This medical device record is a pma supplement. A supplement may have changed the device description/function or indication from that approved in the original pma. Be sure to look at the original pma record for more information.
Approval of an mr-conditional system permitting implanted patients to undergo mri scans provided specified conditions are met. The devices, as modified, make up the advisa dr mri surescan system and will be marketed under the trade names advisa dr mri a2dr01 implantable pulse generator with software model 9995, carelink monitor model 2490g, cardiosight reader model 2020a and ddma model 2491. The advisa dr mri surescan system is indicated for the following: 1) rate adaptive pacing in patients who may benefit from increased pacing rates concurrent with increases in activity; and2) accepted patient conditions warranting chronic cardiac pacing include:a) symptomatic paroxysmal or permanent second-or third-degree a vblock; b) symptomatic bilateral bundle branch block; c) symptomatic paroxysmal or transient sinus node dysfunctions with or without associated a v conduction disorders d) bradycardia-tachycardia syndrome to prevent symptomatic bradycardia or some forms of symptomatic tachyarrhythmias; and e) vasovagal syndromes or hypersensitive carotid sinus syndromes. The device is also indicated for dual chamber and atrial tracking modes in patients who may benefit from maintenance of av synchrony. Dual chamber modes are specifically indicated for treatment of conduction disorders that require restoration of both rate and av synchrony, which include:1) various degrees of av block to maintain the atrial contribution tocardiac output; and 2) vvi intolerance (for example, pacemaker syndrome) in the presence of persistent sinus rhythmantitachycardia pacing (a tp) is indicated for termination of atrialtachyarrhythmias in bradycardia patients with one or more of the above pacing indications.
Device | ADVISA DR MRI A2DR01 IMPLANTABLE PULSE GENERATOR |
Classification Name | Pulse Generator, Permanent, Implantable |
Generic Name | Pulse Generator, Permanent, Implantable |
Applicant | MEDTRONIC Inc. |
Date Received | 2012-06-29 |
Decision Date | 2013-01-15 |
PMA | P980035 |
Supplement | S277 |
Product Code | NVZ |
Advisory Committee | Cardiovascular |
Supplement Type | Normal 180 Day Track |
Supplement Reason | Change Design/components/specifications/material |
Expedited Review | No |
Combination Product | No |
Applicant Address | MEDTRONIC Inc. 8200 Coral Sea Street Ne ms Mv S11 mounds View, MN 55112 |
Post-Approval Study: | Show Report Schedule and Study Progress |
Supplement Number | Date | Supplement Type |
---|---|---|
P980035 | Original Filing | |
S739 | 2023-01-23 | 30-day Notice |
S738 | 2023-01-09 | 30-day Notice |
S737 | 2023-01-09 | 30-day Notice |
S736 | 2022-12-15 | 30-day Notice |
S735 | 2022-11-16 | 30-day Notice |
S734 | 2022-11-16 | 30-day Notice |
S733 | 2022-11-14 | 30-day Notice |
S732 | 2022-10-24 | 30-day Notice |
S731 | 2022-10-19 | 30-day Notice |
S730 | 2022-09-13 | 30-day Notice |
S729 | ||
S728 | 2022-09-13 | 30-day Notice |
S727 | 2022-08-22 | 30-day Notice |
S726 | 2022-08-19 | 30-day Notice |
S725 | 2022-08-02 | 30-day Notice |
S724 | 2022-07-21 | 30-day Notice |
S723 | ||
S722 | 2022-07-13 | 30-day Notice |
S721 | ||
S720 | 2022-06-03 | 30-day Notice |
S719 | 2022-05-26 | 30-day Notice |
S718 | 2022-05-20 | 30-day Notice |
S717 | 2022-05-11 | 30-day Notice |
S716 | ||
S715 | 2022-05-05 | 30-day Notice |
S714 | 2022-04-27 | 30-day Notice |
S713 | 2022-04-22 | 30-day Notice |
S712 | 2022-04-14 | 30-day Notice |
S711 | 2022-03-21 | 30-day Notice |
