | 2006-11-28 | 30-day Notice |
S066 | 2006-10-30 | Real-time Process |
S065 | 2006-10-30 | Normal 180 Day Track No User Fee |
S064 | 2006-10-17 | 30-day Notice |
S063 | 2006-10-13 | Real-time Process |
S062 | 2006-10-03 | Special (immediate Track) |
S061 | 2006-08-21 | Normal 180 Day Track No User Fee |
S060 | 2006-08-03 | 135 Review Track For 30-day Notice |
S059 | 2006-07-21 | Real-time Process |
S058 | 2006-07-13 | Real-time Process |
S057 | 2006-05-10 | 135 Review Track For 30-day Notice |
S056 | 2006-03-24 | 30-day Notice |
S055 | 2006-02-21 | Real-time Process |
S054 | 2006-02-14 | Real-time Process |
S053 | 2006-01-09 | Real-time Process |
S052 | 2005-12-09 | Normal 180 Day Track |
S051 | 2005-12-08 | Real-time Process |
S050 | 2005-10-26 | 135 Review Track For 30-day Notice |
S049 | 2005-10-06 | 135 Review Track For 30-day Notice |
S048 | ||
S047 | 2005-09-16 | Real-time Process |
S046 | 2005-08-12 | Real-time Process |
S045 | 2005-07-26 | 135 Review Track For 30-day Notice |
S044 | 2005-07-11 | Real-time Process |
S043 | 2005-07-01 | Normal 180 Day Track |
S042 | ||
S041 | 2005-01-27 | Normal 180 Day Track No User Fee |
S040 | 2004-11-19 | 30-day Notice |
S039 | 2004-08-27 | 30-day Notice |
S038 | 2004-04-27 | Normal 180 Day Track |
S037 | 2004-04-16 | Normal 180 Day Track No User Fee |
S036 | 2004-03-02 | Real-time Process |
S035 | 2004-02-12 | Real-time Process |
S034 | 2004-02-11 | Normal 180 Day Track No User Fee |
S033 | 2004-01-22 | Real-time Process |
S032 | 2003-08-29 | Normal 180 Day Track |
S031 | 2003-08-22 | Normal 180 Day Track No User Fee |
S030 | 2003-06-05 | Normal 180 Day Track |
S029 | 2003-05-12 | Real-time Process |
S028 | 2003-05-01 | Normal 180 Day Track No User Fee |
S027 | 2003-03-31 | Normal 180 Day Track |
S026 | 2003-01-27 | Real-time Process |
S025 | 2002-12-03 | Normal 180 Day Track |
S024 | 2002-04-08 | 30-day Notice |
S023 | 2002-03-12 | Special (immediate Track) |
S022 | 2002-02-27 | Normal 180 Day Track |
S021 | 2002-03-01 | Normal 180 Day Track |
S020 | 2002-02-14 | Normal 180 Day Track |
S019 | 2002-01-24 | Normal 180 Day Track |
S018 | 2002-01-17 | 30-day Notice |
S017 | 2001-11-30 | 30-day Notice |
S016 | 2001-11-05 | Special (immediate Track) |
S015 | 2001-10-05 | Normal 180 Day Track |
S014 | 2001-10-24 | Real-time Process |
S013 | 2001-09-17 | Panel Track |
S012 | 2001-09-24 | 30-day Notice |
S011 | 2001-07-16 | Normal 180 Day Track |
S010 | 2001-04-13 | Special (immediate Track) |
S009 | 2001-02-08 | Real-time Process |
S008 | 2000-09-14 | Real-time Process |
S007 | 2000-04-10 | Real-time Process |
S006 | 1999-12-06 | Special (immediate Track) |
S005 | 1999-11-30 | Real-time Process |
S004 | 1999-11-11 | Real-time Process |
S003 | 1999-05-19 | Real-time Process |
S002 | 1999-03-10 | Normal 180 Day Track |
S001 | 1999-03-10 | Real-time Process |