S710 | 2022-03-18 | 30-day Notice |
S709 | 2022-03-17 | 30-day Notice |
S708 | 2022-03-10 | 30-day Notice |
S707 | 2022-03-02 | 30-day Notice |
S706 | ||
S705 | 2022-02-24 | 30-day Notice |
S704 | 2022-02-23 | 30-day Notice |
S703 | 2022-02-10 | 30-day Notice |
S702 | 2022-01-18 | 30-day Notice |
S701 | 2022-01-13 | 30-day Notice |
S700 | 2022-01-10 | 30-day Notice |
S699 | 2021-12-17 | 30-day Notice |
S698 | 2021-12-02 | 30-day Notice |
S697 | 2021-11-30 | 30-day Notice |
S696 | 2021-11-18 | 30-day Notice |
S695 | 2021-11-17 | 30-day Notice |
S694 | ||
S693 | 2021-10-18 | 30-day Notice |
S692 | 2021-09-22 | 30-day Notice |
S691 | 2021-09-13 | 30-day Notice |
S690 | 2021-08-25 | 30-day Notice |
S689 | 2021-08-09 | 30-day Notice |
S688 | 2021-08-06 | 30-day Notice |
S687 | 2021-07-09 | 30-day Notice |
S686 | 2021-07-02 | 30-day Notice |
S685 | 2021-05-27 | 30-day Notice |
S684 | ||
S683 | ||
S682 | 2021-05-14 | 30-day Notice |
S681 | 2021-04-20 | 30-day Notice |
S680 | 2021-03-19 | 30-day Notice |
S679 | ||
S678 | 2021-03-08 | 30-day Notice |
S677 | ||
S676 | ||
S675 | 2021-02-25 | 30-day Notice |
S674 | ||
S673 | 2021-02-11 | 30-day Notice |
S672 | ||
S671 | ||
S670 | 2020-12-11 | Real-time Process |
S669 | 2020-12-08 | 30-day Notice |
S668 | 2020-12-07 | 30-day Notice |
S667 | ||
S666 | 2020-11-24 | 30-day Notice |
S665 | ||
S664 | ||
S663 | ||
S662 | 2020-11-17 | 30-day Notice |
S661 | 2020-11-13 | 30-day Notice |
S660 | 2020-11-03 | 30-day Notice |
S659 | ||
S658 | ||
S657 | 2020-10-20 | 30-day Notice |
S656 | 2020-10-19 | 30-day Notice |
S655 | ||
S654 | 2020-10-15 | 30-day Notice |
S653 | ||
S652 | 2020-10-02 | 30-day Notice |
S651 | ||
S650 | ||
S649 | ||
S648 | ||
S647 | 2020-09-14 | 30-day Notice |
S646 | ||
S645 | ||
S644 | 2020-09-14 | 30-day Notice |
S643 | 2020-09-11 | 30-day Notice |
S642 | 2020-09-04 | 30-day Notice |
S641 | 2020-09-04 | 30-day Notice |
S640 | 2020-09-03 | 30-day Notice |
S639 | 2020-08-28 | 30-day Notice |
S638 | ||
S637 | ||
S636 | 2020-07-27 | 30-day Notice |
S635 | 2020-07-14 | 30-day Notice |
S634 | 2020-07-09 | 30-day Notice |
S633 | 2020-07-06 | 30-day Notice |
S632 | 2020-07-02 | 30-day Notice |
S631 | 2020-06-26 | 30-day Notice |
S630 | 2020-06-16 | 30-day Notice |
S629 | ||
S628 | ||
S627 | 2020-05-15 | 30-day Notice |
S626 | 2020-04-27 | 30-day Notice |
S625 | 2020-04-08 | 30-day Notice |
S624 | 2020-03-25 | 30-day Notice |
S623 | 2020-03-16 | 30-day Notice |
S622 | 2020-03-16 | 30-day Notice |
S621 | 2020-03-12 | 30-day Notice |
S620 | 2020-03-02 | 30-day Notice |
S619 | ||
S618 | ||
S617 | 2020-02-24 | 30-day Notice |
S616 | ||
S615 | 2020-02-20 | 30-day Notice |
S614 | 2019-12-23 | Real-time Process |
S613 | 2019-12-20 | 30-day Notice |
S612 | 2019-12-11 | 30-day Notice |
S611 | 2019-12-10 | 30-day Notice |
S610 | 2019-11-25 | 30-day Notice |
S609 | 2019-11-18 | 30-day Notice |
S608 | ||
S607 | 2019-11-06 | 30-day Notice |
S606 | 2019-10-08 | 30-day Notice |
S605 | 2019-09-16 | 30-day Notice |
S604 | 2019-08-01 | 30-day Notice |
S603 | 2019-07-29 | 30-day Notice |
S602 | 2019-07-12 | 30-day Notice |
S601 | ||
S600 | 2019-07-01 | 30-day Notice |
S599 | 2019-06-20 | 30-day Notice |
S598 | 2019-06-11 | 30-day Notice |
S597 | 2019-06-10 | 30-day Notice |
S596 | 2019-05-30 | 30-day Notice |
S595 | ||
S594 | ||
S593 | 2019-05-06 | 30-day Notice |
S592 | 2019-04-29 | 30-day Notice |
S591 | 2019-04-29 | 30-day Notice |
S590 | 2019-04-23 | 30-day Notice |
S589 | 2019-04-11 | 30-day Notice |
S588 | 2019-04-08 | 30-day Notice |
S587 | ||
S586 | 2019-04-03 | 30-day Notice |
S585 | 2019-03-28 | 30-day Notice |
S584 | ||
S583 | ||
S582 | ||
S581 | ||
S580 | 2019-03-05 | 30-day Notice |
S579 | 2019-03-04 | 30-day Notice |
S578 | 2019-02-26 | 30-day Notice |
S577 | 2019-02-25 | 30-day Notice |
S576 | 2019-02-05 | Real-time Process |
S575 | 2019-01-23 | 30-day Notice |
S574 | 2018-12-10 | 30-day Notice |
S573 | 2018-11-16 | 30-day Notice |
S572 | 2018-11-08 | 30-day Notice |
S571 | 2018-11-05 | 30-day Notice |
S570 | 2018-11-01 | 30-day Notice |
S569 | 2018-10-26 | 30-day Notice |
S568 | 2018-10-23 | 30-day Notice |
S567 | 2018-10-18 | 30-day Notice |
S566 | 2018-10-15 | 30-day Notice |
S565 | 2018-10-09 | 30-day Notice |
S564 | 2018-09-26 | 30-day Notice |
S563 | 2018-09-13 | 30-day Notice |
S562 | 2018-08-29 | 30-day Notice |
S561 | 2018-08-22 | Real-time Process |
S560 | 2018-08-08 | 30-day Notice |
S559 | 2018-08-06 | 30-day Notice |
S558 | 2018-06-28 | Normal 180 Day Track No User Fee |
S557 | 2018-05-17 | 30-day Notice |
S556 | 2018-05-15 | 30-day Notice |
S555 | 2018-05-14 | 30-day Notice |
S554 | 2018-05-11 | 30-day Notice |
S553 | 2018-05-08 | 30-day Notice |
S552 | 2018-04-25 | 30-day Notice |
S551 | 2018-04-23 | 30-day Notice |
S550 | 2018-04-17 | Real-time Process |
S549 | 2018-04-13 | Normal 180 Day Track |
S548 | 2018-04-12 | 30-day Notice |
S547 | 2018-04-12 | 30-day Notice |
S546 | 2018-04-09 | 30-day Notice |
S545 | 2018-04-06 | 30-day Notice |
S544 | 2018-03-30 | 30-day Notice |
S543 | 2018-03-22 | 30-day Notice |
S542 | 2018-03-22 | 30-day Notice |
S541 | 2018-03-14 | 30-day Notice |
S540 | 2018-03-12 | 30-day Notice |
S539 | 2018-03-12 | 30-day Notice |
S538 | 2018-03-09 | 30-day Notice |
S537 | 2018-03-05 | 30-day Notice |
S536 | 2018-02-12 | Normal 180 Day Track |
S535 | 2018-02-08 | 30-day Notice |
S534 | 2018-02-01 | Real-time Process |
S533 | 2018-02-01 | 30-day Notice |
S532 | 2018-01-29 | Real-time Process |
S531 | 2018-01-24 | 30-day Notice |
S530 | ||
S529 | 2017-11-29 | 30-day Notice |
S528 | 2017-11-20 | 30-day Notice |
S527 | 2017-11-13 | 30-day Notice |
S526 | 2017-11-13 | 30-day Notice |
S525 | 2017-11-07 | 30-day Notice |
S524 | 2017-11-01 | 30-day Notice |
S523 | 2017-10-16 | 30-day Notice |
S522 | 2017-10-06 | 30-day Notice |
S521 | 2017-09-28 | 30-day Notice |
S520 | 2017-09-19 | 30-day Notice |
S519 | 2017-09-05 | Real-time Process |
S518 | 2017-08-31 | Normal 180 Day Track |
S517 | 2017-08-04 | 30-day Notice |
S516 | 2017-07-20 | 30-day Notice |
S515 | 2017-07-20 | 30-day Notice |
S514 | 2017-07-19 | 30-day Notice |
S513 | 2017-07-14 | Real-time Process |
S512 | 2017-06-27 | 30-day Notice |
S511 | 2017-06-23 | 30-day Notice |
S510 | 2017-06-16 | 30-day Notice |
S509 | 2017-06-08 | 30-day Notice |
S508 | 2017-06-07 | 30-day Notice |
S507 | 2017-05-18 | 30-day Notice |
S506 | 2017-05-18 | Normal 180 Day Track |
S505 | 2017-05-15 | 30-day Notice |
S504 | 2017-05-12 | 30-day Notice |
S503 | 2017-05-12 | 30-day Notice |
S502 | 2017-05-12 | 30-day Notice |
S501 | 2017-05-10 | 30-day Notice |
S500 | 2017-05-10 | 30-day Notice |
S499 | 2017-05-10 | 30-day Notice |
S498 | 2017-05-05 | 30-day Notice |
S497 | ||
S496 | 2017-04-04 | 30-day Notice |
S495 | 2017-04-03 | Normal 180 Day Track |
S494 | 2017-03-31 | 30-day Notice |
S493 | 2017-03-29 | 30-day Notice |
S492 | 2017-03-13 | 30-day Notice |
S491 | 2017-03-08 | 30-day Notice |
S490 | 2017-02-09 | 30-day Notice |
S489 | 2017-02-03 | 30-day Notice |
S488 | 2017-02-03 | 30-day Notice |
S487 | 2017-01-13 | 30-day Notice |
S486 | 2016-12-06 | Normal 180 Day Track |
S485 | 2016-11-23 | Real-time Process |
S484 | 2016-11-22 | 30-day Notice |
S483 | 2016-11-16 | Normal 180 Day Track |
S482 | 2016-11-14 | 30-day Notice |
S481 | 2016-11-02 | Normal 180 Day Track |
S480 | 2016-10-31 | 30-day Notice |
S479 | 2016-10-17 | 30-day Notice |
S478 | 2016-09-30 | Real-time Process |
S477 | 2016-09-28 | 30-day Notice |
S476 | 2016-09-26 | 30-day Notice |
S475 | 2016-09-12 | Normal 180 Day Track |
S474 | 2016-09-08 | Real-time Process |
S473 | 2016-08-17 | 30-day Notice |
S472 | 2016-07-22 | 30-day Notice |
S471 | 2016-07-13 | Real-time Process |
S470 | 2016-06-29 | Normal 180 Day Track |
S469 | 2016-06-24 | Real-time Process |
S468 | 2016-06-24 | 30-day Notice |
S467 | 2016-06-22 | 30-day Notice |
S466 | 2016-06-13 | 30-day Notice |
S465 | 2016-06-09 | 30-day Notice |
S464 | 2016-03-11 | Normal 180 Day Track |
S463 | 2016-04-25 | 30-day Notice |
S462 | 2016-04-11 | 30-day Notice |
S461 | 2016-03-31 | 30-day Notice |
S460 | 2016-03-18 | Real-time Process |
S459 | 2016-03-17 | 30-day Notice |
S458 | 2016-02-29 | 30-day Notice |
S457 | 2016-02-25 | 30-day Notice |
S456 | 2016-02-25 | 30-day Notice |
S455 | 2016-02-05 | 30-day Notice |
S454 | 2016-02-02 | 30-day Notice |
S453 | 2016-01-19 | 30-day Notice |
S452 | 2016-01-12 | Real-time Process |
S451 | 2015-12-28 | 30-day Notice |
S450 | 2015-12-18 | Real-time Process |
S449 | 2015-12-16 | 30-day Notice |
S448 | 2015-12-04 | 30-day Notice |
S447 | 2015-12-01 | Normal 180 Day Track |
S446 | 2015-10-22 | Real-time Process |
S445 | 2015-10-22 | Real-time Process |
S444 | 2015-10-19 | 30-day Notice |
S443 | 2015-10-16 | Real-time Process |
S442 | 2015-10-13 | Normal 180 Day Track |
S441 | 2015-09-30 | 30-day Notice |
S440 | 2015-09-30 | 30-day Notice |
S439 | ||
S438 | 2015-08-31 | 30-day Notice |
S437 | 2015-08-28 | Real-time Process |
S436 | 2015-08-12 | 30-day Notice |
S435 | 2015-08-11 | 30-day Notice |
S434 | 2015-08-05 | 30-day Notice |
S433 | 2015-07-20 | 30-day Notice |
S432 | 2015-07-09 | 30-day Notice |
S431 | 2015-07-02 | Real-time Process |
S430 | 2015-07-01 | 30-day Notice |
S429 | 2015-07-01 | 30-day Notice |
S428 | 2015-06-19 | 30-day Notice |
S427 | 2015-06-03 | 30-day Notice |
S426 | 2015-06-01 | 30-day Notice |
S425 | 2015-05-22 | 30-day Notice |
S424 | 2015-04-20 | Normal 180 Day Track |
S423 | 2015-04-17 | 30-day Notice |
S422 | 2015-04-16 | 30-day Notice |
S421 | 2015-04-14 | Real-time Process |
S420 | 2015-03-26 | Real-time Process |
S419 | 2015-03-24 | 30-day Notice |
S418 | 2015-03-24 | 30-day Notice |
S417 | 2015-03-23 | 30-day Notice |
S416 | 2015-03-23 | 30-day Notice |
S415 | 2015-03-06 | Real-time Process |
S414 | 2015-02-06 | 30-day Notice |
S413 | 2015-02-05 | 30-day Notice |
S412 | 2015-02-05 | 30-day Notice |
S411 | 2015-02-04 | 30-day Notice |
S410 | 2015-02-02 | 30-day Notice |
S409 | 2015-02-02 | 30-day Notice |
S408 | 2015-01-29 | 30-day Notice |
S407 | 2015-01-23 | 30-day Notice |
S406 | 2015-01-22 | 30-day Notice |
S405 | 2015-01-20 | 30-day Notice |
S404 | 2014-12-22 | Normal 180 Day Track |
S403 | 2014-12-05 | 30-day Notice |
S402 | 2014-12-04 | 30-day Notice |
S401 | 2014-11-19 | 30-day Notice |
S400 | ||
S399 | ||
S398 | 2014-10-14 | 30-day Notice |
S397 | 2014-10-07 | 30-day Notice |
S396 | 2014-10-02 | 30-day Notice |
S395 | 2014-09-19 | 30-day Notice |
S394 | 2014-09-09 | 30-day Notice |
S393 | 2014-08-27 | 30-day Notice |
S392 | 2014-08-27 | Real-time Process |
S391 | 2014-08-19 | Real-time Process |
S390 | 2014-08-18 | 30-day Notice |
S389 | 2014-08-06 | 30-day Notice |
S388 | 2014-08-01 | 30-day Notice |
S387 | 2014-07-25 | 30-day Notice |
S386 | 2014-07-24 | 30-day Notice |
S385 | 2014-07-23 | 30-day Notice |
S384 | 2014-07-18 | Normal 180 Day Track |
S383 | 2014-07-07 | 30-day Notice |
S382 | 2014-07-02 | Real-time Process |
S381 | 2014-06-19 | 30-day Notice |
S380 | 2014-06-13 | 30-day Notice |
S379 | 2014-06-06 | 30-day Notice |
S378 | 2014-05-23 | 30-day Notice |
S377 | 2014-05-08 | 30-day Notice |
S376 | 2014-05-01 | 30-day Notice |
S375 | 2014-04-25 | 30-day Notice |
S374 | 2014-04-23 | Normal 180 Day Track |
S373 | 2014-03-28 | Real-time Process |
S372 | 2014-03-28 | Real-time Process |
S371 | 2014-03-20 | 30-day Notice |
S370 | 2014-03-20 | 30-day Notice |
S369 | 2014-03-18 | Real-time Process |
S368 | 2014-03-07 | 30-day Notice |
S367 | 2014-02-27 | 30-day Notice |
S366 | 2014-01-30 | 30-day Notice |
S365 | 2014-01-29 | 30-day Notice |
S364 | 2014-01-27 | 30-day Notice |
S363 | 2014-01-22 | 30-day Notice |
S362 | 2013-12-24 | 30-day Notice |
S361 | 2013-12-23 | 30-day Notice |
S360 | 2013-12-19 | Real-time Process |
S359 | 2013-12-19 | 30-day Notice |
S358 | 2013-12-18 | Normal 180 Day Track |
S357 | ||
S356 | 2013-12-12 | 30-day Notice |
S355 | 2013-11-19 | 30-day Notice |
S354 | 2013-10-24 | 30-day Notice |
S353 | 2013-10-24 | 30-day Notice |
S352 | 2013-10-23 | 30-day Notice |
S351 | 2013-10-21 | 30-day Notice |
S350 | 2013-10-17 | 30-day Notice |
S349 | 2013-10-17 | 30-day Notice |
S348 | 2013-09-26 | 30-day Notice |
S347 | 2013-09-24 | 30-day Notice |
S346 | 2013-09-17 | 30-day Notice |
S345 | 2013-09-11 | 30-day Notice |
S344 | 2013-09-03 | 30-day Notice |
S343 | 2013-08-23 | Normal 180 Day Track |
S342 | 2013-08-21 | 30-day Notice |
S341 | 2013-08-12 | Real-time Process |
S340 | 2013-07-26 | 30-day Notice |
S339 | 2013-07-17 | 30-day Notice |
S338 | 2013-07-08 | Normal 180 Day Track |
S337 | 2013-07-02 | 30-day Notice |
S336 | 2013-06-24 | 30-day Notice |
S335 | ||
S334 | 2013-06-11 | Normal 180 Day Track |
S333 | 2013-06-07 | 30-day Notice |
S332 | 2013-06-07 | 30-day Notice |
S331 | 2013-05-30 | 30-day Notice |
S330 | 2013-05-29 | 30-day Notice |
S329 | 2013-05-21 | 30-day Notice |
S328 | 2013-05-17 | 30-day Notice |
S327 | 2013-05-17 | Real-time Process |
S326 | 2013-05-16 | Real-time Process |
S325 | 2013-05-13 | Real-time Process |
S324 | 2013-05-10 | 30-day Notice |
S323 | 2013-04-25 | 30-day Notice |
S322 | 2013-04-23 | 30-day Notice |
S321 | 2013-04-18 | Real-time Process |
S320 | 2013-04-17 | Real-time Process |
S319 | 2013-04-10 | Normal 180 Day Track No User Fee |
S318 | 2013-04-09 | 30-day Notice |
S317 | 2013-03-27 | Real-time Process |
S316 | 2013-03-27 | 30-day Notice |
S315 | 2013-03-13 | 30-day Notice |
S314 | 2013-03-11 | 30-day Notice |
S313 | 2013-03-05 | 30-day Notice |
S312 | 2013-03-04 | 30-day Notice |
S311 | 2013-02-26 | Normal 180 Day Track |
S310 | 2013-02-21 | 30-day Notice |
S309 | 2013-02-21 | 30-day Notice |
S308 | 2013-02-07 | 30-day Notice |
S307 | ||
S306 | 2013-01-29 | 30-day Notice |
S305 | 2013-01-25 | 30-day Notice |
S304 | 2013-01-22 | 30-day Notice |
S303 | 2013-01-14 | 30-day Notice |
S302 | ||
S301 | 2012-11-21 | 30-day Notice |
S300 | 2012-11-15 | 30-day Notice |
S299 | 2012-11-05 | 30-day Notice |
S298 | 2012-11-01 | Real-time Process |
S297 | 2012-10-19 | 30-day Notice |
S296 | 2012-10-19 | Real-time Process |
S295 | 2012-10-05 | 30-day Notice |
S294 | 2012-09-26 | 30-day Notice |
S293 | 2012-09-21 | 30-day Notice |
S292 | 2012-09-10 | 30-day Notice |
S291 | 2012-09-07 | 30-day Notice |
S290 | 2012-08-24 | Real-time Process |
S289 | 2012-08-21 | 30-day Notice |
S288 | 2012-08-21 | 30-day Notice |
S287 | 2012-08-13 | 30-day Notice |
S286 | 2012-08-08 | 30-day Notice |
S285 | 2012-08-03 | 30-day Notice |
S284 | 2012-07-31 | 30-day Notice |
S283 | 2012-07-25 | 30-day Notice |
S282 | 2012-07-25 | 30-day Notice |
S281 | 2012-07-23 | 30-day Notice |
S280 | 2012-07-17 | Normal 180 Day Track |
S279 | 2012-07-13 | 30-day Notice |
S278 | 2012-07-11 | 30-day Notice |
S277 | 2012-06-29 | Normal 180 Day Track |
S276 | 2012-06-29 | 30-day Notice |
S275 | 2012-06-29 | Real-time Process |
S274 | 2012-06-12 | 30-day Notice |
S273 | 2012-06-08 | 30-day Notice |
S272 | 2012-08-21 | Normal 180 Day Track |
S271 | 2012-05-17 | 30-day Notice |
S270 | 2012-08-21 | Normal 180 Day Track |
S269 | ||
S268 | 2012-04-04 | Real-time Process |
S267 | 2012-03-27 | 30-day Notice |
S266 | 2012-03-09 | 30-day Notice |
S265 | 2012-03-07 | 30-day Notice |
S264 | 2012-03-07 | Normal 180 Day Track |
S263 | 2012-03-05 | 30-day Notice |
S262 | 2012-02-29 | 30-day Notice |
S261 | 2012-02-27 | Real-time Process |
S260 | 2012-02-13 | 30-day Notice |
S259 | ||
S258 | 2012-02-07 | 30-day Notice |
S257 | 2012-02-03 | 30-day Notice |
S256 | ||
S255 | 2011-12-20 | 30-day Notice |
S254 | 2011-11-23 | 30-day Notice |
S253 | 2011-11-21 | Normal 180 Day Track |
S252 | 2011-11-17 | 135 Review Track For 30-day Notice |
S251 | ||
S250 | 2011-11-14 | 30-day Notice |
S249 | 2011-11-10 | Real-time Process |
S248 | 2011-10-26 | 30-day Notice |
S247 | 2011-10-25 | 30-day Notice |
S246 | 2011-10-06 | 30-day Notice |
S245 | 2011-10-05 | Real-time Process |
S244 | 2011-09-27 | Real-time Process |
S243 | 2011-09-22 | 30-day Notice |
S242 | 2011-09-19 | Real-time Process |
S241 | 2011-09-16 | 30-day Notice |
S240 | 2011-08-24 | 30-day Notice |
S239 | 2011-07-20 | 30-day Notice |
S238 | 2011-07-18 | 30-day Notice |
S237 | 2011-07-18 | 30-day Notice |
S236 | 2011-07-08 | 30-day Notice |
S235 | 2011-07-06 | 30-day Notice |
S234 | 2011-06-30 | 30-day Notice |
S233 | 2011-06-29 | 30-day Notice |
S232 | 2011-06-28 | 30-day Notice |
S231 | 2011-06-08 | 30-day Notice |
S230 | 2011-06-07 | 30-day Notice |
S229 | 2011-05-27 | 30-day Notice |
S228 | ||
S227 | 2011-05-17 | Real-time Process |
S226 | 2011-05-13 | 30-day Notice |
S225 | 2011-05-10 | 30-day Notice |
S224 | 2011-05-09 | 30-day Notice |
S223 | 2011-05-05 | Normal 180 Day Track No User Fee |
S222 | 2011-04-29 | 30-day Notice |
S221 | 2011-04-26 | 30-day Notice |
S220 | 2011-04-25 | 30-day Notice |
S219 | 2011-04-25 | Real-time Process |
S218 | 2011-04-21 | 30-day Notice |
S217 | 2011-04-19 | 30-day Notice |
S216 | 2011-04-15 | 30-day Notice |
S215 | 2011-04-11 | 30-day Notice |
S214 | 2011-04-05 | 30-day Notice |
S213 | 2011-04-04 | 30-day Notice |
S212 | ||
S211 | 2011-03-22 | 135 Review Track For 30-day Notice |
S210 | ||
S209 | 2011-03-09 | 135 Review Track For 30-day Notice |
S208 | 2011-03-08 | 30-day Notice |
S207 | 2011-03-02 | 30-day Notice |
S206 | 2011-02-18 | 30-day Notice |
S205 | 2011-02-16 | 30-day Notice |
S204 | 2011-02-16 | 30-day Notice |
S203 | 2011-02-03 | 30-day Notice |
S202 | 2011-02-01 | 30-day Notice |
S201 | 2011-01-25 | 30-day Notice |
S200 | 2011-01-04 | Normal 180 Day Track |
S199 | 2010-12-09 | 30-day Notice |
S198 | 2010-12-08 | 30-day Notice |
S197 | 2010-12-07 | Real-time Process |
S196 | 2010-11-17 | 30-day Notice |
S195 | 2010-11-15 | 30-day Notice |
S194 | 2010-11-12 | 30-day Notice |
S193 | 2010-11-12 | 30-day Notice |
S192 | 2010-11-09 | 30-day Notice |
S191 | 2010-10-26 | 30-day Notice |
S190 | 2010-10-15 | 30-day Notice |
S189 | 2010-10-12 | 30-day Notice |
S188 | 2010-09-16 | 30-day Notice |
S187 | 2010-08-13 | 30-day Notice |
S186 | 2010-08-10 | 30-day Notice |
S185 | 2010-07-29 | 30-day Notice |
S184 | 2010-07-28 | 30-day Notice |
S183 | 2010-07-26 | 30-day Notice |
S182 | 2010-07-20 | Real-time Process |
S181 | 2010-07-16 | 30-day Notice |
S180 | 2010-07-15 | 30-day Notice |
S179 | 2010-07-15 | 30-day Notice |
S178 | 2010-06-30 | 30-day Notice |
S177 | 2010-06-28 | 135 Review Track For 30-day Notice |
S176 | 2010-06-28 | 30-day Notice |
S175 | 2010-06-25 | 30-day Notice |
S174 | 2010-06-18 | 30-day Notice |
S173 | 2010-06-15 | Real-time Process |
S172 | 2010-06-10 | 30-day Notice |
S171 | 2010-06-02 | 30-day Notice |
S170 | 2010-05-27 | 30-day Notice |
S169 | 2010-05-20 | Real-time Process |
S168 | 2010-05-17 | Normal 180 Day Track |
S167 | 2010-05-03 | 30-day Notice |
S166 | 2010-04-22 | Normal 180 Day Track |
S165 | 2010-04-12 | 30-day Notice |
S164 | 2010-03-31 | 30-day Notice |
S163 | 2010-03-29 | 30-day Notice |
S162 | 2010-04-29 | Real-time Process |
S161 | 2010-03-01 | Real-time Process |
S160 | 2010-02-19 | 135 Review Track For 30-day Notice |
S159 | 2010-02-18 | 30-day Notice |
S158 | 2010-02-18 | 30-day Notice |
S157 | 2010-01-21 | 30-day Notice |
S156 | 2010-01-13 | 30-day Notice |
S155 | 2009-12-30 | Normal 180 Day Track No User Fee |
S154 | 2009-12-18 | 30-day Notice |
S153 | 2009-12-16 | Normal 180 Day Track |
S152 | 2009-12-08 | 30-day Notice |
S151 | 2009-12-07 | 30-day Notice |
S150 | 2009-12-02 | Normal 180 Day Track |
S149 | 2009-11-27 | 30-day Notice |
S148 | 2009-11-23 | 30-day Notice |
S147 | 2009-11-17 | Real-time Process |
S146 | 2009-10-08 | Normal 180 Day Track No User Fee |
S145 | 2009-10-08 | Real-time Process |
S144 | ||
S143 | 2009-09-11 | 30-day Notice |
S142 | 2009-09-08 | 30-day Notice |
S141 | 2009-09-08 | 30-day Notice |
S140 | 2009-07-28 | Real-time Process |
S139 | 2009-06-30 | 30-day Notice |
S138 | 2009-06-17 | Real-time Process |
S137 | 2009-06-11 | 30-day Notice |
S136 | 2009-03-27 | Normal 180 Day Track |
S135 | ||
S134 | 2009-03-06 | Normal 180 Day Track |
S133 | 2009-03-06 | 30-day Notice |
S132 | 2009-03-05 | 30-day Notice |
S131 | 2009-03-02 | Normal 180 Day Track |
S130 | 2009-02-18 | 135 Review Track For 30-day Notice |
S129 | 2009-02-13 | 135 Review Track For 30-day Notice |
S128 | 2009-02-09 | 135 Review Track For 30-day Notice |
S127 | 2009-02-02 | 30-day Notice |
S126 | 2008-12-15 | 30-day Notice |
S125 | 2008-12-11 | 30-day Notice |
S124 | 2008-12-03 | 30-day Notice |
S123 | 2008-11-26 | 30-day Notice |
S122 | 2008-11-20 | 30-day Notice |
S121 | ||
S120 | 2008-11-12 | 30-day Notice |
S119 | 2008-10-27 | Real-time Process |
S118 | 2008-10-17 | Real-time Process |
S117 | 2008-09-19 | 30-day Notice |
S116 | 2008-09-19 | 30-day Notice |
S115 | 2008-09-17 | 30-day Notice |
S114 | 2008-09-08 | 135 Review Track For 30-day Notice |
S113 | ||
S112 | 2008-08-18 | 30-day Notice |
S111 | 2008-08-12 | 30-day Notice |
S110 | 2008-08-11 | 30-day Notice |
S109 | 2008-08-11 | 135 Review Track For 30-day Notice |
S108 | 2008-08-04 | 135 Review Track For 30-day Notice |
S107 | 2008-07-28 | Normal 180 Day Track |
S106 | 2008-07-25 | 135 Review Track For 30-day Notice |
S105 | 2008-07-23 | 30-day Notice |
S104 | 2008-07-16 | 30-day Notice |
S103 | 2008-06-27 | 135 Review Track For 30-day Notice |
S102 | 2008-06-20 | 135 Review Track For 30-day Notice |
S101 | 2008-06-20 | 30-day Notice |
S100 | 2008-06-18 | 30-day Notice |
S099 | 2008-06-17 | Real-time Process |
S098 | 2008-06-02 | Normal 180 Day Track No User Fee |
S097 | 2008-06-02 | Normal 180 Day Track |
S096 | 2008-05-28 | 30-day Notice |
S095 | 2008-05-27 | 135 Review Track For 30-day Notice |
S094 | 2008-05-23 | 30-day Notice |
S093 | 2008-05-21 | 30-day Notice |
S092 | 2008-04-14 | 30-day Notice |
S091 | 2008-03-21 | 30-day Notice |
S090 | 2008-03-21 | 30-day Notice |
S089 | 2008-03-06 | 30-day Notice |
S088 | 2008-03-04 | 135 Review Track For 30-day Notice |
S087 | 2008-02-26 | 30-day Notice |
S086 | 2008-01-25 | 30-day Notice |
S085 | 2007-12-26 | 135 Review Track For 30-day Notice |
S084 | 2007-12-17 | 30-day Notice |
S083 | 2007-11-19 | 30-day Notice |
S082 | 2007-11-19 | 30-day Notice |
S081 | 2007-11-16 | Real-time Process |
S080 | 2007-10-11 | 30-day Notice |
S079 | 2007-09-28 | Normal 180 Day Track |
S078 | 2007-10-09 | 30-day Notice |
S077 | 2007-09-17 | 135 Review Track For 30-day Notice |
S076 | 2007-08-23 | Special (immediate Track) |
S075 | 2007-07-26 | Real-time Process |
S074 | 2007-06-11 | Real-time Process |
S073 | 2007-05-10 | Real-time Process |
S072 | 2007-03-09 | Real-time Process |
S071 | 2006-12-20 | Real-time Process |
S070 | 2006-12-14 | 30-day Notice |
S069 | 2006-12-01 | Normal 180 Day Track No User Fee |
S068 | 2006-11-28 | Real-time Process |
S067 | 2006-11-28 | 30-day Notice |
S066 | 2006-10-30 | Real-time Process |
S065 | 2006-10-30 | Normal 180 Day Track No User Fee |
S064 | 2006-10-17 | 30-day Notice |
S063 | 2006-10-13 | Real-time Process |
S062 | 2006-10-03 | Special (immediate Track) |
S061 | 2006-08-21 | Normal 180 Day Track No User Fee |
S060 | 2006-08-03 | 135 Review Track For 30-day Notice |
S059 | 2006-07-21 | Real-time Process |
S058 | 2006-07-13 | Real-time Process |
S057 | 2006-05-10 | 135 Review Track For 30-day Notice |
S056 | 2006-03-24 | 30-day Notice |
S055 | 2006-02-21 | Real-time Process |
S054 | 2006-02-14 | Real-time Process |
S053 | 2006-01-09 | Real-time Process |
S052 | 2005-12-09 | Normal 180 Day Track |
S051 | 2005-12-08 | Real-time Process |
S050 | 2005-10-26 | 135 Review Track For 30-day Notice |
S049 | 2005-10-06 | 135 Review Track For 30-day Notice |
S048 | ||
S047 | 2005-09-16 | Real-time Process |
S046 | 2005-08-12 | Real-time Process |
S045 | 2005-07-26 | 135 Review Track For 30-day Notice |
S044 | 2005-07-11 | Real-time Process |
S043 | 2005-07-01 | Normal 180 Day Track |
S042 | ||
S041 | 2005-01-27 | Normal 180 Day Track No User Fee |
S040 | 2004-11-19 | 30-day Notice |
S039 | 2004-08-27 | 30-day Notice |
S038 | 2004-04-27 | Normal 180 Day Track |
S037 | 2004-04-16 | Normal 180 Day Track No User Fee |
S036 | 2004-03-02 | Real-time Process |
S035 | 2004-02-12 | Real-time Process |
S034 | 2004-02-11 | Normal 180 Day Track No User Fee |
S033 | 2004-01-22 | Real-time Process |
S032 | 2003-08-29 | Normal 180 Day Track |
S031 | 2003-08-22 | Normal 180 Day Track No User Fee |
S030 | 2003-06-05 | Normal 180 Day Track |
S029 | 2003-05-12 | Real-time Process |
S028 | 2003-05-01 | Normal 180 Day Track No User Fee |
S027 | 2003-03-31 | Normal 180 Day Track |
S026 | 2003-01-27 | Real-time Process |
S025 | 2002-12-03 | Normal 180 Day Track |
S024 | 2002-04-08 | 30-day Notice |
S023 | 2002-03-12 | Special (immediate Track) |
S022 | 2002-02-27 | Normal 180 Day Track |
S021 | 2002-03-01 | Normal 180 Day Track |
S020 | 2002-02-14 | Normal 180 Day Track |
S019 | 2002-01-24 | Normal 180 Day Track |
S018 | 2002-01-17 | 30-day Notice |
S017 | 2001-11-30 | 30-day Notice |
S016 | 2001-11-05 | Special (immediate Track) |
S015 | 2001-10-05 | Normal 180 Day Track |
S014 | 2001-10-24 | Real-time Process |
S013 | 2001-09-17 | Panel Track |
S012 | 2001-09-24 | 30-day Notice |
S011 | 2001-07-16 | Normal 180 Day Track |
S010 | 2001-04-13 | Special (immediate Track) |
S009 | 2001-02-08 | Real-time Process |
S008 | 2000-09-14 | Real-time Process |
S007 | 2000-04-10 | Real-time Process |
S006 | 1999-12-06 | Special (immediate Track) |
S005 | 1999-11-30 | Real-time Process |
S004 | 1999-11-11 | Real-time Process |
S003 | 1999-05-19 | Real-time Process |
S002 | 1999-03-10 | Normal 180 Day Track |
S001 | 1999-03-10 | Real-time Process |